• Title/Summary/Keyword: Model construction

Search Result 8,658, Processing Time 0.042 seconds

Multiple Regression Technique for Productivity Analysis of the Jointed Plane Concrete Pavement (JPCP)

  • Yoo, Wi-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.268-276
    • /
    • 2008
  • In highway construction projects, concrete pavement productivity has been challenged with constructors and decision-makers; at present there are few methods available to accurately evaluate the factors impacting on it. Any inefficient method to analyze it leads to the excessive schedule, higher rehabilitation costs, shorter service life, and reduction of ride quality. To implement these negative outcomes, constructors or decision-makers need a systematic tool that can be used to categorize the factors related to construction productivity. This paper applies multiple regression technique for productivity analysis of the Jointed Plane Concrete Pavement (JPCP), identifies the significant factors, and provides a predictive model assisting in monitoring and managing the productivity of the JPCP construction process. The completed and progressive projects are employed to derive and assess the proposed model. The results are analyzed to illustrate its capabilities.

Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE (철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발)

  • Park, Sang-Min;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

A Study on the Model of Safety Management in the Construction Management (건설사업 관리 (CM)에서의 안전관리 모델에 관한 연구)

  • 김영수;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.47-57
    • /
    • 2003
  • Construction Management(CM) system, which was introduced some years ago to large national construction projects, such as the construction of Incheon New Airport, construction of high-speed railroad and World Cup stadiums, is considered to be still in its early stage and safety at each step of CM is very poorly controlled. In an attempt to improve such inferior safety management of domestic CM, this study made comparative analysis about operation system of safety management with CM system in domestic and abroad. Also suggested the model under consideration with CM, which is suitable for the situation of Korea.

  • PDF

A RESEARCH ANALYSIS ON EFFECTIVE LEARNING IN INTERNATIONAL CONSTRUCTION JOINT VENTURES

  • L.T. Zhang;W.F. Wong;Charles Y.J. Cheah
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.450-458
    • /
    • 2007
  • This paper presents the results of a statistical analysis and its research findings focusing on the learning aspect in the process of international joint ventures (IJVs). The contents of this paper is derived from a sample of 96 field cases based on a proposed conceptual model of effective learning for international construction joint ventures (ICJVs). The paper presents a brief review on the conceptual model with hypotheses and summarized the key results of statistical analysis including factor and multiple regression analysis for the testing of the validity of the proposed conceptual model and its associated research hypotheses. Among other research findings, the research confirms that ICJVs provides an excellent platform of in-action learning for construction organization and suggests that good outcomes in learning could be reaped by a company who has a clear learning intent from the beginning and subsequently take corresponding learning actions during the full process of the joint venture.

  • PDF

A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

Impact of Fluctuations in Construction Business on Insolvency of Construction Company by Size (건설경기 변동이 규모별 건설기업 부실화에 미치는 영향 분석)

  • Lee, Sanghyo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.147-156
    • /
    • 2016
  • This study analyzed the impact of changes in the construction business on construction company insolvency according to their size using the vector error correction model. First, this study applied EDF (Expected Default Frequency), which was calculated by KMV (Kealhofer, McQuown and Vasicek) model, as a variable to indicate the insolvency of construction companies. This study set 30 construction companies listed to KOSPI/KOSDAQ for estimating the EDF by size and construction companies were divided into two groups according to their size. To examine the construction business cycles, the amount of construction orders according to the type-residential, non-residential, and civil work- was used as a variable. The serial data was retrieved from TS2000 established by the Korea Listed Companies Association (KLCA), Statistics Korea. The analysis period was between the second quarter of 2001 and fourth quarter of 2015. As a result of calculating the EDF of construction companies by size, as it is generally known, the large-sized construction companies showed lower levels of insolvency than relatively smaller-sized construction companies. On the other hand, impulse response analysis based on VECM confirmed that the level of insolvency of large-scaled companies is more sensitive to business fluctuations than relatively smaller-sized construction companies, particularly changes in the residential construction market. Hence it is a major factor affecting the changes in insolvency of large-sized construction companies.

A study on the Application of Operation Model for Technical Proposal-Based Tender of Large Construction Project (대형공사에 효율적인 기술제안형 입찰방식 적용에 관한 연구)

  • Cho, Sung;Cho, Yong;Paek, Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.591-596
    • /
    • 2008
  • Success or failure highly depends on delivery method in construction projects. This paper mainly focused on operation model for technical proposal in Large construction projects. This operational model uses Technical Proposal-Based Tender. This project studied order and delivery method in large construction projects. And delivery systems of international and domestic market are researched, and then condition of delivery system and problems are derived from them. Especially, it researched that it is hard to reflect special feature in large construction projects. As a result of having referenced idea as describe above, this paper will be studied by this process. First, definition of delivery method and large construction projects is researched. Second, delivery systems of international and domestic market are checked. Third, problems and condition of delivery system in large construction projects are investigated. Fourth, application of operation model for technical proposal-based tender are presented in large construction projects.

  • PDF

Productivity Improvement by Application of Simulation based Tunneling Operation Planning Model - focused on NATM - (시뮬레이션 기반 터널공사계획모델 개발을 통한 생산성 향상 연구 - NATM 공법을 대상으로 -)

  • Lee, Si-Wook;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.127-136
    • /
    • 2008
  • The initial step in the construction process, estimating appropriate construction time and expense is the most important factor that would influence the result of the construction. In order to enhance productivity and efficiency, there is a need to analyze and manage rationally. The purpose of this project is to make a simulation model for all subway tunnel construction based on the NATM method, also give an support equipment that would make available to plan and analyze the construction. The development of simulation model is based on a real case construction analysis process and also on the reference data. It reflects restrictive elements, make it possible to modify the conditions, and not only adapt to our project's construction but other projects as well. The model developed by this project will be able to reasonably predict the construction completion time and support the process of decision making during the planning. Therefore we can expect the productivity and efficiency of the whole construction projects.

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF