Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE

철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발

  • 박상민 (경북대학교 건축.토목공학부 대학원) ;
  • 손창백 (세명대학교 건축공학과) ;
  • 이동은 (경북대학교 건축.토목공학부)
  • Published : 2012.05.18

Abstract

This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

Keywords