• Title/Summary/Keyword: IT in Construction

Search Result 21,564, Processing Time 0.046 seconds

A Correlation Analysis between the Change of Managerial Environment and the Business Performance of Domestic Construction Firms (국내 건설환경 변화와 기업경영성과의 상관관계 분석)

  • Lee, Dong-Hoon;Kim, Sun-Kuk;Shin, Dong-Hwa
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.111-121
    • /
    • 2009
  • Because of its unique characteristics, the construction industry tends to be affected by economic environment more than any other industries. The domestic construction industry was forced to change its management pattern and system when it went through the foreign currency crisis, and since then, the construction industry has been growing in terms of quality over last 10 years, breaking from the quantitative performance-oriented growth in the past. The study was intended to integrate the financial data of the companies during the period before and after the foreign currency crisis so as to analyze the effect of environmental changes on management performance of the companies. It was aimed at evaluating the changes to the stability, profitability and the growth potential, and collecting the data on variation of the market scale, price of resources such as material and labor and the financial environment, thereby analyzing the correlation with the management performance. The study, to deal with the difficulties which are anticipated, like the foreign currency crisis experienced in the past, was also intended to identify the correlation between the economic conditions and the performance of the construction companies, using the experimental data in the past.

Influence Factors Analysis on the Productivity of Management Manpower (건축현장 관리인력의 생산성 영향요인 조사 연구)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Sohn, Hyo-Won;Kim, Sun-Hyung;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.153-157
    • /
    • 2010
  • As the recent economic downturn continues to undermine the profits of construction industry in Korea, it has become ever more pressing to improve productivity of the industry. Since construction site management manpower staffing plan has close bearing on the productivity of construction projects, it is essential to estimate and mobilize adequate number of resources as per conditions and characteristics of each construction site. However, there are no reference approaches in practice to provide baseline for site management manpower staffing plan or estimation of manpower requirement. Therefore, this study aims to examine factors affecting productivity that warrants first and foremost consideration in development of site management manpower staffing plan during the initial phase of building construction project by conducting survey on industry stakehoders with hands-on responsibilities in construction sites and analyzing their responses. Conclusions herein will provide basic inputs for subsequent studies on development of site management manpower staffing plan as per project characteristics.

  • PDF

Effect of Construction Sites on Water Quality of Small Stream in Rural Area (농촌 소하천 유역의 건설 현장이 하천오염에 미치는 영향에 관한 연구)

  • Kim, Jun-Young;Chang, In-Soung
    • Journal of Environmental Science International
    • /
    • v.17 no.3
    • /
    • pp.297-303
    • /
    • 2008
  • For last couple of years many apartments, roads and bridges are constructed along the Kok-kyo stream which is penetrating Asan city, Chung-Nam Province. The effect of construction on stream environment was investigated in this study. Various kinds of water qualities of the Kok-kyo stream were monitored for 5 months. As it passed through the construction sites, $COD_{cr}$ concentration increased abruptly whereas the increment of the $BOD_5$ was not so great, indicating that non-biodegradable organics were flowed from the construction sites to the stream. Particularly, 0.2 mg/L of N-hexane was measured, which is believed to be mainly responsible for the organic pollution from construction sites. In spite of short periods of water quality monitoring, it could be concluded that there was a good correlation between construction sites and stream pollution. Therefore, legislative activity or enforced management by local government to the construction sites are needed for keeping the small stream environment better.

Evaluation as to whether field pour earth wall construction is possible (흙타설 벽체의 현장 시공 가능성 검토)

  • Hwang, Hey-Zoo;Kang, Nam-Yi;Yang, Jun-hyuk
    • KIEAE Journal
    • /
    • v.12 no.1
    • /
    • pp.99-104
    • /
    • 2012
  • In event of selecting construction materials, taking ones found easily around make embodied energy saved. The earth construction could be an eco-friendly engineering from a views of keeping the embodied energy. The pour earth method construction, as one of earth constructions, improves liquidity of earth-mixed properties to build walls or foundations. This study is aimed at evaluating possibilities as to machinery constructions using pumping cars or excavators to be applied on natural non-dried earth which are purchased from sites neighboring to subject building. The study showed that the pumping car used construction was smoothly carried out without any remarkable difficulties and further, a compressed strength was found to keep a certain degree to possibly construct low-story buildings. However, it showed some different levels as to a compressed strength by locations of buildings. In the construction course, we couldn't use remicon plants or a remicon due to field conditions and we are forced to take excavators in compounding or mixing works. But, it is evaluated that actually liquidity or compressed strength will be better than in case of using machineries like remicon plants. These results make us determine that the wall construction using machineries is possible.

RFID Technology Applications with PMIS for Managing RMC Truck Operations

  • Kim, Seung-Ho;Kim, Sang-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.468-481
    • /
    • 2011
  • This research presents a strategy and information system to manage the logistics of delivery ready mixed concrete (RMC) under the integrated environment of PMIS+RFID. PMIS is system tool and technique used in construction sectors to delivery information. Information that can be extracted electronically in real time is more valuable than data gathered and maintained manually. RFID technology can help to improve data accuracy through supply chains and by identifying products and objects at specific points through automatic identification. The objectives of these two implementations can be able to improve the efficiency of logistics management for RMC truck process, and to verify the technical and practical feasibility of PMIS+RFID application in construction industry. This may be realistic given the dynamics of daily activities on construction sites. This research is focused on examples on real world case study, applications and research theme related and connected to PMIS+RFID technology. It demonstrated that PMIS+RFID technology has been automatically implemented and has shown process information about the RMC truck and the overall status information about it, both quickly and accurately. As a result, the construction site where needs 300 $m^3$ pouring (50 RMC trucks) per day can be reduced total 250 minutes. Moreover, this time saving is related to the labour cost saving. From the case studies, RFID+PMIS system was proven in terms of effectiveness rather than current method.

DEVELOPMENT OF A WEB-BASED GEO-SPATIAL INFORMATION SYSTEM FOR THE ANALYSIS AND EVALUATION OF SOIL DATA

  • YongGu Jang;SangHoon Lee;HoYun Kang;InJoon Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1396-1403
    • /
    • 2009
  • The Ministry of Construction and Transportation (MOCT) has been constructing a nationwide soil information DB since 2000, as basic data for the construction of 'underground geographical information,' a project under the 2nd National Geo-spatial Information System (NGIS) master plan. The inputted soil information includes not only underground conditions such as the layer depth, type, color, and groundwater level, but also engineering information that can be applied to construction work design, such as on the standard penetration test and the compression test. It is difficult to use this information in soil analysis and design, however, because only the test results are currently available. A web-based geo-spatial information system was developed in this study to facilitate the effective application of the soil information database (DB). First, the space information, layer information, and engineering test information were loaded from the soil information DB in real time, and the earth volume, bearing capacity, and settlement were calculated to develop a web client that will evaluate the ground softness and liquefaction. It seems that the soil information DB can be actively applied to the planning and design of construction works using this system.

  • PDF

A Study of Priority of Policies for Strengthening Capability in the Information and Communication Work Business (스마트융합 환경 하의 정보통신공사업 역량강화를 위한 정책우선순위 연구)

  • Kwak, Jeong Ho;Park, Sang Soo;Kim, Jeong Yeon
    • Journal of Information Technology Services
    • /
    • v.14 no.3
    • /
    • pp.85-97
    • /
    • 2015
  • The information and communications construction business has the characteristics of an infrastructure industry and responsibility for the construction and maintenance of all ICT infrastructures. With the recent proliferation of the smart convergence of various industries based on ICT infrastructure, the role of the information and communications construction business has been highlighted to accommodate the convergence and implementation environment in construction and medical industries. Therefore, this paper seeks policy measures to establish the new role of the information and communications business under the rapidly developing smart convergence environment and the priorities of policy measures to strengthen the capability of the information and communications business using a quantitative model. The analysis result suggests that the difference in importance of each policy measure should be considered in order to execute effectively the policy of promoting the information and communications construction business. Given the constraint of limited budget, policy priorities include the development of new markets, and establishment of incentive for new technology. This study is significant for its theoretical contribution, being the first quantitative approach to policy priorities for the promotion of information and communications construction business under the smart convertgence environment.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

A Study for Derivation of Participant's Information Flow At Framework Construction based on BIM (BIM 기반의 골조공사에서 참여자별 정보의 흐름 도출에 관한 연구)

  • Kim, Yong-Hwa;Lee, Ju-Sung;Oh, Jung-Keun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.22-34
    • /
    • 2013
  • As construction project has been becoming larger, specialized and complicated, it is important to utilize a lot of information that is made by diverse participants. Especially this information is mainly produced in construction site that plays a leading role in construction project. The problem of information exchange between participants of construction site causes decline of construction productivity. So as to resolve this problem, there is a many interest in BIM(Building Information Modeling) that makes and manages a necessary data during building life cycle. But in Korea construction industry, applying BIM in construction phase is less active than in design phase. Through studying previous research, this study classify the main cause of failure related to information exchange in framework construction. And by interviewing expert, it draw a work that is possible to apply BIM. Next through analyzing framework construction site that is applied with BIM, this study proposes specific information flow model for supporting work by BIM.

Effects of new construction technology on performance of ultralong steel sheet pile cofferdams under tidal action

  • Li, Ping;Sun, Xinfei;Chen, Junjun;Shi, Jiangwei
    • Geomechanics and Engineering
    • /
    • v.27 no.6
    • /
    • pp.561-571
    • /
    • 2021
  • Cofferdams made of teel sheet piles are commonly utilized as support structures for excavation of sea-crossing bridge foundations. As cofferdams are often subject to tide variation, it is imperative to consider potential effects of tide on stability and serviceability of sheet piles, particularly, ultralong steel sheet piles (USSPs). In this study, a real USSP cofferdam constructed using new construction technology in Nanxi River was reported. The design of key parts of USSP cofferdam in the presence of tidal action was first introduced followed by the description of entire construction technology and associated monitoring results. Subsequently, a three-dimensional finite-element model corresponding to all construction steps was established to back-analyze measured deflection of USSPs. Finally, a series of parametric studies was carried out to investigate effects of tide level, soil parameters, support stiffness and construction sequence on lateral deflection of USSPs. Monitoring results indicate that the maximum deflection during construction occurred near the riverbed. In addition, measured stress of USSPs showed that stability of USSP cofferdam strengthened as construction stages proceeded. Moreover, the numerical back-analysis demonstrated that the USSP cofferdam fulfilled the safety requirements for construction under tidal action. The maximum deflection of USSPs subject to high tide was only 13.57 mm at a depth of -4 m. Sensitivity analyses results showed that the design of USSP cofferdam system must be further improved for construction in cohesionless soils. Furthermore, the 5th strut level before concreting played an indispensable role in controlling lateral deflection of USSPs. It was also observed that pumping out water before concreting base slab could greatly simplify and benefit construction program. On the other hand, the simplification in construction procedures could induce seepage inside the cofferdam, which additionally increased the deflection of USSPs by 10 mm on average.