• Title/Summary/Keyword: IS프로세스

Search Result 4,656, Processing Time 0.038 seconds

Knowledge Distribution Status of the Korean SMC's Technology Commercialization Process Using a Knowledge Map (지식지도를 이용한 중소기업 기술사업화 프로세스의 지식 유통 현황 분석)

  • Yoo, Keedong
    • The Journal of Society for e-Business Studies
    • /
    • v.23 no.2
    • /
    • pp.67-81
    • /
    • 2018
  • Technology commercialization is a reward process for companies' various trials and investment to develop technologies, which can be regarded as a way to figure out company's business performance. To successfully attain companies' purpose via technology commercialization, a variety of knowledge which triggers and completes business activities are needed. This paper suggests a methodology to analyze problems and solutions around the technology commercialization process in terms of knowledge distribution status, especially focused on Korean SMC cases. The knowledge map of this paper is constructed from the knowledge networks and identifies problems and solutions of the target process. A case study for applying proposed concepts to SMC's cases is also performed by checking knowledge distribution status and extracting practical implications. This paper's ideas can be regarded as one of references for SMCs to prepare technology commercialization with guaranteeing facilitated knowledge distribution and utilization.

A Process-driven IoT-object Collaboration Model (프로세스 기반 사물인터넷 객체 협업 모델)

  • Ahn, Hyun;Lee, Yongjoon;Kim, Kwanghoon Pio
    • Journal of Internet Computing and Services
    • /
    • v.15 no.5
    • /
    • pp.9-16
    • /
    • 2014
  • In recent years, the importance of IoT (Internet of Things) is emphasized by information communication technologies and the performance of various smart devices are rapidly developed and applied in the real world. In this paper, we propose a process-driven IoT-object collaboration model to specify and execute a IoT service based on processes. That is, the purpose of this paper is to suggest a formal method in order to describe a IoT service into a group of tasks having execution order and collaboration between IoT-objects in charge of the enactment of a task. Conclusively, through the proposed model, we expect that IoT services will be automatically executed, analyzed, monitored and reused in the process-driven IoT computing environment.

A Method of Building an Process Model-based CASE Tool to Support Software Development and Management (소프트웨어 개발관리를 지원하기 위한 프로세스 모델 기반 CASE 도구 구축방법의 제시)

  • Jo, Byeong-Ho;Kim, Tae-Dal
    • The Transactions of the Korea Information Processing Society
    • /
    • v.2 no.5
    • /
    • pp.721-732
    • /
    • 1995
  • The IPSE(Integrated Project Support Environment) tool can be seen as a result of an attempt to synthesize the key aspects of language-centered, specific methodology-based and toolkit oriented environments, which are current CASE tools into an organic whole. The IPSE approach based on a process model is regarded as an effective way to implement integrated CASE. The PM-CASE(Process Model based CASE) tool is currently a prototype which draw diagrams describing processes by using a new modeling technique. Attributes related with a task of withen the process model should be defined an saved the database. These attributed are used to retrieve the information of products, and to call the tool related which the task. In this paper, TSEE(Process centered Software Engineering Environment) tools are compared and analyzed. By describing the basic concept, architecture and design of PM-CASE tool, a method of building an process model-based CASE tool is proposed be support an effect software development and management.

  • PDF

Business Process Improvement of Defect Management in Apartment Housing Project (공동주택 하자관리 업무프로세스 개선)

  • Oh, Jung-Hwan;Song, Young-Woong;Choi, Yoon-Ki;Lim, Hyoung-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.16-27
    • /
    • 2009
  • Recently construction companies expand position for apartment house in construction market because of house supply rate increase and its amount. In addition, because the focus of house sale market has moved to customer from supplier, the importance of defect management is being issued currently. However, current apartment defect management is not satisfied with customer's demand for the lack of business process management, management organization, information feedback, and readiness for defect in construction phase. To solve this problem, this study proposed business process management improvement model for defect management. Proposed improvement model make information feedback, defect management business quality improvement, and improper process improvement through integrating defect management and quality management. It is expected to contribute to customer's satisfaction improvement and reliance improvement for construction companies.

The Node Scheduling of Multi-Threaded Process for CC-NUMA System (CC-NUMA 시스템을 위한 다중 스레드 프로세스의 노드 스케줄링 설계 및 구현)

  • Kim, Jeong-Nyeo;Kim, Hae-Jin;Lee, Cheol-Hoon
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.2
    • /
    • pp.488-496
    • /
    • 2000
  • this paper describes the design and implementation of node scheduling for MX Server that is CC-NUMA System COMSIX, the operating system of MX Server, is designed to suit for CC-NUMA Architecture. MX Server consists of up to 8 nodes, and each node is connected by SCI ring. This node scheduling scheme considers data locality for performance improvement of Oracle8i DBMS on the CC-NUMA architecture. For DBMS such as Oracle8i, a multi-threaded process may be run to tie on particular disk. We have developed a CG binding function that the multi-threaded process bound the node. Currently, We don't have an available CC-NUMA Platform. Instead of MX Server, we developed the Node scheduling scheme for multi-threaded process to suit server platform on the PC test-bed and tested completely.

  • PDF

A Total Design Process Using Design Structure Matrix (디자인 구조 매트릭스를 활용한 토탈 디자인프로세스에 관한 연구)

  • Lee, Jeong Hyun;Pan, Young Hwan
    • Design Convergence Study
    • /
    • v.15 no.5
    • /
    • pp.21-35
    • /
    • 2016
  • With subdivision of customers and markets, today, domains to design are expanding. When design merges with other spheres of design, it is important to convey a consistent message to customers. For delivering a message consistently and clearly, there is a need to reconcile different views in design processes. In this study, each design process was analyzed and the sequence was adjusted using the DSM methodology for understanding mutual dependent relations. For this, process activity elements were extracted with experts and a survey on related elements was conducted. Then the survey findings were divided for working out the sequence and based on the views regarding the sequence, a total design process was created.. As a result, the processes were combined into one sequence and there was a collaboration at the 10th stage. Also, a methodology used in collaboration and significant elements were analyzed. In conclusion, it is anticipated that this total design process would provide a more objective and scientific approach in collaboration among various spheres of design and help in reducing lead time.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Analyses the Digital Contents develope process and digital contents development example of digital contents companies in Korea (DC기업들의 디지털콘텐츠 개발사례 및 프로세스 분석)

  • Huh Moon-Haeng;Kim Jong-Hyuk
    • Journal of Digital Contents Society
    • /
    • v.6 no.1
    • /
    • pp.25-34
    • /
    • 2005
  • Our Country is working in a number of areas to prepare alternative plans for excelling in the 21 century`s which is also known as the era of services, unlike the era of manufacuring in the 20 century. Digital Content (DC) business is one of the alternative. This study is analyses tile process of healing DC as well as output of the process which is prodeuced by current DC developing companies. By this kind of process analysis, we will help process enhancement to produce wolrd-wide best DC product.

  • PDF

IoE Service Process Research to Maximize Efficient Information Storage and Utilization (효율적인 정보 저장과 활용을 극대화하기 위한 IoE 서비스 프로세스 연구)

  • Chang, Young-Hyun;Oh, Sang-Yeb;Ko, Chang-Bae
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.6
    • /
    • pp.31-35
    • /
    • 2015
  • The IoE service process for maximizing efficiency of information storage and utilization classifies in step five which are interconnected, data collection, storage, organize, analyze, and share. Two key processing elements are store and forward. Keeping the useful knowledge in safe location is "store processing", and utilization of stored useful knowledge is defined as "forward processing" during the IoE service process. Where, past experience data can tell us how to prepare the future utilization. That is, past experience is organized store processing, and preparation for the future is shared forward processing through analysis. To maximize the utilization and storage of information effectively, the various methodologies for IoE service process propose and research in this paper.