• 제목/요약/키워드: Ground Support Equipment

검색결과 76건 처리시간 0.035초

포병진지 구축을 위한 공병장비 최적배정 모형 (Optimum Allocation Model of Military Engineer Equipments for Artillery Position Development)

  • 장영초;이문걸
    • 경영과학
    • /
    • 제34권2호
    • /
    • pp.103-113
    • /
    • 2017
  • The artillery is a key element of the ground forces operation during wartime, and the military engineers support the artillery position development operation to support the smooth operation of the artillery. In establishing the artillery position development operation plan, the commander requires more than his intuition to find the best option reflecting a number of elements of the battlefield situation which changes every minute. Moreover, the number of available equipment is smaller than the number of required position developments, and the effective equipment operation becomes essential element of this issue. This study quantified the capability of the available engineering equipment, organized a number of teams enabling equipment to put out the maximum capacity based on the quantified figures, and formed the model which allocates the team to the developing points to minimize the developing time. The goal programming method was applied to resolve the problem. The developed model was applied to compare the total mission duration following the number of teams, the variable for commander's decision, and the result of this study can be used as the quantitative data for commander's decision making process in establishing the artillery position development support operation through effective equipment management.

위성 탑재체 고도화에 따른 위성 전력요구도 증가 및 전력요구도 증가에 따른 전력계 전기지상지원장비 설계 최적화를 위한 고찰 (A Study on the Optimization of the Design of Power Electric Ground Support Equipment according to the Increase in Power Demand due to the Increase in Satellite Power Demand and the Advancement of Satellite Payload)

  • 방수완;고형호
    • 항공우주시스템공학회지
    • /
    • 제17권1호
    • /
    • pp.88-96
    • /
    • 2023
  • 우리나라에서 개발 중인 저궤도 위성은 아리랑 위성으로, 이제까지 꾸준한 성능향상이 있었다. 이때 탑재체의 성능향상에 따른 탑재체의 전력요구도는 늘어나게 되었고 이에 위성 내부 전력 공급장치의 설계 및 Solar Array의 구성 등 위성 설계가 달라진다. 이에 따라 위성에 전력을 공급하며 위성 통합시험을 진행하는 전력계 전기지상지원장비 설계 시 전력 증가에 따라 많은 고려사항이 필요로 한다. 본 논문은 탑재체에 따른 위성 전력요구도의 변화 및 전력요구도 증가에 따른 전력계 전기지상지원장비 설계 시 고려할 사항에 대해서 다룬다.

지상 및 지하구조물 해체공사를 위한 구조 안전관리 방안 연구 (A Study on Structural Safety Management Plan for Above Ground and Underground Structure Dismantling work)

  • 심학보;전현수;석원균
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.194-195
    • /
    • 2021
  • Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.

  • PDF

천공장치를 이용한 배수설비 연결관 시공 기술에 관한 연구 (A Study for Drainage Pipe Construction Method using a Boring Machine)

  • 장재구;강선홍;김동은;정태호
    • 상하수도학회지
    • /
    • 제25권6호
    • /
    • pp.869-875
    • /
    • 2011
  • Ministry of Environment has been promoting BTL business of the sewer rehabilitation which continues from 2005 up to now. Sewer rehabilitation is classified into three parts : wastewater pipe rehabilitation, rainwater pipe rehabilitation and drainage equipment rehabilitation. Drainage equipment rehabilitation is that drainage pipe connects wastewater pipe directly without water-purifier. In the drainage equipment construction, it is inevitable to have the damage of ground structures(wall, gate and U drain, etc) when an open excavation method is used. Therefore it is necessary to develop non-excavation method to connect drainage pipe and wastewater pipe like jacking method to avoid the damage of ground structure. This paper has conducted an analysis of the non-excavation method using a boring machine attached to backhoe, which is issued the verification certificate of environmental technology according to the Development of and Support for Environmental Technology Act, article.7. The index set in this analysis was sectionalized to the condition of construction, the grade of drainage pipe, the size of excavated hole, the amount of waste cement concrete and asphalt concrete and the benefit effect compared to open excavation method.

보행 시 농작업 종사자들의 슬관절 퇴행성 등급에 따른 지면반력 특성 분석 (Analysis of the Characteristics of Ground Reaction Force According to the Level of Knee Osteoarthritis During Gait)

  • 이경일;이철갑;홍완기;김민
    • 한국운동역학회지
    • /
    • 제25권4호
    • /
    • pp.393-399
    • /
    • 2015
  • Objective : This study was conducted with an aim to use it as basic data for developing assistive devices, such as insoles that can suppress the progress of degenerative diseases and strategies, to improve early degenerative diseases by assessing walking characteristics of farm workers who were classified as KL-grade in the perspective of motor mechanics. Method : 38 male and female adults who complained of knee joint pain for more than six months were selected, and they were classified according to KL-grade. KL-grade was assessed by an orthopaedic specialist and an occupational environment health specialist. Filming equipment (FX-1, CASIO, Japan) and a ground reaction force system (AMTI OR6, AMTI, USA) were used to identify ground reaction force characteristics, and WOMAC was used for a pain rating scale. Results : There was a difference between the right and left side (axis-X) according to KL-grade, and when the grade was higher, the internal ground reaction force was also higher. Changes in COP were not affected by KL-grade of the knee joint, but it tended to increase as the grade increased. There were differences in the time required for limb support while walking according to the grades, and when the grade was higher, walking was more inefficient with long braking force and short propulsion forces. Also, pain rating scale, the right and left side, and COP changes while in support phase were related. Conclusion : There was a partial, statically significant difference in KL-grade and ground reaction force occurring during the support phase, and there were differences in ground reaction forces according to the grades of degenerative arthritis in the knee joint, indicating that this study is worthy as basic data for future studies.

태양광발전 계통연계 실증시험장 구축에 관한 연구 (The study on construction of the practical testing ground of grid-connected photovoltaic system)

  • 김의환;장주연
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.65.2-65.2
    • /
    • 2010
  • Currently the variety of governmental business support and research for supplying solar energy have been actively progressed. As of now, however, There are no practical testing infrastructures of grid-connected photovoltaic system which test performance of solar power facility in domestic. Therefore, in KEPRI, there is in progress construction of practical testing ground of 500 kW class grid-connected PV System for developing the evaluation of the performance technology including the Module, PCS, and etc, that is the important instrument of the PV System, in Gochang area. It analyzed the site creation work for constructing the practical testing ground and new construction of control room and the unit standards, specifications and capacity of required equipment. For the system detailed design, configuration, instrument-specific parameters established, power generation predictions of Array Type and the components of testing ground are needed to build.

  • PDF

KSLV-I 조립콤플렉스 시스템 설계 (KSLV-I Assembly Complex System Design)

  • 진승보;박정주
    • 시스템엔지니어링학술지
    • /
    • 제2권1호
    • /
    • pp.37-41
    • /
    • 2006
  • The KSLV-I satellite launch vehicle will be launched in a space center currently under construction. The Space Center which is an advance post base of space development of Korea is located on Oenaro island in Kohung, South Cholla Province. A Ground Complex of the Space Center consists of an AC(Assembly Complex), a LC(Launch Complex), and a MCC(Mission Control Center). Assembly and test facilities are located in the AC in which stage assembly, integrated assembly, check-up, certification test, and pre-launch test are made effectively. A launch pad, fuel supply facilities, a launch control center and associated supporting facilities are located in the LC, and the MCC has control over the space center. These ground complex facilities have diverse forms of an interface with mechanical device, electric device, and etc. These should also provide optimum condition and performance during launch operation processes of the launch vehicle. This paper introduces the result of R&D for the AC of the ground complex performed during system design period.

  • PDF

Life cycle cost analysis and smart operation mode of ground source heat pump system

  • Yoon, Seok;Lee, Seung-Rae
    • Smart Structures and Systems
    • /
    • 제16권4호
    • /
    • pp.743-758
    • /
    • 2015
  • This paper presents an advanced life cycle cost (LCC) analysis of a ground source heat pump (GSHP) system and suggests a smart operation mode with a thermal performance test (TPT) and an energy pile system constructed on the site of the Incheon International Airport (IIA). First, an economic analysis of the GSHP system was conducted for the second passenger terminal of the IIA considering actual influencing factors such as government support and the residual value of the equipment. The analysis results showed that the economic efficiency of the GSHP system could be increased owing to several influential factors. Second, a multiple regression analysis was conducted using different independent variables in order to analyze the influence indices with regard to the LCC results. Every independent index, in this case the initial construction cost, lifespan of the equipment, discount rate and the amount of price inflation can affect the LCC results. Third, a GSHP system using an energy pile was installed on the site of the construction laboratory institute of the IIA. TPTs of W-shape and spiral-coil-type GHEs were conducted in continuous and intermittent operation modes, respectively, prior to system operation of the energy pile. A cooling GSHP system in the energy pile was operated in both the continuous and intermittent modes, and the LCC was calculated. Furthermore, the smart operation mode and LCC were analyzed considering the application of a thermal storage tank.

고신뢰성 지상시험지원장비 조기 확보를 위한 시나리오 기반 위성 탑재체 패킷 분석방법 (Scenario Based Operating Satellite Payload Data Analysis Method to Secure Highly Reliable EGSE Early)

  • 이종태;이기준
    • 대한원격탐사학회지
    • /
    • 제33권5_1호
    • /
    • pp.521-535
    • /
    • 2017
  • 탑재체를 포함한 위성은 발사 이후 문제 발생시 조치할 수 있는 방법이 한정적이므로, 지상시험지원장비를 이용하여 그 기능을 충분히 검증하여야 한다. 또한 위성의 개발기간이 단축되고 있는 추세와 지상시험지원장비의 개발 완료시점이 전장품 엔지니어링 모델 개발완료보다 앞서야 한다는 점을 고려하면, 지상시험지원장비의 조기 확보는 위성 전체의 개발일정 준수를 위해서 반드시 필요하다고 할 수 있다. 본 논문에서는 지상시험지원장비의 일부인 탑재체 패킷 분석장치를 기능별 모듈화와 외부 파라메터화를 통해 시나리오 기반으로 동작할 수 있게 고안하여 고신뢰도의 지상시험지원장비 조기 확보방안을 제시하고, 구현한 장비를 실재 위성 개발사업에 적용한 결과를 보여준다.