• Title/Summary/Keyword: Expected Cost Per Unit Time

Search Result 89, Processing Time 0.022 seconds

Cost Analysis for Periodic Maintenance Policy with Minimal Repair (응급수리를 고려한 정기보전정책의 비용분석)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.34
    • /
    • pp.139-146
    • /
    • 1995
  • This study is concerned with cost analysis in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Minimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a spate until the periodic time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to maintenance period and scale parameter of failure distribution. Total cost factors ate included operating, fixed, minimal repair, periodic maintenance and replacement cost Numerical example is shown in which failure time of system has erlang distribution.

  • PDF

A Maintenance Design of Connected-(r,s)-out-of-(m,n):F System Using Genetic Algorithm (유전자 알고리듬을 이용한(m,n)중-연속(r,s):고장 격자 시스템의 정비 모형)

  • Yun, Won-Young;Kim, Gui-Rae;Jeong, Cheol-Hun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.3
    • /
    • pp.250-260
    • /
    • 2004
  • This study considers a linear connected-(r,s)-out-of-(m,n):F lattice system whose components are ordered like the elements of a linear (m,n )-matrix. We assume that all components are in the state 1 (operating) or 0 (failed) and identical and s-independent. The system fails whenever at least one connected (r,s)-submatrix of failed components occurs. The purpose of this paper is to present an optimization scheme that aims at minimizing the expected cost per unit time. To find the optimal threshold of maintenance intervention, we use a genetic algorithm for the cost optimization procedure. The expected cost per unit time is obtained by Monte Carlo simulation. The sensitivity analysis to the different cost parameters has also been made.

Cost Optimization of Ineffective Periodic Preventive Maintenance

  • Jung, Gi-Mun;Park, Dong-Ho;Yum, Joon-Keun
    • Communications for Statistical Applications and Methods
    • /
    • v.6 no.1
    • /
    • pp.99-106
    • /
    • 1999
  • This paper considers an imperfect repair model for which the repairable system is maintained preventively at periodic times and is replaced by a new system when a predetermined number of preventive maintenance has been applied. our main objective of this is to determine the optimal number of preventive maintenances before the system is replaced and the optimal length of interval between two consecutive preventive maintenances under a new repair model which is referred to as an ineffective preventive maintenance. Such a model assumes a periodic preventive maintenance in which the system is effectively maintained with a certain probability. Otherwise the system is not improved at all after each maintenance and thus the failure rate remains the same as before. The criteria to determine the optimal number of preventive maintenances and length of period is the expected cost rate per unit time for an infinite time span. We give the explicit expressions for the expected cost rate per unit time. Some numerical examples are presented for illustrative purposes.

  • PDF

Condition based age replacement policy of used item

  • Lim, J.H.;Lipi, T.F.;Zuo, M.J.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.2
    • /
    • pp.131-143
    • /
    • 2011
  • In most of literatures of age replacement policy, the authors consider the case that a new item starts operating at time zero and is to be replaced by new one at time T. It is, however, often to purchase used items because of the limited budget. In this paper, we consider age replacement policy of a used item whose age is $t_0$. The mathematical formulas of the expected cost rate per unit time are derived for both infinite-horizon case and finite-horizon case. For each case, we show that the optimal replacement age exists and is finite and investigate the effect of the age of the used item.

  • PDF

A Note on Age Replacement Policy of Used Item at Age $t_0$

  • Lim, J.H.
    • International Journal of Reliability and Applications
    • /
    • v.10 no.1
    • /
    • pp.33-42
    • /
    • 2009
  • In most of literatures of age replacement policy, the authors consider the case that a new item starts operating at time zero and is to be replaced by new one at time T. It is, however, often to purchase used items because of the limited budget. In this paper, we consider age replacement policy of a used item whose age is $t_0$. The mathematical formulas of the expected cost rate per unit time are derived for both infinite-horizon case and finite-horizon case. For each case, we show that the optimal replacement age exists and is finite and investigate the effect of the age of the used item.

  • PDF

Item Replacement Policy with Minimal Repair in Stepdown Warranty Model

  • Jae Joong, Kim;Won Joong, Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.33
    • /
    • pp.87-92
    • /
    • 1995
  • This paper proposes age replacement policy in stepdown warranty policy. The replacement policy is considered in case of minimally repairable items. And renewal theory is used in analyzing warranty costs. The expected cost per unit time is presented in stepdown warranty policy, free replacement, prorata and hybrid policy. In this article it is assumed that item is replaced at the age of T but the any failure is minimally repaired before the age T. At this point the expected cost per unit time is shown in customer's view point. And numerical example is explored in weibull time-to-failure distribution.

  • PDF

Replacement model under warranty with age-dependent minimal repair

  • Park, Minjae
    • International Journal of Reliability and Applications
    • /
    • v.18 no.1
    • /
    • pp.9-20
    • /
    • 2017
  • In this paper, we consider a renewable repair-replacement warranty strategy with age-dependent minimal repair service and propose an optimal maintenance model during post-warranty period. Such model implements the repair time limit under warranty and follows with a certain form of system maintenance strategy when the warranty expires. The expected cost rate is investigated per unit time during the life period of the system as for the standard for optimality. Based on the cost design defined for each failure of the system, the expected cost rate is derived during the life period of the system, considering that a renewable minimal repair-replacement warranty strategy with the repair time limit is provided to the customer under warranty. When the warranty is finished, the maintenance of the system is the customer's responsibility. The life period of the system is defined and the expected cost rate is developed from the viewpoint of the customer's perspective. We obtain the optimal maintenance strategy during the maintenance period by minimizing such a cost rate after a warranty expires. Numerical examples using field data are shown to exemplify the application of the methodologies proposed in this paper.

  • PDF

A Production and Preventive Maintenance Policy with Two Types of Failures (두 가지 고장형태를 고려한 생산 및 예방보전 정책)

  • 김호균;조형수
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.3
    • /
    • pp.53-65
    • /
    • 2002
  • This paper studies an economic manufacturing quantity (EMQ) model with two types of failures and planned preventive maintenance of the production facility. One is a type I (major) failure which should be corrected by a failure maintenance and the other is a type H (minor) failure which can be minimally repaired without interrupting the production run. The objective is to determine the lot size and preventive replacement policy minimizing the long-run expected cost per unit time. We consider a control policy with a constant production lot size and preventive maintenance after completing n production runs. It is assumed that both preventive and failure maintenance times are random and the demand arriving during a stock-out period is lost. An expression for the expected cost per unit time is obtained in the general case. A special case is discussed and numerical results are provided.

Optimal System Structure of Linear Consecutive-k-out-of-n:F System

  • Yun, Won-Young;Kim, Gue-Rae;Hisashi Yamamoto
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2004.07a
    • /
    • pp.201-206
    • /
    • 2004
  • The linear consecutive-k-out-of-n:F system consists of n components ordered linearly and fails if and only if at least k consecutive components fail. We assume that the failure times of components are independent and identical exponentially distributed. This paper develops a model to calculate the expected cost per unit time of a linear consecutive-k-out-of-n:F system. The optimization problem to find the system structure parameter k to minimize the expected cost per unit time is considered.

  • PDF

Periodic PM Policy for Repairable System with RCW or NCW

  • Jung, Gi-Mum;Kim, Dae-Kyung;Park, Dong-Ho
    • International Journal of Reliability and Applications
    • /
    • v.3 no.3
    • /
    • pp.113-124
    • /
    • 2002
  • This paper suggests the optimal periodic preventive maintenance policies after the combination warranty is expired. After the combination warranty is expired, a repairable system undergoes PM periodically and is minimally repaired at each failure. And also the system is replaced by a new system at the N th PM. In this case, we derive the mathematical formula for the expected cost rate per unit time. The optimal number and period for the periodic PM that minimize the expected cost rate per unit time are obtained. Some numerical examples are presented for illustrate purpose.

  • PDF