• Title/Summary/Keyword: Electrical Equipments

Search Result 862, Processing Time 0.029 seconds

A Study on the Standard Method to Calculate Recyclability Rate of Electrical and Electronic Equipments (전기전자제품의 재활용가능률 표준산정방법에 관한 연구)

  • Yi, Hwa-Cho;Kang, Hong-Yun;Shim, Kang-Sik;Kim, Jin-Han;Sim, Jae-Sul
    • Clean Technology
    • /
    • v.15 no.1
    • /
    • pp.23-30
    • /
    • 2009
  • European directive DIRECTIVE 2002/96/EC requires the minimum recycling & recovery rate on the waste electrical and electronic equipments (WEEE). But, they do not have guidelines on the calculation methods for recycling and recovery rate. A standard method to calculate recyclability and recoverability rate of products in the designing stage is necessary for the manufacturers so that they can reflect the calculated result to the improvement of product design. In this work, we investigated the existing calculation methods for the recycling and recovery rates of WEEE and the recyclability and recoverability rates of electrical and electronic equipments (EEE). A method for the calculation of recyclability and recoverability rates for the EEE products in the development stage was developed. The newly-developed calculation method was applied to some EEE products and the calculated results were evaluated.

The Construction of distribution test facilities of lightning protection equipment (배전급 내뢰설비 시설효과 분석 실증시험설비 구축에 관한 연구)

  • Kang, Moon-Ho
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.11a
    • /
    • pp.301-303
    • /
    • 2004
  • In distribution system about 5% of total outage is due to the lightning stroke. In order to reduce the rate of outage occurrence, distribution lightning protection equipments such as a secondary arrester, arching horn and various ground electrodes are developed and installed in the inside and outside of the county. Therefore it is needed to construct the test facilities to analyze the effect of these equipments. In this paper we describe the main content of the test facilities of lightning protection equipments. We have completed the field test of distribution lightning protection equipments for example lightning arrester, secondary arrester and arching horn etc.

  • PDF

Development of on-line system using electromagnetic wave for diagnosis of deteriorated power equipment in enclosed switchboard (전자파를 이용한 폐쇄배전반내 전력기기의 열화 온라인 진단시스템 개발)

  • Kang, C.W.;Choi, G.S.;Lee, Y.S.;Kang, D.S.;Kim, J.C.
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2001.05c
    • /
    • pp.178-181
    • /
    • 2001
  • This paper presents the development of electromagnetic wave detecting equipment for diagnosis of enclosed switchboard. High voltage power equipments are very important equipment of the key industries and the private enterprise. Power line accidents are national plans because of those set off casualties lose of power equipments and communication networks. Therefore the necessity of the development of detecting for power equipment diagnosis is demand for prevention of high voltage equipment accidents. This paper is the development of electromagnetic wave detecting equipment for diagnosis of high voltage equipment. This paper establishes the diagnosis method for high voltage power equipments, that secures original technique and possesses detecting technique for electromagnetic wave. By the study we developed electromagnetic wave detector, and we applied this equipment application tests at the place constructed high voltage equipments.

  • PDF

Outage Probability of the Device-to-Device Communication According to the Interference-to-Signal-Ratio Generated by Cellular Networks (셀룰러 시스템의 간섭에 의한 D2D 시스템의 Outage 확률 분석)

  • Min, Hyun-Kee;Seo, Woo-Hyun;Park, Sung-Soo;Hong, Dae-Sik
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.48 no.1
    • /
    • pp.55-61
    • /
    • 2011
  • In this paper, the outage probability of device-to-device (D2D) uplink communication underlaying cellular networks is analyzed over Rayleigh fading. We assume that a D2D pair and M cellular user equipments share the same frequency resources. To prevent any harmful interference from a D2D transmitter to the BS, the maximum transmit power of the D2D transmitter is strictly limited. Under these assumptions, the outage probability is represented as a function of the interference-to-signal ratio from M cellular user equipments to a D2D receiver and the number of cellular user equipments, M. In addition, the interference-to-signal ratio is represented as a function of distances among D2D equipments, cellular user equipments and the BS. Simulation results validate these analytical results.

Analysis of faust cause & insulation degradation on the electrical equipments for railway (철도용 전기기기의 고장요인 및 절연열화 분석)

  • 왕종배;전한준;박옥정;온정근
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2001.07a
    • /
    • pp.207-210
    • /
    • 2001
  • Electrical equipment for railway is always experiencing wear and degradation by mechanical, electrical and environmental stress in service and the fault or the accident of high voltage main circuit directly causes operation interruption. Particularly propulsion drive of high speed switching inverter takes the form of specific degradation mechanism such as fast rising transient surge, reflective overvoltage and harmonic stress, and it is known that it threatens the long life and the reliability of electrical equipment. In this paper, statistics of fault and accident on main electrical equipment for railway are presented and also insulation degradation mechanism, which governs end life of electrical device, is analyzed. Finally the method of fault respondence and reliability improvement on the main electrical equipments will be reviewed in order to prevent operation interruption.

  • PDF

A Study on the Test of Efficiency of the Diagnostic X-ray Equipment according to Their Rectifications (진단용 X선장치의 성능 실태 조사연구)

  • Seon, Jong-Ryul
    • Journal of radiological science and technology
    • /
    • v.20 no.2
    • /
    • pp.44-48
    • /
    • 1997
  • For the efficient management of the diagnostic x-ray equipment, a nation-wide inspection of hospitals was performed by an inspection institute in Taejon in the first half of 1997. Among those hospitals inspected, 28 equipments(machines) which were over 500 mA were randomly selected according to their characteristics : 7 condenser type x-ray equipments, 7 three control phase of full wave rectification of type remote control x-ray equipments, 7 single phase of full wave rectification type for general radiography equipments, and 7 single phase of full wave rectification type of R/F equipments. We obtained the following results by conducting the experiment based on the efficiency of the equipments mentioned above. 1) When the equipments are analyzed, 2 out of 7 single phase of full wave rectification type of general radiography equipments(28.6%), 3 out of 7 single phase of full wave rectification type of R/F equipments(42.9%), 5 out of 7 three phase of full wave rectification type remote of control x-ray equipments(71.4%), and 4 out of 7 condenser type of x-ray equipments(57.1%) showed suitability. It proves the superiority of the three phase of full wave rectification type of remote control x-ray equipments. 2) From the overall analysis, only about 50% of the equipments(suitability of 14 out of 28) maintain the efficient management. Therefore, maintenance management of equipments is more necessary. If the efficiency of the x-ray equipment is uniformly maintained and managed to prevent the breakdown(trouble) beforehand especially through the continuous inspection of tube voltage, tube current, exposure time, and collimator, the financial loss and exposure dose to the patient, as well as the workers engaged in radiation, can be reduced for better medical service.

  • PDF

Development of Single Phase Cabinet Panel with Electrical Safety Monitoring System by Mobile (모바일 이용 가능형 ESMS 기능의 단상 분전반 개발 연구)

  • Kim, Gi-Hyun;Lee, Sang-Ick;Shin, Seong-Su;Bae, Suk-Myong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.7
    • /
    • pp.92-96
    • /
    • 2011
  • In this paper, in order to reduce the electrical disaster such as electrical fire at traditional markets, we need to develop the ESMS(electrical safety monitoring system) which is able to monitor the power status of electrical equipments. Therefore, for solving the those problems, we developed the detection censor(ZCT, CT) and equipment of data analysis and transmission. The detection censor and equipment are able to monitor the electrical equipments condition(over current, leakage current, arc, etc.). We constructed Test-Bed for testing reliability of the ESMS and obtained certification. And we tested the over current, leakage current and arc under the normal condition.

Electrical Risk Factors affecting Human Body due to Underground Flooding (지하구내 침수 시 인체에 대한 전기적 위험요소 도출)

  • Jung, J.W.;Lim, Y.B.;Jung, J.S.;Ko, W.S.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11c
    • /
    • pp.56-59
    • /
    • 2005
  • In this paper, electrical risk factors due to the powered recovery equipments thrown to escape the dangerous condition that electrical apparatuses were submerged were derived and analyzed. After surveying several underground flooding sites, we could find out the status quo of the underground electrical equipments and what the most dangerous factors to a human body under water were. The results acquired from this study are applying to safely assessment algorithm.

  • PDF

Analysis of the Harmonic Resonance of Primary Restorative Transmission System Using PSCAD/EMTDC PART II (PSCADI/EMTDC를 이용한 시송전계통의 고조파 공진현상 분석 II)

  • Lee H. J.;Yoo W. K.;Lee K. S.;Park S. M.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.48-50
    • /
    • 2004
  • The energization of high voltage transmission lines and transformers, that is an inevitable process in most countries as the first restorative action for wide-area blackout, may induce overvoltages such as sustained overvoltage, transient overvoltage and harmonic resonant overvoltage. And these may cause damages to power system equipments or failure of surge arresters. The harmonic resonant overvoltage originates in switching operations and nonlinear characteristics of equipments. Actually it is difficult to predict the occurrence of harmonic overvoltage, since they result from nonlinear characteristics of transformers and other equipments. This paper describes the analysis of domestic primary restorative transmission system using PSCAD/EMTDC. The harmonic resonance is verified and the solution to prevent harmonic resonance is proposed in this paper. As a result, the PSCAD/EMTBC simulation showed slightly conflictive results that had been presented by IEEE Power System Restoration Working Group report.

  • PDF

A Study on the Evaluation of Reliability of the Vacuum Circuit Breaker for the Electrical Fire (전기화재에 따른 진공차단기의 건전성 평가)

  • Choi, Hong-Kyoo;Park, Joon-Yeol
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.7
    • /
    • pp.24-28
    • /
    • 2013
  • Fire-hited electrical equipment has possibility of deterioration. So its replacement is essential in terms of safety. However, the economic burden is increased. Therefore, the replacement or re-use of it is to be determined by tests. But the research of Integrity Assessment on Fire-hited electrical equipments is very rare. In this paper, we tested to determine the replacement or re-use of Fire-hited vacuum circuit breaker. And provided the data for the integrity assessment through the analysis of its deterioration.