Magazine of the Korean Society of Agricultural Engineers
/
v.11
no.4
/
pp.1803-1809
/
1969
The newly designed mole drainage plower which is attached to tractor is tested for work capacity comparing with the pulling by man animal and winch. Besides. the effect of desalinization by the mole drainage in reclaimed tideland was observed. The results as obtained in this experiment are as follows: 1. The mole drainage plower of tractor attachment has higher work capacity by 3 to 5 times than that of winch 2. The suitable soil moisture content to carry out the layout of mole drains is from 21 to 25 percent. 3. The new design mole drainage plower requires th lowest cost as comparing with the other methods. 4. Carrying out the mole drainage in reclaimed tideland it is effective in desalinization from 2 to 3 times than the only use of irrigation water. 5. The reasonable depth and interval of mole drains may be 60cm and 3m respectively. 6. The desalinization by the mole drainage increases the yield of rice from 40 to 45 percent in reclaimed tideland.
Proceedings of the Korea Concrete Institute Conference
/
1999.10a
/
pp.861-868
/
1999
Drainage concrete pavement, unlike water permeable concrete pavement, is to preclude the pavement from overflowing with water, such as rain water, from infiltrating into earth by placing a border in the middle layer which makes water to flow through the surface of the border to the conduit. Drainage concrete pavement enhances car wheel resistance to slippery and wet road surface and imbibes noise caused by friction on the road. Also, by using pigment, it adds to the beauty of the environment. Drainage concrete pavement can be used for sidewalks, roadways, parking lots and expressways.
Proceedings of the Korean Geotechical Society Conference
/
2001.10a
/
pp.329-336
/
2001
The numbers of geogrid-reinforced walls are widely used in Korea. This papers present the results of two failure case histories of geogrid-reinforced segmental retaining walls. The geological background of the construction sites, detailed construction sequences, and the amount of rainfall were examined. The failure of these reinforced walls are caused by the improper drainage system and foundation treatment, too sharpened curvature of corner work, and too high height of wall.
Proceedings of the Korean Geotechical Society Conference
/
1991.10a
/
pp.255-270
/
1991
In recent years. finite element methods have been used with increasing effectiveness in analysis of displacements and stresses within soil masses. However, one of the weakest links in the analytical representations used in these methods is the models of the material behaviour. Herein is discribed a modification to the finite element methods that allows solution problems with realistic stress-strain relation for soils. A finite element program for the precision prediction of the stress distribution within foundation has been developed using the elasto-plastic Work-Hardening model. The developed program is verified by comparing the results of this study with the tested results for Sacramento river sand. The main results obtained from the numerical examples are as follows: The vertical total stress increments are insensitive to drainage and constitutive equation of materials. The horizontal total stress increments are considerably affected by the drainage and constitutive equation of materials. The maximum shear stresses are affected by the drainage only in elasto-ptastic meterirals. The excess pore water pressures and the volumetric strains not only are considerably affected by the constitutive equation of materials. but also have almost similar distribution.
Journal of the Korean institute of surface engineering
/
v.36
no.1
/
pp.42-47
/
2003
Hot-dip galvanizing process is used widely in industry to achieve corrosion resistant coatings. Poor drainage during this process often leads to problems such as icicle formation and bridging In this work, mild steel specimens were hot-dip galvanized. Influence of the addition of bismuth, aluminum and both (bismuth and aluminum) to the zinc bath on the zinc drainage were determined. Bismuth additions improved the drainage significantly. Zinc bath containing 0.1 wt.% Bi and 0.025∼0.05 wt.% Al showed uniformity of coatings. Industrial trials with this bath composition showed reduction in zinc consumption, reduction of ash and dross, and good luster of workpiece.
Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.280-285
/
2005
At present, there are several problems related with sand mat which is used as a way to accelerate consolidation settlement, act like an underground drainage layer and increase trafficability simultaneously. First of all, the unbalance oft he demand and supply of sand is the one of the biggest problems, which makes not only price advance of sand but also delays a term of total construction work. Secondly, the damage of ecosystem and scenery is triggered by thoughtless sand dredging or mining. So, the need that the sand for sand mat should be replaced with a new environmental friendly material has been increased. Fiber mat may be one of the proper materials that suits the need. Therefore, we intended to compare the drainage properties of sand mat with those of fiber mat by experimental model tests. On the basis of the test results, fiber mat took shorter period of consolidation than sand mat and it's amount of settlement showed a little bit bigger than the other. In conclusion, the substitutability of fiber mat for sand mat could be placed highly in view of drainage efficiency. Furthermore, when Fiber mat is used, it has an advantage that spoil soil of the construction site or nearby site can be used for the purpose of increasing trafficability in addition to a role of drainage layer.
This paper presents the results of a scale model test to the effect of heat exchanger drainage method in retaining wall of weathered granite soil. Purpose to rise in the temperature of the heat wires inside the weathered granite soil is preventing the collapse of the retaining wall and drainage smoothly moved to the drainage layer. Especially using a spray gun to simulate the rainfall since the rainfall drainage work is important for the rainfall effect on soil, find the difference about displacement of the retaining wall, change of volume water content, drainage, earth pressure and change in the strain of the geosynthetic was effected to heat exchanger within the soil. The result from applying the heat exchanger method decreased the earth pressure and displacement of the wall and increased drainage of water.
There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as earth works, drainage works, pavement works, appurtenant works and etc based on accident examples and investigation on actual condition in roads construction work. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.
Hydraulic analysis in a dam that has a single outlet of water can be made through a simple comparison between the total precipitation and the volume of discharged water. In case of tailing dams this estimation could yield an error because several drainage facilities are worked independently as well as simultaneously. In this research, a capability of the drainage system in the tailing dam of the old Sangdong Mine was analysed by the means of GIS technic. As a result of this study, it was expected that in the normal working condition of the whole drainage system, the flooding of water over the dam should not occur in spite of the consecutive precipitation during one hour with an intensity of 80.31 mm/hr, a probable precipitation within 100 years. It was, however, revealed that, if the drainage system did not work completely, the water could flood over the dam when the total precipitation reached 251.1 mm.
Kwon, Oh-Hun;Park, Hyun-Sung;Lee, JinSoo;Ji, Won Hyun
Economic and Environmental Geology
/
v.53
no.6
/
pp.695-701
/
2020
This study aimed to monitor a pilot-scale vertical flow reactor (VFR) system being operated in long-term for water quality control of pH-neutral mine drainage containing Fe, Mn and As, discharged in D mine site. The treatment systems of VFR and zero manganese reactor (ZMR) consisted of sand/limestone, and steel slag/limestone, respectively. The systems were operated during about six months in order to evaluate their long-term treatment efficiency It was observed that both pH and alkalinity of mine drainage were remarkably increased and more than 98% of Fe, As and Mn ions was continuously removed during the tested period of time. In conclusion, the field results of this work demonstrated that the vertical flow reactor system can effectively treat mine drainage contaminated by Fe, As and Mn.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.