• 제목/요약/키워드: Construction phase

검색결과 1,697건 처리시간 0.025초

시공단계 환경부하 저감 가이드라인 구축을 위한 주요 구성항목 도출 (Deduction of Critical Components for establishing the Environmental Load Reduction Guideline in Construction Phase)

  • 김창원;김춘학;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.127-128
    • /
    • 2012
  • Recently, Construction industry has been trying to reduce environmental loads reflecting the global trend 'Green Growth'. Internal and External countries are provided 'green building certification', 'relevant law/regulations', 'guideline to life cycle', however, construction phase has been overlooked though environmental loads occurred intensively in this phase. Therefore, this study intend to deduct components reflected the guideline in construction phase and assess them quantitatively. The basis data is collected through survey targeting construction managers and related researchers and analyze these data using Analytic Hierarchy Process.

  • PDF

시공단계 환경관리를 위한 체크리스트 항목 도출 (Factor Deduction of the Checklist for Environmental Management in Construction Phase)

  • 김창원;이명도;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.139-141
    • /
    • 2013
  • Construction industry has been participated in the effort for the reduction of environmental pollution such as introduction of green building certification, enactment of environment related regulation. However these efforts are focused on the design and maintenance phases of entire life cycle, construction phase that can occur intensive environmental impact in a short period is insufficient. Therefore this study aim to derive environmental management factors in construction phase and assess them using reliability analysis and factor analysis. As a results, the 20 factors was classified into 4 superordinate such as 'plan and supervision', 'environmental factor management', 'licensing management', 'surrounding environment management'.Based on result of this study, further study should be developed the checklist for effective environmental management in construction phase.

  • PDF

시공단계에서의 BIM 도입 저해요인에 관한 기초연구 (A Study on Obstacle Reasons of BIM in Construction Phase)

  • 김지선;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.61-62
    • /
    • 2011
  • Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.

  • PDF

시공단계의 사고손실 비용 기반 건설안전 위험성 평가 방안 (Construction Safety Risk Assessment Method Based on Accident Loss Cost in the Construction Phase)

  • 이재현;정재욱;정재민
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.407-408
    • /
    • 2023
  • This article proposes a method to assess construction safety risk during the construction phase based on accident loss costs. Risk assessments for hazardous construction work are required by law, but they lack quantitative criteria. To address this, a survey estimated loss costs due to fatalities in the construction industry, finding labor loss cost and delay reimbursement cost to be the largest factors. The proposed method uses algorithm to calculate expected accidents and risk levels based on project characteristics, work methods, personnel, and environment data. This method is expected to enhance the reliability and usability of risk assessments during the construction phase of construction projects.

  • PDF

APPLYING LEAN CONSTRUCTION TO DESIGN PHASE

  • Joo-Hyun Park;Dae-young Kim;Hak-Ki Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1208-1211
    • /
    • 2005
  • The design phase has a great influence on the success of subsequent phases in the project which can be connected with the success of the overall project. Several studies have focused on the effective design management. However, it is too complicated and difficult to manage the design process for the reason that it has a lot of participants and design information and consists of thousands of decisions by an architect alone. Accordingly, it is the main issue for the success of the project how well the design phase be organized and managed. In recent, even in domestic, the importance of design phase has begun to be referred in the conferences. Lean Construction also has a close look at those issues and makes ready to apply specific management methods, called to Lean Design & Construction. Managers can consider a variety of uncertainties to be under control through making the overall process effectively from the early stage. By establishing the efficient process from the design phase before the construction phase, managers can result in a desirable productivity. The aim of this study is to bring the concept (Lean Design & Construction) in domestic design circumstances and verifies the possibility how to apply the concept to the design phase.

  • PDF

건설기획단계에서의 위험요인 도출 (An Extraction of the Risk Events in the Construction Planning Phase)

  • 권순오;김선규;이낙운
    • 산업기술연구
    • /
    • 제25권B호
    • /
    • pp.99-106
    • /
    • 2005
  • The planning phase of construction project success or failure of the enterprise decision the 1st dangerous duration which occurs very there is a possibility of making with the phase which is important, of construction project in life cycle most many risk. But the risk management from planning phase well does not become accomplished is the actual condition from existing construction project. Consequently, it classifies the risk event from project initial planning phase of construction project from this study which probably is substantial risk event the possibility of accomplishing from a planning phase successfully in order to be.

  • PDF

Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF

시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구 (A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction)

  • 조기연;박미연;김성훈;서종원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF

Establishment of Change Order Database for Reducing Change Order in Construction Phase

  • Shin, Hyun-Kyung;Cha, Yongwon;Han, Sangwon;Hyun, Chang-Taek
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.622-624
    • /
    • 2015
  • As uncertain factors are latent in a construction project by nature, a change order occurs frequently. The occurrence of change orders in construction projects conducted during construction phase is known to cause unexpected negative impacts such as cost overrun, schedule delay, quality problem, and claims in the post-process. Thus, an efficient management method is necessary to prevent and minimize change orders during construction phase when they occur frequently. This paper analyzed the causes of change orders and the impact factors that occur during the construction phase of a construction project and suggested a direction for change order database building.

  • PDF

공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 - (An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014)

  • 정우영;이태원;이풍욱;이강
    • 한국건설관리학회논문집
    • /
    • 제16권4호
    • /
    • pp.89-97
    • /
    • 2015
  • 실시설계도서의 품질은 시공, 그리고 운영 및 관리단계에도 큰 영향을 미친다. 그리고 적절한 실시설계기간의 확보는 실시설계도서의 품질을 위해 중요한 요소이다. 따라서 이 연구는 2009년부터 2014년까지 조달청 맞춤형 서비스를 통해 발주된 총 42개의 건설프로젝트의 실시설계단계의 기간을 분석하였다. 분석에 의하면, 실제 실시설계기간은 계획 실시설계기간보다 1.33배에서 1.79배가 소요되었다. 계획 실시설계기간은 건설교통부 제2000-235호에서 고시하고 있는 방식대로 공사금액에 의해 산정하고 있었지만, 실제 실시설계기간은 공사금액과 아주 낮은 상관관계를 보였다. 이 결과를 토대로 실무자들과 인터뷰를 진행하였고, 공사금액이 실시설계기간과 낮은 상관관계를 보인 것은 이들에게 아주 잘 알려진 사실이었다. 그들은 공사의 복잡도, 설계변경의 정도, 그리고 발주처의 성향에 따라서 실시설계기간이 크게 좌우된다는 점을 언급하였다. 따라서, 실시설계도서의 품질을 향상시키기 위해서는 다양한 요소들을 실시설계기간 산정에 적용하여 적절한 기간을 산정해야하며, 고품질의 실시설계도서는 건설산업에 긍정적 효과를 불러일으킬 것으로 보인다.