Study on Development and Application of CWS(Continuous Wall System) II Method (CWS(Continuous Wall System) II 공법의 개발 및 적응에 관한 연구)

  • Lim, In-Sig;Lee, Jeong-Bae;Choi, Sun-Young;Lee, Jai-Ho;Woo, Sung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.57-64
    • /
    • 2009
  • CWS I method developed to overcome the problems of frequent occurrence in the application of existing downward construction methods has demonstrated excellent efficiency. However, in the case of using slurry wall instead of SCW or CIP as a retaining wall, the improvements in connecting steel beams with the wall were demanded. Therefore, the study of CWS II method was carried out in order to accomplish the CWS I method reflecting its strong points and to ensure the settlement of a steel beam and to induce the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. In this paper, the concept and features of CWS II method as well as the progress of execution was discussed by comparing with existing methods.

Analgesis of Clearly Reinforced Soil Wall Behavior by Model Test (모형시험에 의한 점성토 보강토벽의 거동분석)

  • 이용안;이재열;김유성
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.11c
    • /
    • pp.85-94
    • /
    • 1999
  • Reinforced Soil Wall has several merits comparing with conventional retaining wall. The conventional method has the limit of wall height, ununiform settlement of the foundation ground, quality assurance of the embankment body, shortening of construction period, economical construction and so on. Basis of previous mentioned things reinforced soil wall is the substitutional method of conventional retaining wall and its necessity is continuously increasing. The embanking material used in reinforced soil wall is generally limited such as a good quality sandy soil, and in many case constructors have to transfer such a good embanking material from far away to construction site. As a result, they would pressed by time and economy. If poor soils could be used embanking material, for example, clayey soil produced in-situ by cutting and excavation, the economical merit of reinforced soil wall would be increased more and more. Likewise, a lot of study about laboratory experimental behavior of reinforced soil wall using a good quality soil is being performed, but is rare study about clayey soil containing much volume of fine particle relatively in korea. In this study, the authors investigated behavior of the geosynthetic reinforced and unreinforced soil walls using clayey soil as embanking material in view of horizontal movement of walls, bearing capacity and reinforcement stress.

  • PDF

Construction of Super-block Unit Curtain Wall for High-rise Buildings Utilizing a Specialized Installing Equipment (전용 양중틀을 활용한 초고층 건물의 슈퍼블럭 유닛 커튼월 시공)

  • Chung, Sam-Yong;Lee, Sang-Heon;Ohk, Young-Mu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.174-181
    • /
    • 2004
  • We will introduce a method of construction of super-block curtain wall applied to Tower Palace III which is the highest high-rise complex building in Korea. Up-up method is utilized on Tower Palace III to shorten the term of works and it is that the curtain walls for the belt wall part are installed after the rests. The belt wall structure increases the horizontal structural stiffness of the building. The method of construction of super-block curtain wall is developed and used to raise and install the curtain wails of the belt wall floor. It is that the large block of curtain walls corresponding to three stories is fabricated on the ground in advance and the block is installed at a time by a tower crane. Specialized installing equipment :,s newly developed and applied to install the super-block. curtain wail. The curtain wall of the upper floor of the belt wall part is installed after the super-block. The installing equipment for this floor is developed utilizing a mini excavator and vacuum suctions. The application of this method had made it possible to omit the setting up the scaffold and financial profits such as the shortening of the terms of works was realized. The safety of works was secured and the productivity was also improved.

  • PDF

Several Issues Closely Related to Construction in the Structural Design of Wuhan Center

  • Jian, Zhou
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.189-196
    • /
    • 2022
  • The practical difficulties of construction will impose many restrictions on the structural design, and the construction method can also provide unexpected ideas for solving design problems. Through the discussion of three issues closely related to construction in the structural design of Wuhan Center, this paper illustrates the importance of in-depth consideration of the construction situations in the structural design stage. The topics of "Connection between Embedded Steel Plates in Steel Plate Composite Shear Wall" and "Connection Joint between Outrigger Truss and Core Wall" are about how to facilitate on-site construction by simplifying and optimizing detail design. The topic of "Adjusting Internal Force Distribution by Optimizing Construction Sequence" is about how to make the construction process a tool for structural design.

Field Application of Up-Up Construction Using Buried Wale Continuous Walt System Method (CWS공법(Buried Wale Continuous Wall System)을 적용한 Up-Up 시공사례)

  • Lee Jeong-Bae;Lim In-Sig;Kim Dong-Hyun;Oh Bo-Hwan;Ha In-Ho;Rhim Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.1-4
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved duality and reduction of construction period can be obtained from CWS method.

  • PDF

Measurements of Earth Retaining Wall using Coordinate Sensor System (좌표측정 센서시스템을 이용한 흙막이 변위 계측)

  • Noh, Tae-Sung;Rhim, Hong-Chul;Han, Byung-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.196-197
    • /
    • 2015
  • Measurements of temporary earth retaining wall during construction are essential for the safety and control of building under construction. As there is a rapid development in sensor technologies, new system of coordinate sensor is developed and applied to a construction site. The new system is capable of measuring three dimensional coordinates continuously over time. It makes possible to monitor the behavior of the temporary earth retaining wall real-time. In this paper, the results of such measurements are provided with real data.

  • PDF

The Construction Method which attached Complex Stone Panel to Concrete Wall using High-Frequency Holt-Melt Machine (고주파 접착기를 사용한 복합석재판의 콘크리트 벽체 부착 시공)

  • Oh, Chang-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.45-49
    • /
    • 2010
  • The contamination(stain phenomenon) of natural marble(sipeol, bianko) of art wall of on-site interior finishing system and wall of elevator hall has occurred. The bottom of the art wall of stone junction tile has defects as cracks. To solve these problems, our research team developed eco-friendly complex stone panel(stone 4T + cement board 6T) and high-frequency hot-melt construction method that can construct in winter.

  • PDF

Analysis of the Weight for the Required Performance Items of Lightweight Wall through the Test-bed and AHP Method (테스트베드 구축과 AHP기법을 통한 경량벽체 요구성능의 중요도 분석)

  • Lee, Hak-Ju
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.105-106
    • /
    • 2015
  • As the Long-life certification system is recently introduced in the Housing Law in Korea, it is expected that an application of the lightweight wall panel will be increased in apartment construction as the main wall system. However, the performance criteria for lightweight wall is in the early phase of its action. Therefore, it is necessary to establish the performance criteria properly by investigating performance requirement in the user's perspective. The purpose of this study is to identify of the weight of the required performance items for the lightweight wall in apartment house. To analyze the priority in the performance, an interview survey is performed; after monitering the test-bed of the lightweight walls, user and experts evaluate the performance requirements. The weight of the performance requirement is developed by AHP method.

  • PDF

Unit Module Construction Method for Freeform Facade (비정형 파사드의 유닛 모듈 시공 공법 개발)

  • Kim, Sung-Jin;Park, Sung-Jin;Park, Young-Mi;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.220-221
    • /
    • 2013
  • Exterior walls are designed and constructed through design focused exterior wall system. Nowadays, freeform facade design has been changing according to material, form and function of the exterior wall system. Especially, curtain wall facade system is designed and manufactured using solar shading faces. However, the traditional method have a lot of difficulties in the currently performing technology for curtain wall facade. It is important to make the freeform facade components that integrated as a surface of freeform buildings. Therefore it is necessary to develop unit module construction method for freeform facade.

  • PDF