• 제목/요약/키워드: Construction level

Search Result 4,375, Processing Time 0.028 seconds

A Study on the Properties of Quality of Concrete Using Mixed Sand Improved Grading (개량입도 혼합모래를 사용한 콘크리트의 품질특성에 관한 연구)

  • Kim Ki-Hoon;Han Min-Cheoi;Park Koo-Byung;Yoon Gi-Won;Han Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.55-58
    • /
    • 2004
  • This paper investigated the results of quality of concrete using mixed sand with grading adjustment in order to find out the applicability of fine aggregate with bad grading, According to test results, fluidity of concrete with fine level grading river sand was decreased while with coarse level grading crushed sand increased compared with that with medium level grading crushed sand. Use of mixed sand with grading adjustment(MSG) resulted in an improvement in fluidity. Increase in fineness modulus led to an increase in bleeding, For compressive strength, use of MSG increased compressive strength. For drying shrinkage, use of fine level grading river sand resulted in an increasing drying shrinkage due to the larger presence of fine particles, while use of MSG led to a reduction in drying shrinkage

  • PDF

The construction of a PLC simulator for level control (유량 제어을 위한 PLC 시뮬레이터 구성)

  • Lee, Gi-Bum;Yoon, Woo-Sik;Jeong, Hee-Don;Lee, Jin-S.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.2605-2607
    • /
    • 2000
  • This paper represents the construction of a PLC simulator for the level control of water and the speed control of the water cask. The level and speed processes are automatically operated by the PLC. The simulator system consists of PLC, program loader and control penal. The digital input and output units make the valves of the water cask the On or Off state. The analog input and output units control the level of water and the speed of the water cask. A LD program is used in the control language of PLC.

  • PDF

A Basic Study on the Evaluation Factor for Deteriorated Level of Rural House (농촌주택의 노후도 평가요소 도출을 위한 기초연구)

  • Park, Gil-Beom;Park, Jun-Mo;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.107-108
    • /
    • 2014
  • The rural area has aged and depressed for urban area in Korea. Furthermore, the rural house has deteriorated and is vulnerable to disaster which collapse, fire, landslide, and so on. For this matter, it need to an evaluated system for deteriorated level of rural house. The evaluated system has a repairing method and an estimated cost for rural house to offer native in rural area. This study could draw evaluation factor for deteriorated level of rural house as a basic study for the evaluated system. The evaluation factors is compared the Korean housing performance grade indication system, the Korean green building certification criteria, and the Japanese housing performance indication system. As a result, they could eight types. There are a mothproof, an waterproof, a finishing material, an asbestos cement slate of roofing, a mobility right, an opening and closing of doors and windows, an indoor environment.

  • PDF

Upward Influence to Overcome Hierarchical Authority Expectations: A New Approach for Stakeholder Management

  • Fan, Yang;Anantatmula, Vittal
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.28-35
    • /
    • 2012
  • Critical to project success is effective stakeholder management. This paper presents a challenge for the project manager who uses traditional approaches to manage mid-level stakeholders in an organization. Dual roles of a mid-level stakeholder (as a stakeholder of a project and as an agent of the corporate) may cause problems that would result in difficulties for project managers in identifying the stakeholder's attributes and overcoming hierarchical authority expectation. However, the dual roles of the stakeholder result in its weakness in the project-stakeholder relationship. Can a project leverage its strategic role for effective upward influence by linking project objectives to corporate strategic objectives? To address this research question, case study method was used to gain a deeper understanding of mid-level stakeholder's salience. This research proposes an upward influence strategy to embed a project-stakeholder relationship in a hierarchical stakeholder network.

Tidal Changes in the Harbor due to the Development of Mokpo Coastal Zone (목포해역 개발에 따른 항내 조석변화)

  • Jeong, M.S.;Jeong, D.D.;Shin, S.H.;Lee, J.W.
    • Journal of Korean Port Research
    • /
    • v.11 no.1
    • /
    • pp.113-120
    • /
    • 1997
  • Tidal changes in Mokpo harbor and its adjacent coastal waters caused by the coastal development including the construction of the Youngsan, Youngam, and Gumho Estuary Barrages had been predicted previously. Since then, the construction work for these estuary barrages had been completed and it was available to get water level variations from the continuous measurement at the Mokpo tidal station. This study deals with the analysis of water level variation from the observed data by the harmonic analysis and mathematical treatment. Some comparisons between the observed water level changes and the predicted by the numerical model are made, which was not supported before. The result shows that the trend of the water level changes are following well the previously predicted variations.

  • PDF

On the Standardization of Management System for Improving Reliability in Construction Industry (건설 분야 신뢰성 향상을 위한 경영표준 운영 방안)

  • Kim Jong-Gurl;Park Yong-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.253-258
    • /
    • 2004
  • Domestic construction industry (including plant engineering industry) faces severe competition with world-wide leading companies under WTO (World Trade Organization) system. To survive in this competition, domestic construction company should establish and operate standardization system efficiently. In this paper, check list is presented to prepare the efficient reliability management system in domestic construction. And then, the check list is applied in MIR(Maturity Index on Reliability) estimation item to estimate reliability management level of company quantitatively.

  • PDF

Centrifuge Model Experiments on Behavior of Waterproof Dike in Progress of Construction (원심모형실험을 이용한 방수제 안정성 검토)

  • Yoo, Nam-Jae;Kim, Dong-Gun;Lee, Dong-Won
    • Journal of Industrial Technology
    • /
    • v.31 no.A
    • /
    • pp.79-86
    • /
    • 2011
  • This paper is results of centrifuge model experiment of investigating geotechnical engineering behavior of waterproof dike, located in soft grounds, in Saemankem in progress of construction. Centrifuge test with artificially increased gravitational level of 50g were performed to find ground settlements and excess pore-pressures developed during construction of waterproof dike by simulating the construction stages being predicted to occur in field so that the stability of waterproof dike could be assessed.

  • PDF

Outline of Standard Classifications for International Power Plant Construction (해외 발전소 건설의 효율화를 위한 표준분류체계 상위구조)

  • Kang, Mi-Yeon;Ha, Jiwon;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.184-185
    • /
    • 2014
  • International construction contracts to Korean construction companies have been dramatically increased over the 48 years (Contract received worth 65.2 billion dollars in 2013). Especially, the plant construction sector has achieved about 61% among the 65.2 billion dollars. Under this trend, in order to ensure plant construction's competitiveness, 'standard classification' is an important area for systematic management. However, these standards in the plant construction are not widely utilized yet, in comparison with civil and building sectors. Therefore, in this research, a higher level of standard classifications is proposed for various types of power plants from a PMO's (Project Management Office) perspective. This study also provides a comparative analysis outlining different features and common components based on various types of power plants.

  • PDF

Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns (시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발)

  • Kim, Seung-Weon;Jung, Hee-Weon;Park, Dae-Yung;Kim, Dong-Gun;Park, Joo-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.