Proceedings of the Korean Institute of Building Construction Conference
/
2001.11a
/
pp.93-98
/
2001
If the construction delays are occurred during the project execution, the contractual parties should inquire the delay causes and the contractual obligation. Due to the compensation of damages, the interested parties and the contractual parties are placed on the adverse situation. For reasonable of the claim and dispute, the contractual parties are needed the objective and systematic procedure method to analyze the delay. The purpose of this study is to propose a formal process model considering the case of construction delay-claims.
Song, Bohyeon;Jeong, Seunghwan;Lee, Jin Gang;Choi, Jaehyun
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.161-162
/
2023
The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.
Kim, Ji-Sun;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
Proceedings of the Korean Institute of Building Construction Conference
/
2011.11a
/
pp.61-62
/
2011
Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.
Journal of Construction Engineering and Project Management
/
v.1
no.1
/
pp.31-36
/
2011
Construction materials usually constitute a major portion of the total cost in a building construction project. Materials management Is made problematic by materials shortages, delays in supply, price fluctuations, damage and wastage, and lack of storage space. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the case studies reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia Is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.
Kim, Chang-Won;Kim, Baek-Joong;Cho, Hunhee;Kang, Kyung-In
Proceedings of the Korean Institute of Building Construction Conference
/
2011.11a
/
pp.131-132
/
2011
Non-working days owing to climatic factors have been negatively affected in productivity of construction, such as delays of project completion times, decrease productivity of construction. Especially non-working days of steel erection work is about 58 days, it is influenced deleteriously to estimating uncertain construction duration. To solve this problem, Construction Factory(CF) and sliding roof system installed CF's upper side are developed in korea recently. This study is proposed the design of sliding roof system through assess relation of requirements and technical characteristics using Quality Function Deployment(QFD). The basis data for applying QFD is collected from literature reviews and questionnaires/interviews targeting system developer, experts and researchers.
International conference on construction engineering and project management
/
2009.05a
/
pp.821-826
/
2009
Current construction simulation approaches mostly focus on operation aspects of construction projects, ignoring managerial aspects which can radically change operational profiles (e.g., number of resources, expected productivity level, or daily working hours) during the course of construction. As a result, these approaches may mislead construction managers into unrealistic execution plans as well as make them difficult to find potential performance improvement areas. As an effort to address this issue, this paper establishes a comprehensive construction modeling framework which integrates operational and managerial aspects of construction projects. The proposed modeling framework will provide construction managers with more accurate, more reliable, and more realistic simulation results thus reducing the likelihoods of schedule delays and cost overruns.
Proceedings of the Korean Institute of Building Construction Conference
/
2012.05a
/
pp.191-192
/
2012
The BIM(Building Information Modeling) introduction of the construction and maintenance at the design phase through the life cycle of the building until it is destroyed, I will bring big changes in the process. If you are building a small action by a variety of variables difficult to manage on-site construction, but, BIM remodeling of the building by applying a small improvement in the quality of imported building and construction delays, such as design changes or re-construction by removing the elements of economic 04 to make. Since the early stages of applying BIM to complement the introduction part, but the future seems to lead to changes in the built environment, academics and practitioners of the construction industry seem to have an active research.
Nirmal Kumar Acharya;Young Dai Lee;Soo Yong Kim;Yong Duek Kim
International conference on construction engineering and project management
/
2005.10a
/
pp.709-713
/
2005
The conflict problems encountered in the construction projects led to prolonged delays in implementation, interruptions and sometimes suspension. This paper has described ten fundamental management principles to avoid conflicts in construction field and increase the productivity. They are: i) hire good (not cheap) construction professionals ii) set reasonable time and cost goals iii) recognize contractors and designers are in business to make profit iv) draft a clear contract document v) pick a suitable project delivery system vi) implement a front-end approach vii) accept construction project as a dynamic process viii) need of education and training of professionals ix) accountability and teamwork in construction site, and x) avoid negligence.
Proceedings of the Korean Institute of Building Construction Conference
/
2012.11a
/
pp.193-194
/
2012
Construction work is affected by the weather; e.g. snowfall, rainfall and low-high ambient temperature, especially at a site in a severe climate. The influence of the weather is one of the possible reasons for delays in a construction schedule and quality deterioration. To protect the worksite from severe weather conditions, the temporary roof and wall could be installed on the outside of main structures designed in advance and the temporary structures could be took down after a period use. The greater coverage all-weather construction method is applied, the larger the effect. so, it is important and needs that the temporary roof and wall can be widely applied, designed to effectively about structure and layout.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.5D
/
pp.839-848
/
2006
Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.