• Title/Summary/Keyword: Construction Type Code

Search Result 113, Processing Time 0.031 seconds

CONSTRUCTION OF SELF-DUAL CODES OVER F2 + uF2

  • Han, Sung-Hyu;Lee, Hei-Sook;Lee, Yoon-Jin
    • Bulletin of the Korean Mathematical Society
    • /
    • v.49 no.1
    • /
    • pp.135-143
    • /
    • 2012
  • We present two kinds of construction methods for self-dual codes over $\mathbb{F}_2+u\mathbb{F}_2$. Specially, the second construction (respectively, the first one) preserves the types of codes, that is, the constructed codes from Type II (respectively, Type IV) is also Type II (respectively, Type IV). Every Type II (respectively, Type IV) code over $\mathbb{F}_2+u\mathbb{F}_2$ of free rank larger than three (respectively, one) can be obtained via the second construction (respectively, the first one). Using these constructions, we update the information on self-dual codes over $\mathbb{F}_2+u\mathbb{F}_2$ of length 9 and 10, in terms of the highest minimum (Hamming, Lee, or Euclidean) weight and the number of inequivalent codes with the highest minimum weight.

AN ALTERED GROUP RING CONSTRUCTION OF THE [24, 12, 8] AND [48, 24, 12] TYPE II LINEAR BLOCK CODE

  • Shefali Gupta;Dinesh Udar
    • Bulletin of the Korean Mathematical Society
    • /
    • v.60 no.3
    • /
    • pp.829-844
    • /
    • 2023
  • In this paper, we present a new construction for self-dual codes that uses the concept of double bordered construction, group rings, and reverse circulant matrices. Using groups of orders 2, 3, 4, and 5, and by applying the construction over the binary field and the ring F2 + uF2, we obtain extremal binary self-dual codes of various lengths: 12, 16, 20, 24, 32, 40, and 48. In particular, we show the significance of this new construction by constructing the unique Extended Binary Golay Code [24, 12, 8] and the unique Extended Quadratic Residue [48, 24, 12] Type II linear block code. Moreover, we strengthen the existing relationship between units and non-units with the self-dual codes presented in [10] by limiting the conditions given in the corollary. Additionally, we establish a relationship between idempotent and self-dual codes, which is done for the first time in the literature.

CONSTRUCTION FOR SELF-ORTHOGONAL CODES OVER A CERTAIN NON-CHAIN FROBENIUS RING

  • Kim, Boran
    • Journal of the Korean Mathematical Society
    • /
    • v.59 no.1
    • /
    • pp.193-204
    • /
    • 2022
  • We present construction methods for free self-orthogonal (self-dual or Type II) codes over ℤ4[v]/〈v2 + 2v〉 which is one of the finite commutative local non-chain Frobenius rings of order 16. By considering their Gray images on ℤ4, we give a construct method for a code over ℤ4. We have some new and optimal codes over ℤ4 with respect to the minimum Lee weight or minimum Euclidean weight.

A Study on the system Applied Air-Vent to Complex Lay Poly-Urethane Waterproofing Material and Air-Permeability Buffer Sheet of Disconnection Type (Web기반을 활용한 자재 조달 시스템 개선방안)

  • Lee, Im-Bae;Kim, Hong-Hyun;Yoon, Su-Won;Min, Kyung-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.141-145
    • /
    • 2008
  • Because of world financial crisis, The Korea domestic construction industry has been damaged hugely on material supplying work. A current domestic material supply system can't react properly on a great rise of foreign exchange rate and raw material price, so the system has a problem which is not properly supplying material. To solve this problem, a more innovative material supply work system is seriously needed than ever. So this study wants to improve material supply system for supplying material right time, right place through applying a web-based system. Applying this, overall process of material-supply-work can be done on a web-based system for immediately understanding change of ordering and warehousing by material-supply-schedule to a domestic construction field.

  • PDF

Development of Programs for Menu Planning by Using Personal Computer (PERSONAL COMPUTER를 이용한 식단 관리의 전산화 연구)

  • 문수재
    • Journal of the Korean Home Economics Association
    • /
    • v.24 no.4
    • /
    • pp.69-74
    • /
    • 1986
  • The present study investigated the use of a computerized program for construction of menu. The Computer used for this study was the personal computer type IBM-PC OA-16 XT. The program itself used the computer's“DBASE Ⅲ”. Preparation for computer programming: 1) Assigned special code number of menu and input data 2) Assigned special code number of recipe and input data 3) Menu construction The computerized program for the planning of menu according to user's condition was developed.

  • PDF

Class Code Generation method for Component model Construction (컴포넌트 모델구축을 위한 클래스 코드 자동생성 방법)

  • Lim, Keun;Lee, Ki-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.13 no.5
    • /
    • pp.69-76
    • /
    • 2008
  • In this thesis, we implemented the prototype system for the class code generator based on consistent code generation process and standard type, the class to be component unit. Particularly, we proposed relationship rule to solve the difficult problem by the object-oriented language to association and aggregation between classes based on component, through this method we can make to consistent code generation standard. Also it is adopted to component model construction which is generated code using code generation, and it can be basic assembly and deployment of business components to reusable target in developing application system.

  • PDF

A Study on the Risk Index Model of Work Type in Architectural Construction Work (건축공사 공종별 위험지수 산정모델에 관한 연구)

  • Chang, Seong-Rok;Go, Seong-Seok;Lee, Jong-Bin
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.6
    • /
    • pp.63-68
    • /
    • 2007
  • The purpose of this study is to verify the relation between the risk index using AHP(Analytic Hierarchy Process) and the risk index using Computing Model. For doing the objective, this research classified 22 work types in architectural construction work from the analysis Korean architectural standard specification and Korea occupational safety & health agency code. Based on the classified 22 work types in architectural construction work, the risk index of each work type was calculated by AHP and Computing Model. For verifying the correlation of risk index between AHP and Computing Model methods, SAS version 8.0 System, which is one of the statistics programs, was used.

Comparison of Girder Height by Span in Various Types of Railway Bridge (철도교량형식의 경간에 따른 형고 비교)

  • Lee, Tae-Gyu;Kim, Hye-Uk
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.262-267
    • /
    • 2008
  • The type used mainly in present our country in the superstructure of the railway bridge including the high speed railway is classified by the box girder and the I-type girder, greatly. The box girder is mainly used by the high speed railway bridge, and the I-type girder is used mostly by general railway bridge style. In this study, according to current railway bridge design code, we execute design by the span length of each considered bridge form. Also we analyze the suitable girder height by the span length and calculate the construction costs. The comparative analysis of the structural efficiency is produced by the span length. From this study, it is exposed that the girder height by the span length is the biggest in box girder. Also it is evaluated that the construction costs of the box girder is higher than that of the I-type girder although there is a difference between more or less according to adopted construction method.

  • PDF

Proposal of Localization Policy Based on the Status of Chinese's Research Facilities and Equipment Construction in Korean Basic and Analytical Science Field (국내 기초·분석과학 분야 내 중국산 연구시설·장비 구축 현황에 따른 국산화 정책 제언)

  • Kim, Chang-Yong;Chung, Taewon;Kong, Jaehyun;Park, Chan-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.6
    • /
    • pp.460-471
    • /
    • 2019
  • The aim of this study was to examine the scale and market share of Chinese's research facility & equipment in the domestic research equipment market of basic and analytical science field for analyzing the difference of the number and amount of construction by year of acquisition, national research facility equipment standard classification code, and type of institution based on the information of the research equipment invested by the Korean government for the past 14 years. In addition, we analyzed the correlation among the year of acquisition, equipment standard classification code, and type of institution variables. As of January 1 2019, from 2005 to 2018, 50 Chinese's research facilities & equipments (main equipment with a construction cost of 30 million won or more) built in the basic and analytical science fields were selected for this study and their number of construction, amount of construction, year of acquisition, type of institution, and standard classification code were analyzed. Differences of the number and amount of construction with-in and by year of acquisition, standard classification code, and type of institution were tested using a single sample Chi-square test, Mann-Whitney U test, and Kruskal-wallis test. The correlation among the three variables was analyzed by using the Chi-square test of cross-tabulation analysis. And there was a statistically significant correlation among the year of acquisition, standard classification code, and type of institution (p<.05). Compared to the 2000s, in the 2010s, high-priced Optical Electronics/Video Equipment was installed at private universities, private enterprises, and government-affiliated research institute. Therefore, the domestic construction status of Chinese's research facility & equipment in the basic science and analytical science field is less than that of the domestic ones, but the number and the amount of construction are increasing statistically. So it is necessary for the government to be able to recognize the possibility that the Chinese's research facility and equipment can encroach on the domestic research industry market and to prepare related provision.

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.