• Title/Summary/Keyword: Construction Technique

Search Result 2,492, Processing Time 0.03 seconds

Basic study for development of bottom-up infill module for high rise building (고층 건축물을 위한 bottom-up Infill module 개발 기초 연구)

  • Sung, Soojin;Lim, Chaeyeon;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.164-165
    • /
    • 2015
  • Modular construction technique is an adaptation of factory-based mass production concept in ordinary manufacturing industries to construction industry and it assumes that panels, units, etc. are fabricated in factories and assembled in construction sites. Given its structural limitations, modular construction technique is primarily used in low-story buildings whose maximum height is usually five stories, but researchers are actively studying possible adaptation of modular construction technique to high-rise building designs these days as in the case of infill-type modular construction design. Infill-type modular construction technique, most frequently used in high-rise building construction projects, completes frame construction first in reinforced concrete structures and fills unit modules in such structures. However, infill-type modular construction technique leads to longer construction schedule accompanying increase in construction cost, cost overrun due to additional of temporary work, and possible damage to units in the wake of facility construction. Accordingly, this study is performed as a basic study for the development of bottom-up infill-type modular construction technique intended to construct structural frames and fill in units sequentially in a bid to address such drawbacks of current infill-type modular construction technique.

  • PDF

Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager (현장 관리자 중심의 건축공사 가설기술 표준분류체계구축)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

Perception Based Definition of Construction Quality in Pakistan

  • Awan, Muhammad Yousaf Sadiq;Awan, Dr Muhammad Maqbool Sadiq
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.24-34
    • /
    • 2015
  • The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. A quantitative survey based approach was adopted in this constructive study. A questionnaire based survey was conducted, for the assessment of construction quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals, from the leading construction organizations/companies of Pakistan were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. After statistical analysis of survey feedback it was found reliable and valid for the inferential purpose to the target population of construction professionals. The quality perception was found to be project scope oriented, considered as an excess cost for a construction project and keeping the rework minimum by qualifying the required quality tests, keeping the defects minimum by ensuring the specifications of supplied material. Any quality improvement technique was expected to address the financial aspects of the construction project for the employer and contractor, by increasing the profitability through reduction in overall cost, reduction in time, reduction in defects and improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

An Enhanced TACT Technique for Finish Work of High-rise Residential Buildings

  • Kim, Sun-Kuk;Son, Ki-Young;Joo, Jin-Kyu;Lee, Dong-Hoon;Lee, Sung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.4
    • /
    • pp.396-406
    • /
    • 2011
  • Execution of the finish work for high-rise residential construction occurs when a mixture of work progresses simultaneously at each floor or sector and is carried on by highly-specialized subcontractor teams. Therefore, the finish work plan requires an effective scheduling method that interfaces between the work and the teams. In order to address these issues, the TACT technique is utilized in Korea. This technique is based on Line-of-Balance and Lean construction. However, according to recent case studies, finish work using TACT technique was frequently delayed with cost overruns because the work was performed without a detailed schedule control plan outlining the relationship between architecture and mechanical, electrical, and plumbing work. This paper describes the enhanced-TACT technique which provides a detailed work flow chart and TACT work template. With improved TACT technique, this paper will contribute to improved cash flow and reduced cycle time and provide quality improvement through work continuity.

Applications of Product Process Analysis For Improving the Construction Process of Structural Steel

  • Lee Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.101-108
    • /
    • 2004
  • A construction process consists of value adding activities and non-value adding activities, necessary or unnecessary. If construction personnel can eliminate inefficient and/or unnecessary activities within the process, they may have a great opportunity to improve their construction process. The Product Process Analysis (PPA) technique, which was developed in the manufacturing industry, can be applied for identifying wastes in the construction process and ultimately improving the process itself. It provides useful tools, such as a process chart worksheet and flow diagram, for mapping the flow of construction activities with predetermined standardized symbols. These tools make people understand the flow of activities more easily, identify value adding/non-value adding activities within the process, and areas where the process can be improved. The example applications of PPA are demonstrated in the paper through the case studies implemented on the construction process of structural steel. The results of case studies indicate that PPA technique was effective at identifying and removing wastes in the steel construction process. It is also found that PPA technique is more effective for improving highly repetitive construction processes.

STUDY OF NEW CAST-IN-PLACE MORTAR WALL FOR HOUSE CONSTRUCTION COMPARED TO BRICK AND MORTAR-BLOCK SYSTEM (A SIMULATION IN DIFFERENT AREAS)

  • Arief Setiawan Budi Nugroho;Shin-ei Takano
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.196-202
    • /
    • 2009
  • Study from Yogyakarta earthquake reconstruction program, cast-in-place wall using fix-size formwork system (Old-CIP) has offered a good alternative for house construction. A simulation has also confirmed that this system using mortar as the main material can provide cheapest cost and lowest total man power compared to conventional wall construction technique: brick or mortar-block wall. This paper presents the new wall construction technique: full size cast-in-place wall (New-CIP). The detail of how this new technique implemented is described. In addition, considering that material and labor cost in one area is different to others, cost analysis for different resources prices and wages of three cities are taken into a simulation. The analysis is aimed to distinguish the implementation feasibility of New-CIP system compared to the four common wall systems. Finally, its implementation resistance is also discussed.

  • PDF

A study on the development of the construction project for the preliminary estimate based on a database of the BIM technique. (데이터베이스 중심의 BIM기반 개산견적을 위한 모델 개발)

  • Bae, Seong-Jae;Suh, Bong-Gyo;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.92-93
    • /
    • 2013
  • Recently, a technique based on BIM has been rapidly increased on the construction project. Task such as a calculation of supply easily is proceeded by the technique. Also, an quick and precise preliminary estimate is possible because this technique can be applied. To sum up, this study suggests that the preliminary estimate based on a database of the BIM technique is applicable for the early stage of the construction project.

  • PDF

Benefits and Challenges of Modular Integrated Construction in Hong Kong: A Literature Review.

  • Abdelmageed, Sherif;Abdelkhalek, Sherif;Zayed, Tarek
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.278-288
    • /
    • 2020
  • Modular Integrated Construction (MiC) has gained quite momentum as it provides solutions for several problems in the construction sector, particularly in Hong Kong. MiC is converting the building into modules and erecting them easily on site providing various benefits, such as cost and time savings, better quality, lower risk, higher sustainability, less injuries and accidents, etc. The MiC is considered the best alternative to traditional construction approaches in solving the huge housing demand problem in many cities all over the world due to the time-saving privilege. The utilization of MiC is facing a lot of challenges, which are considered obstacles to the wide acceptance of this technique in the construction industry in Hong Kong. This, in turn, has led the interests of the research community to investigate its benefits and challenges aiming at addressing several solutions to harness the benefits of this technique and to tackle these challenges. The present research aims to review the main concept of MiC and to determine the benefits and the challenges of implementing MiC in construction industry. The findings of this research highlight the advantages and limitations of incorporating MiC technique in Hong Kong, which will help the stakeholders to effectively utilize this technique in the construction industry.

  • PDF

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

A Study on the Effect of the Construction Conditions on a Thermal Crack of Mat Foundation (매트기초의 온도균열에 미치는 시공조건의 영향에 관한 연구)

  • Lee, Do-Bum;Kim, Hyo-Rak;Choi, Il-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.1-4
    • /
    • 2003
  • Recently, a structure has been larger and higher under the improvement of construction technique. So, a concrete constructions that a mat foundation thickness of structure is over 80cm have been many. Also, because of the reason high strength concrete, the matter of thermal crack have become an important task to be solved absolutely. In a cause a thermal crack occurrence, there used, mixture of concrete, construction and so forth. In this study, we executed temperature and stress analysis of mat foundation to know the effect the construction condition a thermal crack of mat foundation. And we evaluated quantitatively about the occurrence possibility of thermal crack using the hydration heat analysis program. By using of this analysis technique, will can control skilfully the quality of a mat foundation in advance.

  • PDF