DOI QR코드

DOI QR Code

Perception Based Definition of Construction Quality in Pakistan

  • Published : 2015.06.01

Abstract

The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. A quantitative survey based approach was adopted in this constructive study. A questionnaire based survey was conducted, for the assessment of construction quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals, from the leading construction organizations/companies of Pakistan were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. After statistical analysis of survey feedback it was found reliable and valid for the inferential purpose to the target population of construction professionals. The quality perception was found to be project scope oriented, considered as an excess cost for a construction project and keeping the rework minimum by qualifying the required quality tests, keeping the defects minimum by ensuring the specifications of supplied material. Any quality improvement technique was expected to address the financial aspects of the construction project for the employer and contractor, by increasing the profitability through reduction in overall cost, reduction in time, reduction in defects and improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

Keywords

References

  1. Advice, E. & Checks, F., 1999. survey implementation, sampling, and weighting data.
  2. Al-tmeemy, S.M.H., Rahman, H.A.- & Harun, Z., 2012. Contractors' perception of the use of costs of quality system in Malaysian building construction projects. JPMA, 30(7), pp.827-838.
  3. Atkinson, D.E. et al., 2006. Canadian cryospheric response to an anomalous warm summer: A synthesis of the climate change action fund project "the state of the arctic cryosphere during the extreme warm summer of 1998." Atmosphere- Ocean, 44(4), pp.347-375. https://doi.org/10.3137/ao.440403
  4. Brazier, E. et al., 1992. GENERAL PRACTICE Validating the SF-36 health survey questionnaire : new outcome, 305(July), pp.160-164.
  5. Chan, K.M.A. et al., 2006. Conservation Planning for Ecosystem Services. , 4(11).
  6. Chase, T.N., Sr, R.A.P. & Castro, C., 2003. 1 \ Re Present Day Climate Simulations Accurate For Reliable Regional Downscaling ? Enough. Universities Council on Water Resources, 124, p.26-34, pp.26-34.
  7. Chung, K.-J. & Huang, T.-S., 2007. An optimal production run length with imperfect production process and nondecreasing percentage defective proportion. Journal of Information and Optimization Sciences, 28(4), pp.653-661. https://doi.org/10.1080/02522667.2007.10699766
  8. Heravitorbati, A. et al., 2011. Examination of process to develop a framework for better implementation of quality practices in building projects . , (September), pp.16-18.
  9. Hoonakker, P., Carayon, P. & Loushine, T., 2010. Barriers and benefits of quality management in the construction industry: An empirical study. Total Quality Management & Business Excellence, 21(9), pp.953-969. https://doi.org/10.1080/14783363.2010.487673
  10. Jaafari, a., 1996. Human Factors in the Australian Construction Industry: Towards Total Quality Management. Australian Journal of Management, 21(2), pp.159-185. https://doi.org/10.1177/031289629602100204
  11. Kanji, G.K. & Wong, A., 1998. Quality culture in the construction industry. Total Quality Management, 9(4-5), pp.133-140. https://doi.org/10.1080/0954412988758
  12. Lee, H.L., 2004. The triple-A supply chain. Harvard business review, 82(10), pp.102-12, 157.
  13. Love, P.E.D., Mandal, P. & Li, H., 1999. Determining the causal structure of rework influences in construction. Construction Management and Economics, 17(4), pp.505-517. https://doi.org/10.1080/014461999371420
  14. Marques de Sa, J.P., 2007. No Title 2nd ed., Springer US.
  15. Nawaz, T. & Ikram, A.A., 2013. Benefits and Impediments in Implementing Tqm in Pakistani Construction Sector., 5(4), pp.205-227.
  16. Pallant, J., 2007. SPSS Survival Manual. , (2nd), pp.90-93.
  17. Pheng, L.S. & Kwang, G.K., 2005. ISO 9001, ISO 14001 and OHSAS 18001 Management Systems: Integration, Costs and Benefits for Construction Companies. Architectural Science Review, 48(2), pp.145-151. https://doi.org/10.3763/asre.2005.4818
  18. Pipino, L.L., Lee, Y.W. & Wang, R.Y., 2002. Data quality assessment. Communications of the ACM, 45(4), p.211. https://doi.org/10.1145/505248.506010
  19. Wong, A., 1999. Total quality management in the construction industry in Hong Kong: A supply chain management perspective. Total Quality Management, 10(2), pp.199-208. https://doi.org/10.1080/0954412997956
  20. Yusoff, W. et al., 2004. Development of quality culture in the construction industry 1. , pp.1-11.