• 제목/요약/키워드: Construction Site Management

검색결과 1,474건 처리시간 0.028초

고층 철골공사의 사업관리 효율화를 위한 자동화 기술 적용 방안 연구 (Automation Technology Application for Efficient Project Management of Steel Framing High-rise Building Construction)

  • 김창섭;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.3-4
    • /
    • 2010
  • With improvements of information technology, the cases which automation technology are applied to construction site are increased. These technologies have advantages and limitations for construction site, therefore they has to be considered in order to maximize benefit. This study are to suggest the process for optimizing management of steel framing high-rise building construction.

  • PDF

건설사업의 효율적 안전관리를 위한 발주자, 설계자의 역할 (The Role of Owner and Designer for Effective Safety Management of Construction Projects)

  • 김보성;박찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.270-273
    • /
    • 2003
  • 국내 건설재해는 타 산업에 비하여 높은 수준이며, 안전관리활동도 시공단계에 국한되어 수행되고 있다. 하지만 일부 선진국에서는 건설현장 작업자들의 안전을 위해 안전관리활동을 사업초기부터 수행하여 재해발생의 소지를 사전에 회피, 차단 최소화하는 Safety Through Design에 관한 연구가 진행되고 있다. 이들 연구는 주로 발주자, 설계자의 안전책임과 역할에 초점을 두고 있다. 우리의 경우에도 국내 건설환경에 적합한 발주자, 설계자의 안전책임과 역할을 도출하고, 이를 근거로 사전예방적인 안전관리체계의 구축이 절실히 필요한 실정이다. 따라서 국내 건설사업의 효율적 안전관리를 위한 발주자, 설계자의 안전책임과 역할을 문헌연구와 설문조사에 근거하여 제시하였다.

  • PDF

건설현장 안전관리를 위한 스마트건설 기술에 관한 연구 (A Study on the Smart Construction Technology for Safety Management in Construction Sites)

  • 정인수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.297-298
    • /
    • 2021
  • The construction industry is a representative high levels of hazardous work environment, and the number of disasters in the construction industry is the highest compared to other industries. Information & Communication Technology(ICT) convergence technologies are being introduced worldwide, and this study considers ICT-based safety management cases at domestic and foreign, resulting in a list of technologies to recognize and resolve to construction site hazards. Technologies such as 「Development of hazard map considering cause, age, proficiency, type and timing of accident in construction industry」, 「Development of hazard map-based accident prediction platform using AI」, 「Development of smart safety management plan for whole construction work cycle」, 「Development of intelligent safety devices and smart safety equipment for mitigating hazard factors」 were derived as smart construction technologies that could solve this problem.

  • PDF

공정률에 따른 아파트 건설공사 현장관리비 산정모델 (An Estimating Model for Job-Site Overhead Costs according to Progress Rate)

  • 정기창;이재섭
    • 한국건설관리학회논문집
    • /
    • 제19권5호
    • /
    • pp.43-52
    • /
    • 2018
  • 일반적으로 공사비에 대한 연구는 직접비 위주로 행해졌으며, 간접비를 면밀하게 산정하는 모델에 대한 연구가 부족하다. 본 연구의 목적은 국내 건설시장에서 큰 축을 차지하는 아파트 건설공사 현장의 현장관리비를 예측하기 위한 모델을 제시하는 것이다. 아파트 건설공사 현장 다수의 전체공사기간 동안의 실비사용 데이터를 분석하여 곡선접합 분석을 통해 공정률별 1일당 현장관리비를 도출할 수 있는 9차방정식을 제안하였으며, 이를 활용하여 300억 규모의 공사의 경우의 현장관리비를 추정하는 결과를 보여줌으로서 활용가능성을 설명하고 있다. 선행연구에서는 총 현장관리비의 규모의 변화패턴을 직접적으로 확인할 수 있는 다항식을 도출한 사례는 없었던 점에 비추어 본다면, 본 연구에서 제시한 모델은 그 편의성과 면밀성에 합리적 근거를 토대로 현장관리비를 예측할 수 있다는 점에서 연구의 기여도가 있다.

건설현장의 품질·안전문제 해결을 위한 적정 건축시공기술자의 배치 관련 연구 (Deployment of Appropriate Architectural Construction Engineers to Solve Quality and Safety Problems at Construction Sites)

  • 김현준;김진동;신윤석
    • 한국건설관리학회논문집
    • /
    • 제25권4호
    • /
    • pp.15-23
    • /
    • 2024
  • 최근에 건설 중인 공동주택 구조물이 분괴하는 등 부실시공이 사회적 이유로 대두되고 있는 실정이다. 부실시공에 대한 원인은 다양하게 있고 요인별 미치는 영향도 다르겠지만 건설회사 시공관리자 측면에서 문제점을 알아보고자 하였다. 따라서 본 연구는 품질·안전문제 해결을 위해 건설현장의 건설회사 시공관리자의 배치에 있어 기술자 경력, 기술자 인원수, 기술자 투입시기 등의 적정성에 대해 알아보고자 한다. 본 연구 수행을 위해 객관적인 의견 조사를 위해 건설사업관리자를 대상으로 설문조사를 실시하였고, 그 결과 건설회사 시공관리자 수를 늘려야 하며, 또한 중간 경력의 시공관리자를 투입하여 실질적 관리가 가능하도록 하여야 하는 것으로 나타났다. 그리고 건설회사의 시공관리자의 계약직을 대폭 축소하는 동시에 안전관리자나 품질관리자와 유사하게 현장 시공관리자 투입인원을 제도적으로 규정할 필요가 있는 것으로 나타났다.

건설 통합DB 구축을 위한 시공현장등록번호 체계 개발 (Development of Unique Registration Number System for Construction Site Integrated DB)

  • 허윤경;이승우;유위성;김성환;성유경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.367-368
    • /
    • 2023
  • Kiscon, Seumteo, KONEPS and CSI are representative construction-related DBs. All four DBs are operated by the public. However, the characteristics of data are different depending on the purpose. Therefore, it is difficult to utilize integrated data and it is only used sparingly. Creating and sharing a unique key that can identify a construction site will enable integrated accumulation and management of construction-related data for various purposes. At this point, it is most efficient to assign a unique key based on KISCON. KISCOn data conforms to the construction site definition and covers most of the public, private, architectural and civil works. In addition, there is an advantage in that DB construction is performed in the construction situation, which is a relatively preceding process. In the future, it is necessary to create a practical construction site integrated DB through the production of an integrated key table containing linkage information of unique keys for site management, performance indicators, and statistics production.

  • PDF

건설 현장 가설기자재 운영현황 분석 및 개선 방안 도출 연구 (A Study on the Analysis of Current Situation and the Deduction of Improvement Measure Regarding the Scaffolding and the Related Components at Construction Site)

  • 정진우;김용곤
    • 한국안전학회지
    • /
    • 제34권5호
    • /
    • pp.63-71
    • /
    • 2019
  • Work Guideline of Construction Quality Management was revised in July 2017, and it has changed the perception of scaffolding in South Korea. The on site investigation and survey was performed on manufacturers, leasing companies, and quality inspection agencies regarding the compliance with the guideline for the scaffolding and the related components brought to the site. Moreover, the related guidelines and identified unsatisfactory quality management items were analyzed by each subject. As a result, the major factors that cause the problems were reasonably deducted. The related regulations to prohibit the delivery of faulty scaffolding components to the construction site in order to secure the safety of the temporary structure was suggested.

공사현장 자재관리 자동화를 위한 영상기반 인공지능 모델개발 (Development of Image-Based Artificial Intelligence Model to Automate Material Management at Construction Site)

  • 신윤수;김준희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.221-222
    • /
    • 2021
  • Conventionally, in material management at a construction site, the type, size, and quantity of materials are identified by the eyes of the worker. Labor-intensive material management by manpower is slow, requires a lot of manpower, is prone to errors, and has limitations in that computerization of information on the identified types and quantities is additionally required. Therefore, a method that can quickly and accurately determine the type, size, and quantity of materials with a minimum number of workers is required to reduce labor costs at the construction site and improve work efficiency. In this study, we developed an automated convolution neural network(CNN) and computer vision technology-based rebar size and quantity estimation system that can quickly and accurately determine the type, size, and quantity of materials through images.

  • PDF

REDUCTION OF SEDIMENT-LADEN WATER FROM CONSTRUCITON SITES INTO WATERWAYS:- A GOVERNMENT AND INDUSTRY APPROACH

  • Teo Ee Huat
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.285-291
    • /
    • 2009
  • Water is a strategic resource for Singapore due to its small land mass and more than half of the mainland serves as catchment for raw water, including construction sites. Construction site typically involves earthworks and in conjunction with the frequent and intense rainstorm in Singapore, produce runoff of high turbidity due to suspended sediments. The resulting high concentration of suspended sediment in construction site runoff very often leads to aesthetically unpleasant reservoirs and potentially increases the treatment cost of raw water. To mitigate this, the local standard requires the discharged concentration of total suspended solids of construction runoff leaving a construction site to be less than 50mg/l which is a very high standard. This paper will present, examine and discuss particular issues and practices of Singapore's construction industry in meeting this requirement. The focus will be on two areas: Government lead initiatives and industry practices. How the government agencies worked together with the industry professionals to develop a system to ensure meeting of the standard is discussed. In addition, the types of industry practices, including various Best Management Practice to reduce erosion in construction sites and implement effective sedimentation on construction sites are examined.

  • PDF

유비쿼터스 기반 건설현장 관리시스템의 구현 (Implementation of Ubiquitous-Based Construction Site Management System)

  • 연상호;이영욱
    • 한국인터넷방송통신학회논문지
    • /
    • 제13권2호
    • /
    • pp.239-244
    • /
    • 2013
  • 건설현장에서 공사 진행 사항을 실시간으로 취득하여 3차원 공간정보와 센서네트웍을 결합한 유비쿼터스 기반 건설현장 관리시스템을 구현함으로써 건설현장에 가서 공사 진척 현황을 확인해야 하는 수고와 시간을 아낄 수 있고 실시간 정보를 PC, 노트북 또는 스마트 폰 등으로 전송하여 공사 관련 담당자나 담당자가 있는 사무실 등에서 수신할 수 있도록 하였다. 특히, 건설현장의 공사 진행 현황은 물론 공사에 영향을 미칠 수 있는 온도, 습도 등의 환경정보 및 GPS 정보를 모바일 스마트 폰으로 제공함으로써 언제 어느 곳에서든지 필요한 정보를 제공받을 수 있을 뿐만 아니라 공사의 진행과 설계변경 등에 도움을 줄 수 있도록 하여 건설현장 실시간 자동관리가 가능할 수 있도록 연구되었다.