• Title/Summary/Keyword: Construction Period Reduction

Search Result 227, Processing Time 0.025 seconds

Field Application of Up-Up Construction Using Buried Wale Continuous Walt System Method (CWS공법(Buried Wale Continuous Wall System)을 적용한 Up-Up 시공사례)

  • Lee Jeong-Bae;Lim In-Sig;Kim Dong-Hyun;Oh Bo-Hwan;Ha In-Ho;Rhim Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.1-4
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved duality and reduction of construction period can be obtained from CWS method.

  • PDF

A Study on Application for Deck Plate Substitute Type Wood System Form of Frame Type Parking Lot (골조형 주차장의 Deck Plate 대체형 목제 시스템 거푸집 적용성 연구)

  • Shin, Yong-Jae;Shin, Woon-Sik;Heo, Jae-Won;Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.123-126
    • /
    • 2006
  • Existing Deck Plate for a one of system forms, there is various advantage and application actual results increasing rapidly. But design of deck is depending on engineering data collections or design data on deck manufacture ordinarily. When construct, is responsible for deflection occurrence, And Because confirmation of crack occurrence region is impossible, there is difficulty of repair, reinforcement about crack and water leakage. According to got following conclusion as result that economic performance, preservation administration and repair reinforcement develops easy using steel truss snap tie by wedge pin on coating plywood that is slab Panel Wood System Form method of construction there is Deck Plate's advantage. (1) In stab lower part is exposed disjointing in which a criminal is fastened to be interrogated after construction acceptance and repair, reinforcement of crack is possible (2) Construction cost curtailment effect of about 29.2% than conventional type and about 10% than deck plate (3) Construction period reduction of about 3 day than conventional type and about 0.3 day than deck plate (4) Labor curtailment effect more than about $29{\sim}50%$ from conventional type

  • PDF

Design and Implementation of Construction site Safety management System using Smart Helmet and BLE Beacons (스마트 안전모와 비콘을 이용한 건설현장 안전관리 시스템 설계 및 구현)

  • Seo, Kwi-Bin;Min, Se Dong;Lee, Seung-Hyun;Hong, Min
    • Journal of Internet Computing and Services
    • /
    • v.20 no.3
    • /
    • pp.61-68
    • /
    • 2019
  • The goal of the construction work in the past was to improve the efficiency through cost reduction and shortening the construction period. However, the importance of safety management has recently been emphasized, and the Ministry of Employment and Labor has set a goal of reducing the number of deaths caused by industrial accidents by half. As a result, institutional and legal improvements are pursued and the need for safety is emphasized. However, most construction companies, except for some large construction companies, are lacking in safety management. So, In this paper, we design and implement a safety management system for construction site using smart helmets and beacons.

Requirement Analysis Study for Development of 3D Printing Concrete Nozzle for FCP Manufacturing (FCP 제작용 3D 프린팅 콘크리트 노즐 개발을 위한 요구사항 분석연구)

  • Youn, Jong-Young;Kim, Ji-Hye;Kim, Hye-Kwon;Lee, Donghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.65-66
    • /
    • 2022
  • In the construction industry, interest in technologies such as 3D Construction Printing (3DCP) is increasing, and research is being conducted continuously. In the case of atypical architecture, different shapes must be implemented, and the introduction of 3D printing technology is intended to solve it. Our researchers are conducting research to produce Free-form Concrete Panel (FCP). It automatically manufactures the FCP's formwork without any error with the design shape. At this time, the concrete nozzle based on the 3D printing technology is developed and the concrete is precisely extruded into the manufactured form to prevent the deformation of the formwork that can occur due to the concrete load. Therefore, in this study, the requirements for the development of 3D printing concrete nozzles for FCP manufacturing are analyzed. Based on the analyzed requirements, the first nozzle was developed. Such equipment is easy to shorten construction period and cost reduction in the atypical construction field, and is expected to be utilized as basic 3D printing equipment.

  • PDF

A Study on Grounding Resistance by Parallel Connection (병렬 접속에 의한 접지저항에 관한 연구)

  • 고희석;최종규;류희석;김주찬
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.307-312
    • /
    • 2002
  • For accuracy of an experiment, measure changing of grounding resistance by short period after construction and investigated the efficiency of grounding's different methode of parallel connection. We could confirm on measurement's accuracy, error through comparing the theoretical value and measured value. Therefore, reduction ratio can be expected from execution measurement to receive a target resistance value. By the result, we could evaluate the method of rod grounding electrode's proper execution

  • PDF

Field Application of the Difference of Setting Time of Improving Super Retarding Agent of Foundation Mat Mass Concrete (기초매트 매스 콘크리트의 초지연제를 활용한 응결시간차공법의 현장적용)

  • Noh, Sang-Kyun;Baek, Dae-Hyun;Kwon, Hae-Won;Bae, Yeoun-Ki;Chung, Sung-Jin;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.57-60
    • /
    • 2008
  • According to the recent tendency that the buildings in the downtown concerning rising land prices and efficient use of building are gradually Manhattanized mainly the grand scaled residential buildings, structure of the buildings relates to safety and so the very thick mat concrete is selected as the foundation of architectures. Because mat concretes can not be simultaneously pour in a great quantity due to the circumstance at the field, not only the questions on the unification between the concretes pour on the upper layer and the lower layer are presented but also the cracks by the internal force from the difference of hydration exothermic period are occurred because of the time lag. Thus, this study checked the efficiency to apply "The hydration heat controlling method of mass concrete for horizontal partition pouring construction" to the skyscraper sites under construction at Haiundai in Busan. After applying this method, the result of observation that the cracks by hydration heat in all over the placement surface did never be founded. Also, in case of the economic analysis that the hydration heat reduction method using super retarding agent by difference of setting time is approximately 80% cheaper than the hydration heat reduction method by pipe cooling in the construction expenses.

  • PDF

Performance Evaluation of Smart Street Lighting Systems Applying the PFI Model

  • Hung-Yu Chou;Yu-Te Wei;Yu-Ting Lai;Jun-Teng Zhuang;Jun-Xi Liu;Wen-Chin Chang
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1278-1278
    • /
    • 2024
  • Private Finance Initiative (PFI) involves long-term contracts where private entities invest in the construction and maintenance of street lighting facilities. The current implementation of PFI Smart Street Lighting Systems faces challenges in the fulfillment process, including discrepancies in quantities, coordination of power variations, delays in the deployment of smart systems, and issues with performance indicator scoring. These challenges disrupt the smooth execution of contractual obligations. Nevertheless, the adoption of intelligent systems in street lighting presents significant advantages in reducing energy consumption, extending the lifespan of fixtures, and enhancing maintenance efficiency. This study aims to analyze an ongoing project, applying the Fuzzy Analytic Hierarchy Process (FAHP) to identify crucial PFI indicators and their weights. The study explores areas of improvement in the project compared to traditional street lighting, aiming to provide solutions to the mentioned challenges. The results indicate that indicators such as PS3 (Lighting Service Continuity) with a weight of 0.384% and PS4 (Smooth Operation of the Smart Street Lightings Management System) with a weight of 0.274% have the highest impact on service performance. Additionally, the project involves replacing 162,000 streetlights, resulting in a yearly energy consumption reduction of approximately 70%, a decrease in monthly maintenance time from an average of 48 hours to 15 hours, and an expected reduction of 900,000 tons in carbon emissions during the project period. Value for Money (VfM) analysis suggests an annual reduction in government expenditures of NTD 66 million. This reveals that implementing PFI model is more advantageous than traditional street lighting procurement, as it allows the government to leverage contractor financing and alleviate the initial high costs of streetlight replacement, thereby reducing the overall costs of streetlight establishment and maintenance.

Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea

  • Jung, In-Hye;Roh, Ho-Young;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.149-156
    • /
    • 2020
  • Blast furnace revamping in steel industry is one of the most important work to complete the complicated equipment within a short period of time based on the interfaces of various types of work. P company has planned to build a Smart Tracking System based on the wireless tag system with the aim of complying with the construction period and reducing costs, ahead of the revamping of blast furnace scheduled for construction in February next year. It combines the detailed design data with the wireless recognition technology to grasp the stage status of design, storage and installation. Then, it graphically displays the location information of each member in relation to the plan and the actual status in connection with Building Information Modeling (BIM) 4D Simulation. QR Code is used as a wireless tag in order to check the receiving status of core equipment considering the characteristics of each item. Then, DB in server system is built, status information is input. By implementing BIM 4D Simulation data using DELMIA, the information on location and status is provided. As a feature of the S/W function, a function for confirming the items will be added to the cellular phone screen in order to improve the accuracy of tagging of the items. Accuracy also increases by simultaneous processing of storage and location tagging. The most significant effect of building this system is to minimize errors in construction by preventing erroneous operation of members. This system will be very useful for overall project management because the information about the position and progress of each critical item can be visualized in real time. It could be eventually lead to cost reduction of project management.

  • PDF

Implementation of Customized EPM for Collaborative Resource Procurement in Small and Medium Size Plant Construction Enterprises (중소플랜트기업의 협업자원조달을 위한 Customized EPM구현)

  • Nam, Jung-Tai;Kim, Sung-Hun;Han, Young-Geun
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.2
    • /
    • pp.133-141
    • /
    • 2008
  • The need for total enterprise management that covers from accepting orders, design, cost, procurement, manufacture, and delivery has been recently raised in order for efficient project management of small and medium size plant construction enterprises. This trend is reflected in the introduction of EPM(Enterprise Project Management) solutions by some shipbuilding enterprises and large construction corporations. In step with the trend, small and medium size plant construction enterprises are enabled to provide knowledge base in terms of reducing cost and production period and managing portfolio for accepting orders and attaining contract by inducing customized EPM This study presents a design of customized EPM based on a case study of a company. It exhibits a collaborative/collaboration resource-supply model which can be universally applied to small and medium size job-order production enterprises. The research discusses that under the assumption that information is shared internally between departments on planning, supply, manufacture, and quality control in order to create collaborative environment and close participation is created externally between suppliers and orderers, productivity can be improved in cost reduction through planning efficient collaborative supply model.

Study on Development of CWS (buried wale Continuous Wall System) Method (CWS공법(buried wale Continuous Wall System)의 개발에 관한 연구)

  • Lee Jeong-Bae;Lim In-Sig;Chun Sung-Chul;Oh Boh-Wan;Ha In-Ho;Rhim Hong-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.2 s.20
    • /
    • pp.81-89
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved qualify and reduction of construction period can be obtained from CWS method.