• Title/Summary/Keyword: CWS 공법

Search Result 10, Processing Time 0.028 seconds

Development of a Mountaineering Jacket Design Using a CWS(Construction Without Sewing) Method (무봉제(Construction Without Sewing: CWS)공법을 활용한 등산복 재킷 디자인에 관한 연구)

  • Chung, Sham-Ho;Kang, Min
    • Journal of the Korean Society of Costume
    • /
    • v.61 no.6
    • /
    • pp.1-14
    • /
    • 2011
  • With the trend of wearing mountaineering wear as casual apparel as well as a continuous increase of mountaineers, mountaineering wear market has rapidly grown. New techniques to improve mountaineering apparel have been developed. Construction Without Sewing(CWS) is one of them. It is a sewing technique to improve performance and functions of new functional mountaineering apparel. CWS employs a welding machine with an adhesive tape and press instead of sewing so that it makes the apparel lighter and have better wearability, durability, and windproof and waterproof function, than sewed apparel. This study focuses on the concept, nature, and applications of the mountaineering wear manufactured by CWS. It also made an analysis of manufacturing process, and proposed three designs for the mountaineering wear created by CWS. With introducing the merits of CWS, the costumers will be have better understanding of CWS and break their stereotype that functional clothing is simply expensive without considering its benefits.

Study on Development and Application of CWS(Continuous Wall System) II Method (CWS(Continuous Wall System) II 공법의 개발 및 적응에 관한 연구)

  • Lim, In-Sig;Lee, Jeong-Bae;Choi, Sun-Young;Lee, Jai-Ho;Woo, Sung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.57-64
    • /
    • 2009
  • CWS I method developed to overcome the problems of frequent occurrence in the application of existing downward construction methods has demonstrated excellent efficiency. However, in the case of using slurry wall instead of SCW or CIP as a retaining wall, the improvements in connecting steel beams with the wall were demanded. Therefore, the study of CWS II method was carried out in order to accomplish the CWS I method reflecting its strong points and to ensure the settlement of a steel beam and to induce the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. In this paper, the concept and features of CWS II method as well as the progress of execution was discussed by comparing with existing methods.

Comparison of Removal Efficiencies in Single and Duplex Ventilation Constructed Wetland Systems for Treating Domestic Sewage (단일 통풍형과 이중 통풍형 인공습지시스템의 하수처리 효율 비교)

  • Seo, Dong-Cheol;Lim, Seok-Cheon;Jo, In-Seong;Lee, Byeong-Ju;Lee, Hong-Jae;Kim, Sang-Don;Lee, Jun-Bae;Cho, Ju-Sik;Heo, Jong-Soo
    • Korean Journal of Environmental Agriculture
    • /
    • v.28 no.3
    • /
    • pp.258-265
    • /
    • 2009
  • To develop environmentally friendly constructed wetlands(CWs) for treating domestic sewage which was produced in farming and fishing village, the efficiency of water treatment at different ventilation systems in the vertical bed, depths of horizontal bed, and sewage loads was investigated. In the vertical bed, BOD and COD by duplex ventilation system were lower than those by single ventilation system. But T-N and T-P concentrations by both ventilation systems in the vertical bed were little different. In the horizontal bed, BOD, COD, T-N and T-P in 1.0 m and 1.3 m depths were little different. To reduce the CWs' area and to improve the pollutant removal efficiencies, the optimum depth of horizontal bed was 1.3 m. In single and duplex ventilation CWs, the removal rate of BOD, COD, SS, T-N and T-P decreased slightly with the sewage load increases. In same sewage load conditions, the removal rates of BOD, COD, SS, T-N and T-P by duplex ventilation CWs were higher than those by single ventilation CWs. In summary, to effectively treat domestic sewage from farming and fishing village, the optimum constructed wetlands would be the duplex ventilation CWs.

Characteristics and Applicability of CWS(Continuous Wall System)II Method (CWS(Continuous Wall System)II 공법의 특성 및 적용성)

  • Lim, In-sig;Lee, Jeong-bae;Kim, Jae-dong;Lee, Jai-ho;Woo, Sung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.43-47
    • /
    • 2008
  • CWSII method was developed to overcome the problems of frequent occurrence in the application of existing downward construction methods, especially in the case of using slurry wall instead of SCW or CIP as a retaining wall. By the improvements in connecting steel beams with the wall, CWSII method is able to ensure the settlement of a steel beam and the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. As the desired results, CWS method can be applied as a practical downward construction method regardless of the type of retaining wall. In this paper, besides the concept and features of CWSII method, it can be seen that the method can provide reliable and economical performances by comparing with existing methods.

  • PDF

Study on Development of CWS (buried wale Continuous Wall System) Method (CWS공법(buried wale Continuous Wall System)의 개발에 관한 연구)

  • Lee Jeong-Bae;Lim In-Sig;Chun Sung-Chul;Oh Boh-Wan;Ha In-Ho;Rhim Hong-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.2 s.20
    • /
    • pp.81-89
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved qualify and reduction of construction period can be obtained from CWS method.

Field Application of Up-Up Construction Using Buried Wale Continuous Walt System Method (CWS공법(Buried Wale Continuous Wall System)을 적용한 Up-Up 시공사례)

  • Lee Jeong-Bae;Lim In-Sig;Kim Dong-Hyun;Oh Bo-Hwan;Ha In-Ho;Rhim Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.1-4
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved duality and reduction of construction period can be obtained from CWS method.

  • PDF

Analysis of Cases Using Top-Down Construction Method Under Various Site Condition (현장 조건에 따른 Top-Down 공법 사례분석에 관한 연구)

  • Shin, Hyun-Jung;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.197-199
    • /
    • 2011
  • To utilize the Top-Down construction method, it is required to analyse building area, floors, and soil conditions to choose the three basic elements of retaining wall, base column, and floor structure. The purpose of this research is to compare the methods of Top-Down with other construction methods. The research method is to analyse the project conditions of Top-Down project cases. The aim is to develop a method of selecting alternatives, considering construction characteristics, work schedule, supporting methods, foundation types.

  • PDF

Compression Tests on Opened Slab (개방형 슬래브의 압축 성능 실험)

  • Choi, Lin;Goh, Soo-Jin;Yom, Kyong-Soo;Jeon, Keum-Seok;Rhim, Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.29-31
    • /
    • 2007
  • Building construction in downtown is ever increasing with a strong demand. Top-Down Method is one of suitable construction method for its advantage in minimizing disturbance to neighborhood. Along with these reasons construction site has developed lots of new methods and materials for Time-Cost Trade-off and improving constructability. Opened Slab is one of these method which resist the horizontal force by slab and it has many merit about construction time and unity. We analyze the compression tests on opened slab for the application.

  • PDF

Study on the Application of Semi-open cut Top-Down Construction for Framework (세미 오픈컷 역타공법의 현장적용에 관한 연구)

  • Sho, Kwang-Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.2
    • /
    • pp.129-138
    • /
    • 2011
  • Construction methods for underground structure are classified as bottom-up, up-up, and top-down methods depending on the procedure of construction related to a superstructure. In top-down construction methods, building's main structure is built from the ground level downwards by sequentially alternating ground excavation and structure construction. In the mean time, the main structure is also used as supporting structure for earth-retaining wall, which results in the increased stability of the earth-retaining wall due to the minimized deformation in adjacent structures and surrounding grounds. In addition, the method makes it easy to secure a field for construction work in the downtown area by using each floor slabs as working spaces. However top-down construction method is often avoided since an excavation under the slab has low efficiency and difficult environment for work, and high cost compared with earth anchor method. This paper proposes a combined construction method where semi-open cut is selected as excavation work, slurry as earth -retaining wall and CWS as top-down construction method. In the case study targeted for an actual construction project, the proposed method is compared with existing top-down construction method in terms of economic feasibility, construction period and work efficiency. The proposed construction method results in increased work efficiency in the transportation of earth and sand, and steel frame erection, better quality management in PHD construction, and reduced construction period.