• Title/Summary/Keyword: Building Project

Search Result 2,461, Processing Time 0.027 seconds

The Constitutional Directions of Construction Information Management System Between Design and Construction in the Building Project (설계/시공간의 효율적인 정보통합관리를 위한 건설정보처리시스템 구축 방안)

  • Oh Seung-Jun;Lee Kyung-Kook;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.464-467
    • /
    • 2002
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. This research proposed the optimization method of building system which is satisfied with performance of building, cost, constructability, and proposed the information management plan which is connected with that. And The construction information in this research is restricted to design/construction information which is considerate in design step.

  • PDF

Structural Design of Vibration Controlled Tall Building with Overhang Structure

  • Ishibashi, Yoji;Yoshizawa, Katsuhito;Ogawa, Ichiro;Tamari, Masatoshi;Nagayama, Kenji;Oki, Hatsuka
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.177-183
    • /
    • 2019
  • This paper describes the structural design of a 212 m tall building currently under construction in the Tokiwabashi District Redevelopment Project facing Tokyo Station. In this project there was a requirement to rationally solve many issues arising from the conditions of the redevelopment project. In particular, the following two points were considered to be important from the point of view of structural design. 1) To provide an overhang frame with the perimeter columns on the lower stories inclined, in order to enable a typical floor area that greatly exceeded the limitations of the underground structure shape. 2) To provide high grade seismic performance for the office buildings to be constructed on prime city center land. LSCVCS (Lower Stories Concentrated Vibration Control System) was proposed as the method of rationally designing the overhang frame, which is an extremely disadvantageous element in the structural scheme of the tall building with a large slenderness ratio. LSCVCS is a system to provide effective damping by arranging vibration control devices in a concentrated manner in a lower story with large story height, that produces large deformation in an earthquake. Also, the vibration control devices arranged in the lower story are limited to viscous devices, to take into consideration the residual deformation of the overhang frame after an earthquake. The results of investigations into the specific effects of the system for the seismic design are reported, including Performance-based seismic design.

The Effect of PMIS Quality on Project Management Success (PMIS의 품질이 프로젝트관리의 성공에 미치는 영향 분석)

  • Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.117-126
    • /
    • 2010
  • As one of the key IT applications, the project management information system (PMIS) has played a significant role in construction management processes. This is because PMIS is an information system that gathers, integrates, and disseminates the output of project management processes among project participants, and is used to support all aspects of a project, from initiation through closing. This paper aims to identify the CSFs(Critical Success Factor) of Project Management and quality associated with Project Management Information System (PMIS) in construction projects, to analyze the Effect of PMIS quality on Project Management Success. The CSFs of Project Management and the quality components for PMIS are identified through a review of the literature, and consolidated through interviews with professionals in the construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor), and 253 completed questionnaires were retrieved. To increase the applicability of the results, the respondents consisted of workers spread across various parts of the construction site. Using SPSS 12.0, the data was used to analyze the relationship between PMIS Quality and Project Management Success through multiple regression analysis. These findings help to clarify what the highly prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

A Study on the Simple Criteria to distinguish being or not facilities of Consultation about Energy Use Plan (에너지사용계획 협의대상 시설여부를 판별하기 위한 간편한 기준에 관한 연구)

  • Suh, Kwang-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.10
    • /
    • pp.4704-4710
    • /
    • 2011
  • In order to set the simple criteria to distinguish being or not facilities of Consultation about Energy Use Plan, data analysis and case analysis were carried out. This paper proposes that building, one of the facilities, is being object of the Consultation about Energy Use Plan when in the public project, its gross area is more than 75,000 $m^2$ or main transformer capacity is more than 9,000 kVA and when in the private project, its gross area is more than 100,000 $m^2$ or main transformer capacity is more than 11,500 kVA. Also shows that factory, another of the facilities, is being object when in the private project, its main transformer capacity is more than 6,000 kVA or boiler capacity is more than 24 ton/h and when in the public project, its main transformer capacity is more than 3,000 kVA or boiler capacity is more than 12 ton/h.

Assessment of Equity Market Responses on the Construction Project Awards (건설프로젝트 수주에 대한 시장의 평가)

  • Choi, Jong-Soo;Heo, Seong-Tae;Lee, Hee-Min
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.221-228
    • /
    • 2010
  • A construction firm's performance is largely attributable to performance in individual projects. In this regard, the awarding of an individual project has significant implications. However, project awards have received limited attention in the construction sector from amarket assessment perspective. This event study focuses on an analysis of market responses at the time of project awarding. A total of 252 samples wereselected through a rigorous sample screening processes. Performance was measured as cumulative abnormal return, which is traditionally adopted in event analysis. Research results indicated that the overall return is positive, and that the level isstatistically significant. Equity holders realized a higher return for projects awarded from the foreign countries compared to domestic projects. No relationship was observed between project size and the level of return. Other research findings and implications were discussed in detail from a management perspective.

Action Research: the Use of Enterprise Resource Planning System in Construction Engineering and Project Management

  • Chan, Eric W.L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.18-27
    • /
    • 2011
  • Although information communication technology (ICT) is long regard as very useful tool in today's construction engineering and project management environment, organizations must not only operate based upon its original setting, but also requires on-going observation, additional features and fine-tuning actions before the desirable outcome can be achieved. However, it is a very common phenomenon that organizations purchase the licensed "off-the-shelf-software" package and customize it to suit their own business need. Due to the incapability of such software and inefficient customization, the possible result is making that ICT tool not user-friendly and sometimes the whole system becomes obsolete. The purpose of this paper is to review and report those actions taken (between February 2006 and December 2010) by a construction organization to enhance the performance of its Enterprise Resource Planning (ERP) system launched in December 2002. Such actions include: improving data inputting method; removing the transition bottleneck; introducing crystallization function; revising the organization's "Delegation and Limits of Authority"; publishing the "League Table" amongst users; integrating the 3D Mode into the system and upgrading hardware. Whilst the ultimate goals of such system are well beyond the time limit of this research study, an obvious interim result, achieved by this case studied organization, was winning a landmark project worth US$500 million after the ERP system was functioned properly and effectively. Their experience and success becomes an exemplar which can be borrowed by those companies, from managerial perspectives and as a roadmap, planning to adopt information technology (IT) strategy and use ICT tool in the construction engineering and project management framework. Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.

The Open Top Construction Method for the PHWR Reactor Building (중수로형(重水爐形) 원자로 건물의 Open Top시공공법)

  • 이수득
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.3
    • /
    • pp.41-45
    • /
    • 2001
  • The nuclear power plant(NPP) construction is a mammoth project, which requires a huge construction budget and the long construction duration of about 7 years. Recently there is a trend to shorten the construction period, to save the construction cost and to ensure the competitiveness through adopting the open top construction method. In this method, the major equipment are moved into the building through its top, and the internal works of the reactor building are being in process without installation of a dome roof.

  • PDF

Analysis Model on Risk Factors of RCB Construction in Nuclear Power Plant (원자력 발전 플랜트 RCB 시공의 리스크 요인에 관한 분석 모델)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.212-213
    • /
    • 2014
  • The purpose of this study is to suggest analysis model of RCB construction in nuclear power plant. For the objective, This study drew the risk factors of RCB construction from existing literature. The results of the study proposed analysis model made hierarchy in rebar, form, and concrete work. These will be baseline data for risk management in construction project of nuclear power plant.

  • PDF

A Study on Modular System Efficiency using 5D BIM Tool (5D BIM Tool을 활용한 모듈러시스템의 효율성 연구)

  • Kim, Min-Woong;Hwang, In-Ho;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.208-209
    • /
    • 2013
  • Recently, there is a growing interest in BIM and modular method because of changing in users attitudes about quality of building and construction environment. however, In domestic, study on Modular method still have addressed primarily basic contents. This study check efficiency about this process through comparative analysis of Modular method and RC method used 5D BIM tool for real project and suggest a fitting schedule management method for modular method.

  • PDF

A study on the BIM Design Process in the Free-form Design Project: -Focused on the Dongdaemun Design Plaza(DDP) Project- (비정형 설계 프로젝트의 BIM설계 프로세스에 대한 연구 : -동대문 디자인 플라자(DDP) 프로젝트를 중심으로-)

  • Ha, Seung-Beom
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.473-479
    • /
    • 2020
  • Since the 21st century a free-form building has been noticeably constructed. Now the definition "the monumental architecture is a free-form one." has come to be established. As a free-form building became a landmark of the city and a factor rising a value of the building all around the world, it is currently required to consider a more efficient design process. Therefore this research aims to learn approaches of the lasting free-form design process by considering the design process of Dongdaemun Design Plaza(DDP) designed by 'Zaha Hadid' that is a typical free-form building of Korea and the correlation between the design in the conceptual stage and the BIM(Building Information Modeling) design in practical stage.