• 제목/요약/키워드: 4D modeling

검색결과 1,294건 처리시간 0.025초

역설계를 통해 BIM 구축시에 3D 모델링에 대한 세밀도(LoD) 정립 - 지상 LiDAR 활용한 3D 모델링 연구 중심 - (Definition of 3D Modeling Level of Detail in BIM Regeneration Through Reverse Engineering - Case Study on 3D Modeling Using Terrestrial LiDAR -)

  • 채재현;이지영
    • 한국BIM학회 논문집
    • /
    • 제7권4호
    • /
    • pp.8-20
    • /
    • 2017
  • When it comes to set up the BIM through the reverse engineering, the level of detail(LoD) required for finalized outcomes is different from each purpose. Therefore, it is necessary to establish some concrete criteria which describe the definition of LoDs on 3D modeling for the purpose of each reverse engineering. This research shows the criteria of the 1) positional accuracy, 2) generalization level, 3) scale level, 4) scope of description, and 5) the area available for application by classifying LoD from 1 to 6 on 3D modeling for each purpose of reverse engineering. Moreover, through applying those criteria for the 3D point cloud dataset of building made by terrestrial LiDAR, this research finds out the working hour of 3D modeling of reverse engineering by each LoDs according to defined LoD criteria for each level. It is expected that those findings, how those criteria of LoD on reverse engineering are utilized for modeling-workers to decide whether the outcomes can be suitable for their budget, applicable fields or not, would contribute to help them as a basic information.

DEVELOPMENT OF STRATEGIES FOR APPLICATION OF 4D MODELING IN CONSTRUCTION MANAGEMENT

  • Yang-Taek Kim;Chang-Taek Hyun ;Kyo-Jin Koo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1181-1186
    • /
    • 2005
  • In many construction projects, progress and efficiency are hampered by poor communication of discipline-specific models. For example, architects use 2D or 3D CAD models and builders use CPM diagrams, Gantt charts, and spreadsheets to show their view of the project. Nowadays, advanced computer visualization tools, 4D CAD or VR, can show these disparate models to understand cross-disciplinary impacts of design and construction decisions. In Korea, several leading companies have tried to apply these tools to their pilot projects from the design phase to the maintenance phase. These companies have expected that more project stakeholders could understand a construction schedule more quickly and completely with 4D visualization than with the traditional construction management tools. However, modeling of the 4D CAD or VR can be quite time-consuming and expensive to generate manually and has therefore limited the spread and use of these models. In order to adopt widely those models in construction industry, the areas that those tools could support to take large benefits in diverse functional areas of construction management need to be analyzed. In this study, researchers analyze the usefulness and limitations of the 4D models and VR in the construction industry, develop the strategy of application priority, and improve the 4D modeling method.

  • PDF

BIM 기반 3차원 모델 라이브러리를 통한 모듈러 교각의 정보모델링 (Information Modeling of Modular Bridge Pier using BIM Based 3D-Model Library)

  • 조제헌;김동욱;이광명;남상혁
    • 한국BIM학회 논문집
    • /
    • 제3권4호
    • /
    • pp.11-18
    • /
    • 2013
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the collaboration between the contractor, designer, fabricator and constructor. Therefore, a readily accessible information model based on BIM technology should be provided for their communication during a construction project life-cycle. In this study, BIM based 3D information modeling was carried out for the modular bridge pier. First, the product breakdown structure (PBS) and level of detail (LOD) of the pier were defined. Based on them, 3D models were created by using parametric modeling method. In addition, database was constructed for the exchange of geometry and property data of 3D models. Finally, application areas of 3D information model were suggested, including the quantity estimation and the 4D simulation.

BIM 기반의 설계를 위한 프리캐스트 콘크리트 승강장의 정보모델링 (Information Modeling for BIM Based Design of Precast Concrete Platform)

  • 정지숙;이광명;박기현;박영식
    • 한국BIM학회 논문집
    • /
    • 제4권1호
    • /
    • pp.1-7
    • /
    • 2014
  • The construction method using PC(Precast Concrete) has been widely used because the method can shorten the construction period and improve construction quality. In this paper, through the analysis of present design process for PC railway platform, design parameters on the geometry and properties were extracted and 3D information models for PC railway platform were constructed by the parametric modeling technique. Furthermore, the interface module was developed to link 3D models to the structural analysis/design sheet and database program using VBA(Visual Basic Application). This information model could be used in various areas including structural analysis and design, 2D drawing, quantity estimation and 4D simulation including clash detection.

자기부상시스템의 자기력 모델링 시스템 개발 (Development of Magnetic Force Modeling Equipment for Magnetic Levitation Systems)

  • 양지혁;김석윤;이영삼;권오규
    • 제어로봇시스템학회논문지
    • /
    • 제17권4호
    • /
    • pp.321-327
    • /
    • 2011
  • This paper proposes an equipment and an algorithm for modeling the magnetic force of electromagnets in magnetic levitation systems. We assume that the magnetic force model is represented in terms of a 2D lookup table. The 2D lookup table is constructed by applying noncausal filtering and interpolation to data measured by the proposed modeling equipment. The proposed modeling equipment is designed such that it can measure the magnetic force exerted on the levitation object while it changes the voltage applied to the electromagnet and position of the levitation object. The algorithm of making a 2D lookup table has two stages. The data measured by the proposed modeling equipment is smoothed by a noncausal filter and then the 2D lookup table is obtained by interpolating filtered data. The proposed modeling method has advantages of time-saving, model consistency, and chance of automation for mass production. We show the validity of proposed method through control experiments.

수송장비의 실시간 가상 시뮬레이션을 위한 3차원 데이터베이스의 체계적인 구축 프로세스 (A Systematic Construction Process of 3D Database for Realtime Virtual Simulation of Transportation Equipments)

  • 김보현
    • 산업공학
    • /
    • 제16권2호
    • /
    • pp.258-267
    • /
    • 2003
  • Recently, virtual reality technologies have been rapidly developed and realtime virtual simulation methods have been extensively employed for several application areas such as game, sports, manufacturing, military, and so on. A 3D database in realtime virtual simulation plays a key role because it makes users feel reality in virtual space. In a application view of 3D database, a systematic construction approach is required to reduce its construction time and increase its quality. However, many researches have been mostly focused on realtime graphic issues and its key technologies. In virtual simulation of transportation equipments, this paper proposes a systematic construction process of 3D database consisting of four stages as follows: 1) determine the activity space of a equipment, 2) collect data related to 3D database construction, 3) make a 3-dimensional modeling strategy, and 4) generate and evaluate a 3D model. This paper also introduces a new procedure of 3D environment modeling, which summarizes and expands our modeling experiences, to be used as a modeling guide.

건설사업관리의 BIM(Building Information Modeling) 적용 가능성에 관한 연구 (A Study on The Possibility of BIM(Building Information Modeling) Application of Construction Management)

  • 심진규;이혜인;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권2호
    • /
    • pp.49-60
    • /
    • 2010
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But the each role of participants is individually changed to step in construction process stage and moreover it has complicated, entangled interests. The Construction Management was inducted for the effective management and operation of construction project. The Key of the Construction Management success depends on the cooperative relationship relation to major participants. The domestic construction system is difficult with many trial and errors for the frequent plan change. As the building are more bigger and complicated, Building Information Modeling is demanded design and maintenance. This evaluation was done by the trust on the system as well as Construction Management. And then it applies the BIM it analyzes the example of construcrion project.

Variational Data Assimilation for Optimal Initial Conditions in Air Quality Modeling

  • Park, Seon-Ki
    • Journal of Korean Society for Atmospheric Environment
    • /
    • 제19권E2호
    • /
    • pp.75-81
    • /
    • 2003
  • Variational data assimilation, which is recently introduced to the air quality modeling, is a promising tool for obtaining optimal estimates of initial conditions and other important parameters such as emission and deposition rates. In this paper. two advanced techniques for variational data assimilation, based on the adjoint and quasi-inverse methods, are tested for a simple air quality problem. The four-dimensional variational assimilation (4D-Var) requires to run an adjoint model to provide the gradient information in an iterative minimization process, whereas the inverse 3D-Var (I3D-Var) seeks for optimal initial conditions directly by running a quasi -inverse model. For a process with small dissipation, I3D-Vu outperforms 4D-Var in both computing time and accuracy. Hybrid application which combines I3D-Var and standard 4D-Var is also suggested for efficient data assimilation in air quality problems.

지상 송신원 항공 전자 탐사 1차원 모델링 (One-dimensional Modeling of Airborne Transient Electromagnetic using a Long Grounded-wire Source)

  • 조인기;김래영;이명종
    • 지구물리와물리탐사
    • /
    • 제18권4호
    • /
    • pp.216-222
    • /
    • 2015
  • 항공 전자 탐사법은 지하 천부의 전도성 광체 탐사를 위하여 이미 수십년 전에 도입되었다. 그러나 통상적인 시간 영역 항공 전자 탐사(ATEM) 시스템은 신호가 미약하여 가탐 심도에 한계가 있다. 최근 이러한 문제점을 극복하기 위하여 지상 송신원 시간 영역 항공 전자 탐사법(GREATEM)이 개발되었다. GREATEM은 지상에 설치된 긴 전선을 송신원으로 사용하는 준 항공 전자 탐사법이다. 항공 전자 탐사에서는 방대한 자료가 획득되므로, 계산 시간의 절감을 위하여 대개 1차원 해석 방법이 사용되고 있다. 그러나 GREATEM은 1차원 모델링의 경우에도 긴 전선을 따라 수치 적분이 필요하므로 루프 송신원을 사용하는 ATEM의 1차원 모델링에 비하여 계산 시간이 많이 걸린다는 문제점이 있다. 이 논문에서는 일반적인 1차원 모델링보다 비교할 수 없을 정도로 계산 속도가 빠른 ABFM법을 도입하여 ATEM 1차원 모델링을 수행하였다. 통상적인 모델링과 ABFM 결과를 비교한 결과, ABFM법은 GREATEM 1차원 모델링에도 적용 가능할 것으로 확인되었다.

케이슨의 3D 설계 및 안정 검토 자동화 시스템 개발 (The Development of Automated System for 3D Design and Stability Evaluation of Caisson)

  • 이헌민;김현승
    • 토지주택연구
    • /
    • 제11권4호
    • /
    • pp.105-113
    • /
    • 2020
  • In this research, the automated system for 3D modeling and stability evaluation of caisson was developed. It is possible to build a BIM model while examining the stability of the structures to improve the practical use of BIM technology. This study analyzed industry cases and guidelines for caisson stability evaluation and BIM-based modeling. As a result, the data for calculating the stability evaluation of caisson as well as the modeling parameters were derived. In particular, the automated system for 3D modeling, which reflects more than 30 parameters, allows for BIM models for various types of the caisson, such as open-cell caisson, open-cell caisson with uneven, slit caisson, slit caisson with uneven, and curved caisson. The study tested the proposed system using case studies and found that it helps not only to automate the BIM model with various caisson types as parameters but also to make partial shape changes accessible. The study also confirmed that the stability evaluation can be quickly carried out with shapes changed. Finally, the study results suggest that the proposed method should complete the task seven times as fast as the conventional work method.