• Title/Summary/Keyword: 화력발전 플랜트

Search Result 93, Processing Time 0.028 seconds

Environmental Noise Prediction for Large Power Plant and Desalination Plant (대형 발전/담수 플랜트의 환경소음 해석 및 평가)

  • Song, Keun-Bok;Kim, Dong-Hae
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.345-349
    • /
    • 2008
  • In this paper, environmental noise analysis was performed for large power plant and desalination plant. Ray tracing method was used to predict inside noise of turbine building. It is important to design the plant with the allowable noise level. To improve the accuracy, main noise sources were estimated based on the field data. As the results of analysis, it was concluded that noise levels slightly exceed the specified noise limit in turbine building inside. In order to reduce the noise level, adding sound-absorbing materials to inside wall of turbine building was suggested and verified with the confirmed analysis model.

  • PDF

Evaluation of the High Temperature Degradation of the Rotor of a 500 MW Tandem Steam Turbine (500 MW급 텐덤형 스팀 터빈 로터의 고온 열화평가)

  • Ku, Dae-Hwan;Yoo, Ho-Sun;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.10 no.1
    • /
    • pp.40-46
    • /
    • 2014
  • The metallographic examination and hardness measurements were conducted for the rotor of the 500 MW tandem steam turbine of Unit 4 in Dangjin Thermal Power Plants at the locations of steam inlet where the high temperature steams pass; high and intermediate pressure turbines. Creep cavity and degradation levels of optical micrographs of them are observed. The remaining life time of 201,523h for the rotor of the 500 MW tandem steam turbine of Unit 4 in Dangjin Thermal Power Plants was determined by the results of the inspection.

  • PDF

Selection of Maintenance Interval Based on RCM for a Coal Handling Equipment (신뢰도중심정비에 의한 석탄취급설비 정비주기선정)

  • Cho, Il-Yong;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.9 no.4
    • /
    • pp.37-42
    • /
    • 2013
  • Power plants have many components and equipment. It is difficult for operators to know the each equipment fails or what equipment fails. It is important to prevent failure in advance. Recently, outlook of maintenance tasks is changing from time based maintenance to condition based maintenance. In this study, we selected RCM-based maintenance intervals for coal handling equipment at coal power plant. For RCM analysis, we have made great progress in a maintenance task and interval. If we apply RCM analysis to the whole plant system, we can expect qualitative improvement and efficient operation of power plant system.

  • PDF

Development of Risk Based Inspection (RBI) Procedures for Optimized Preventive Maintenance (PM) Planning of Energy Plants (에너지플랜트의 최적 예방점검을 위한 위험도기반 설비 관리(RBI) 절차 개발)

  • Choi, Jeong-Woo;Yoon, Kee-Bong
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.1
    • /
    • pp.74-80
    • /
    • 2011
  • Recently, needs for extending remaining life and integrity of the aged energy plants are increased since the most domestic plants have been operated over 10 years. This need makes RAM (reliability, availability and maintainability) of the plant become more significant. RBI (risk based inspection) is main technology to increase RAM in energy plants. So far RBI has been developed mainly in the field of process plants (chemical/refinery), underground buried pipelines or nuclear power plants. However, the existing RBI procedure is limited mainly to process plants, it need to be extended to the other energy plants such as fossil power plants. In this study, a general RBI procedure for optimized PM (preventive maintenance) is proposed for various energy plants.

Suggestion of Logic to Control Power Plant Equipped ESS in case of Full Open Turbine Control Valve (ESS를 이용한 발전소 터빈제어밸브 전개 운전 제어로직 제안)

  • In Young Chung;Jae-Heon Lee
    • Plant Journal
    • /
    • v.18 no.4
    • /
    • pp.66-72
    • /
    • 2023
  • In order to respond to the demand for flexible operation of thermal power generation, development of natural sliding pressure operation that minimizes throttle loss by opening the turbine control valve 100% and maximize power generation efficiency in conjunction with ESS in order to quickly respond to fluctuations in the system frequency is required. The logic development of natural sliding pressure operation with ESS was developed to modify the existing logic at the power plant's top-level control logic such as the unit master, the boiler master and the turbine master. Cooperative control algorithms that complement the advantages and disadvantages of ESS operation (quick response, limited capacity) and power plant operation (slow response, continuous operation) not only improve efficiency when applied to actual power plants, but also respond quickly and flexibly to load demands to ensure system stability.

  • PDF

Analysis on the Energy Balance and Performance Variation of the Power Plant by using the Heavy Residual Oil (중질잔사유 적용시 발전플랜트의 에너지 수지 및 성능 변화 분석)

  • Park, Ho-Young;Kim, Tae-Hyung
    • Journal of Energy Engineering
    • /
    • v.17 no.2
    • /
    • pp.107-115
    • /
    • 2008
  • The numerical analysis of energy and material balance, and plant performance has been carried out when applying the heavy residual oil instead of heavy oil to the existing heavy oil power station. The performance analysis model has been constructed for A heavy oil power station in Korea, and the modeling results were compared with the design data in order to ensure the validity of the model, and further compared with the plant operation data. With the heavy residual oil, the simulation gave 315 MW in power output, which is higher than that of the heavy oil combustion, but the plant efficiency turned out to be lower. The sensitivity analysis of heat rate for the changes in cooling water and ambient temperature, flue gas recirculation and power output has provided valuable information for the optimal operation of the power station.

The Strategy Design of Control Logic for Ultra Super-Critical Power Plant Boiler (초초임계압 발전소 보일러 제어전략 설계)

  • Park, Doo-Yong;Kim, Byung-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2008.04a
    • /
    • pp.223-224
    • /
    • 2008
  • 초초임계압 화력발전 제어계통 설계와 관련하여 보일러 제어시스템의 기본 요건인 제어전략을 구현하기 위해 현재 표준화력 500MW 제어시스템과 제어로직을 기반으로 1000MW급에서 필요로 하는 새로운 구조의 제어에 요구되는 제어전략에 대해 각종 제어 운전 모드의 구성과 각 운전 모드에서의 제어전략을 개발하고 있다. 최신제어시스템에서 중요하게 취급되는 자동 플랜트 제어(Automatic Plant Control, APE)의 각종 제어전략 구성에 중점을 두고 있으며 Unit Master Control, Boiler Master Control, Turbine blaster Control, Throttle Pressure Control, Fuel/Air Master Control, Forced Draft Fan Control, Induced Draft Fan Control, Primary Air Fan, Feed Water Master Control, Super Heater/Reheater Steam Temp Control 등의 제어전략을 논하고, 실제 프로세스 응단특성 파악을 위해 국내 신규발전소를 방문하여 수집한 프로세스 응답시험 결과와 특성을 분석하고 USC에 적용하기위한 보일러 제어전략에 대해 논하고자 한다.

  • PDF

Approximate Optimum Thermal Design Analysis of Combined Cycle Power Plant (복합화력 발전플랜트의 근사 최적 열설계 해석)

  • Jeon, Y.J.;Shin, H.T.;Lee, B.R.;Kim, T.S.;Ro, S.T.
    • Proceedings of the KSME Conference
    • /
    • 2001.11b
    • /
    • pp.782-787
    • /
    • 2001
  • An optimum thermal design analysis of the combined cycle power plant with triple pressure heat recovery steam generator was performed by the numerical simulation. The optimum design module used in the paper is DNCONF, a function of IMSL Library, which is widly known as a method to search for the local optimum. The objective function to be minimized is the cost of total power plant including the steam turbine power enhancement premium. The result of this paper shows that the cost reduces if the design point of power plant becomes the local optimum, and many calculations at various initial conditions should be carried out to get the value near the global optimum.

  • PDF

A Study on Integrated Reliability Analysis for Fossil Power Plant (화력발전 플랜트의 신뢰도 산정기법에 관한 기초연구)

  • Lee, Seung-Chul;Park, Kyung-Bae
    • Proceedings of the KIEE Conference
    • /
    • 1999.11b
    • /
    • pp.178-180
    • /
    • 1999
  • 본 연구는 발전소의 신뢰도 산정을 보다 정확히 하기 위한 기초를 마련하기 위해 수행되었다. 많은 설비들로 구성된 발전소의 전체 신뢰도 계산에 대한 정확한 이론체계가 아직까지 확립되지 않았고 고장의 발생빈도도 적어 신뢰도 분석의 정확도에 한계가 있다. 또한 발전소의 기기수리 및 정기적인 전체정비가 신뢰도에 미치는 영향도 신뢰도 산정시 고려해야한다. 본 연구에서는 전형적인 국내발전소의 실제 고장정지와 수리 데이터에 기초하여 발전소의 고장시간 분포와 수리시간 분포 분석의 예를 보였고 적은 표본수로도 분포 parameter들의 계산이 가능한 Weibull 분포의 적용 가능성을 제시하였다. 또한 고장수리 및 전체정비가 신뢰도에 미치는 영향을 반영하기 위해 stochastic renewal process에 기초한 availability의 적용을 제안하고 그 예를 보였다.

  • PDF

Effect of Biomass Co-firing Ratio on Operating Factors of Pulverizer in 500 MW Coal-fired Power Plant (500 MW 석탄화력 발전소에서 바이오매스 혼소율이 미분기 운전인자에 미치는 영향)

  • Geum, Jun Ho;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.18 no.3
    • /
    • pp.28-40
    • /
    • 2022
  • As the proportion of renewable energy generation is expected to increase, public power generation businesses need to actively consider implementing the expansion of biomass mixing, In this study, the biomass co-firing rate is being changed from 0wt.% to 5.0wt.% at 500MW coal-fired power plant, measuring the major operation characteristics of the pulverizer. First, the composition analysis and grinding characteristics of lignocelluosic biomass were examined, and the effect of volume increase on dirrerential bowl pressure difference, motor current, coal spillage, outlet temperature, and internal fire count was analyzed. As the co-firing rate increased, it was confirmed that the difference in the differential bowl pressure, motor current, and coal spillage treated increased, and the outlet temperature was minimal. The number of internal fires is difficult to find a clear correlation, but it has been confirmed that it is highly likely to occur in combination with other driving factors.

  • PDF