• Title/Summary/Keyword: 통수능

Search Result 184, Processing Time 0.026 seconds

A Study on the Characteristics of Unsaturated Discharge Capacity of Horizontal Drains (수평배수재의 불포화 통수특성 연구)

  • 장연수;박정순;박정용
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.2
    • /
    • pp.15-25
    • /
    • 2003
  • To evaluate the effect of trapped air bubbles in horizontal drains on discharge capacity, unsaturated discharge capacity tests are carried out for four types of drains selected according to the size of section as well as the shape of core. Unsaturated discharge capacities with the elapse of time, the increase of confining pressures, and hydraulic gradients are examined and are compared with saturated discharge capacities. It is found that the unsaturated discharge capacities at a hydraulic gradient of 0.01 decreased by 17%~80% due to the remained air bubbles in the drains compared with the saturated discharge capacities. It is caused by the fact that the horizontal direction of water flow is not consistent with the direction of movement of floating air bubbles in case of horizontal drains. Especially, far the drain with filament shaped core, discharge capacities decreased significantly due to the difficulty in removing air bubbles.

Evaluation of Required Discharge Capacity for Prefabricated Vertical Drains (연직배수재의 소요통수능 평가)

  • 김상규;김현태;공길용
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.1
    • /
    • pp.35-45
    • /
    • 2001
  • Bergado에 의해 비교 분석된 많은 연구자들의 배수재의 소요통수능에 대한 제안값을 보면 0.32~50cc/s로 그 차이가 너무 크기 때문에 실무에 적용하기가 어렵다. 본 연구에서는 배수재의 통수능변화를 고려할 수 있는 압밀해석방법을 개발하고, 흙의 압밀계수, 압축지수, 배수재 타설심도 및 타설후 시간경과에 따른 배수재의 통수능 감소 등의 현장여건을 고려한 압밀해석을 통하여 압밀지연을 일으키지 않는 배수재의 소요통수능에 대한 기준을 제시하였다. 압밀해석결과 어느값 이상의 통수능에서는 압밀지연이 없으므로 이 값 이상의 통수능을 갖는 배수재를 선택하는 것이 중요하며, 압밀지연시간 5% 이내인 배수재의 소요통수능은 압밀계수($c_{v}$ ), 배수재의 길이(L) 및 압축지수($C_{c}$)와 비례관계로서 안전율 1.5를 고려하여 $q_{wa}$ =8$\times$($c_{v}$ $\times$L$\times$$C_{c}$)(cc/s) 이상이면 되는 상관식을 얻었다. 이 값 이상의 배수재를 선택하는 경우는 연직배수공법의 압밀해석에서 배수재의 통수능을 고려하지 않아도 된다는 결론을 얻었다.

  • PDF

A Study of the Conveyance Increasement for Urban River using 1, 2-Dimensional Numerical Model (1, 2차원 수치모형에 의한 도시하천의 통수능 확보 방안에 관한 연구)

  • Baek, Chun-Woo;Park, Moo-Jong;Kim, Seok-Woo;Jo, Deok-Jun;Kim, Joong-Hoon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.3 s.18
    • /
    • pp.73-82
    • /
    • 2005
  • The scheme for the conveyance increasement of urban river is presented in this study. For the use of the lower part of the road paralleled to urban river as a conveyance, the 2-dimensional flood flow between main channel and added conveyance section is analyzed by mathematical model SMS(2-D simulation model). The result of the HEC-RAS(1-D simulation model) is used to calibrate the parameters of SMS. New scheme is applied to the Cheonggeyecheon Restoration Project. The capacity of flood flow between main channel and added conveyance is simulated for 50, 80, 200 year frequency flood and suitable size of pathway is proposed.

Discharge Capacity for Vertical Drain Boards with Hydraulic Gradient Variation (동수경사 변화에 따른 연직배수재의 통수능)

  • Kim, Ju-Hyong;Lee, Kwang-Wu;Cho, Sam-Deok;Chang, Gap-Shik
    • Journal of the Korean Geosynthetics Society
    • /
    • v.9 no.2
    • /
    • pp.11-20
    • /
    • 2010
  • This paper studies the discharge capacity of vertical drain boards that is controlling hydraulic gradient among many factors in the specification. The KS K 0940(2008), a testing method based on the conventional Delft type method for measuring the discharge capacity of a vertical drain, was specified in Korea Standard recently. In this test method, the variation in hydraulic gradient can result in large differences in the discharge capacity for the same vertical drain board.

  • PDF

Evaluation of Drain Capacity in Tunnel Drainage System using Drainboard (바닥배수판을 이용한 터널 배수시스템의 통수능 평가)

  • Bae, Gyu-Jin;Lee, Gyu-Phil;Lee, Sung-Won;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.1
    • /
    • pp.13-20
    • /
    • 2006
  • This study proposes a new concept of a tunnel central drainage system by using a drain board to make a breakthrough on difficulties in the installation of conventional drainage system and draw-down of its drain capacity especially in long tunnels. A fundamental study has been performed for evaluation of the drain capacity of the planar drainage system adopted in this study. In fact, the system proposed makes possible to omit the side, transverse as well as central drainage pipes required in the conventional system, even if its drain capacity and any guideline for design are not available to date. In this circumstance, it is carried out to investigate the correlation between drain capacities and, shapes and posit ions of the columns of the drain board in terms of a variety of water inflows through hydrological model tests. It is shown from the tests that a drain capacity is highly influenced by the shape and the distance between the columns of a drain board in flowing direction, and a round rectangular shape of the columns leads to the highest capacity of drainage. And also, the shorter distance between the columns in flowing direction, the higher drain capacity would be achieved.

  • PDF

A Study on Discharge Capacity of Vertical Drain Considering with In-situ Soil Condition (원지반조건을 고려한 연직배수재의 통수능에 관한 연구)

  • Park, Min-Chul;Kim, Eun-Chul;Lee, Song
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.1
    • /
    • pp.47-56
    • /
    • 2012
  • Discharge capacity of PBD is sensitive in proportion to thickness and ground condition, and drainage of PBD declines due to disturbance effect in surrounding ground by mandrel used for vertical drainage setting and setting machines and type. Also, deviation of discharge capacity gets larger according to ground condition, construction condition and soil properties. But cause and analysis of those problems like reduced discharge of capacity and delayed dissipation of pore water pressure for discharge capacity is lack. Thus, in this text, ground improvement and discharge capacity is investigated by implementing composite discharge capacity test for analysis of an effect factor of PBD discharge capacity with in-situ ground condition. After fixing the vertical drain on a cylindrical cylinder, put churned sample into the cylinder. After in-situ ground and reclamation of ground are dredged, load following the loading step of 30, 70 and 120kPa using a pressure device. Result of the test, The discharge capacity was SM>ML>CL>CL(dredged soil) in situ condition and more fine-grained content, the amount of discharge was greater.

Discharge Capacity of Environmentally Friendly Drains (친환경배수재의 통수능 특성 평가)

  • Cho, Sam-Deok;Kim, Ju-Hyong;Jung, Seung-Yong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.4 no.1
    • /
    • pp.27-36
    • /
    • 2005
  • Discharge capacity of the fiber mat and the fiber drain made with natural fibers abstracted from plant source was evaluated by permeability test for fiber mat and Delft type test and composite discharge capacity test using disturbed clayey soils for fiber drain. The permeability test results for environmentally friendly coconut fiber mat prove that fiber mat has outstanding permeability in substituting permeable sand. However, discharge capacity of fiber drain evaluated by conventional Delft type discharge capacity test was relatively lower than that of plastic drain board. Nevertheless, settlement and pore pressure dissipation behaviors of fiber drain and plastic drain board installed clay soil during the composite discharge capacity test were almost similar to that of plastic drain board. It is found that the natural fiber drain satisfies requiring minimum discharge capacity in substituting the conventional plastic drain board.

  • PDF

Coupled Effectiveness of Dam and River Improvement Project (댐과 하천정비사업의 연계 효과 분석)

  • Lee, Gwang-Man;Lee, Eul-Rae;Lee, Yo-Sang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1616-1620
    • /
    • 2009
  • 댐이 건설된 이후 운영편익은 여러 가지 이유로 원래의 목적이나 목표를 달성하는데 어려운 상황이 발생하게 된다. 실제 대부분의 다목적댐의 경우 홍수기에 댐 하류 하천의 환경변화로 계획된 홍수량을 적절히 방류하지 못하는 사례가 늘고 있으며 이로 인해 유효 저수용량을 충분히 활용하지 못해 이수측면에서도 계획공급량을 충족시키지 못하는 경우가 발생하고 있다. 이는 하천이 댐에서 조절된 홍수량을 안전하게 하류로 배수시키는데 필요한 통수능을 충분히 확보하지 못하고 있기 때문이다. 이의 주요 원인은 댐 하류하천의 침식이나 제방상태가 부실하여 하천이 설계홍수량을 소통시키는데 많은 장애 요인을 갖고 있기 때문이다. 결국 하천의 통수능은 홍수조절과 관련된 댐 운영의 제약조건으로 작용하게 되어 댐 운영측면에서는 큰 손실을 야기하게 된다. 본 연구에서는 기존 다목적댐의 홍수기 운영제약조건으로 작용했던 하류의 통수능 개선을 통한 유효저수용량의 복원에 따른 기대효과를 분석하였다. 이를 통하여 댐의 유효저수용량 확보에 가장 큰 장애요인이라 할 수 있는 댐 직하류에서 계획홍수량의 일정 유량을 피해없이 방류할 수 있는 통수능 개선을 통해 이수목적의 유효저수용량의 회복이 현재의 운영여건에 비해 용수공급과 수력발전으로 대표되는 이수목적의 추가적 편익이 어떻게 발생하는지를 평가하였다.

  • PDF

Computation of floating debris accumulation how to intersect by the bridge piers in stream (하천에서 부유잡목 집적형태에 따른 교각의 여유고 산정)

  • Choi, Gye-Woon;Kim, Joo-Hwan;Han, Man-Shin;Kwon, Young-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1541-1545
    • /
    • 2009
  • 홍수 기간 중 부유잡목에 의한 수위상승 원인은 크게 상류부에서 이송되어진 유송잡물에 의한 교량 등의 수공구조물에 집적으로 인한 통수능 부족에 의하여 발생되는 수위상승과 하천내 수공 구조물의 부적절한 설계 및 시공으로 인한 수위상승으로 구분되어 진다. 현재 교량의 여유고 산정에 사용되는 홍수위는 통수능을 고려하지 않은, 하천정비계획에 사용되는 홍수위를 적용하고 있으며, 다만 통수능의 확보를 위하여 경간장에 대한 제한을 두고 있을 뿐이다. 중소하천에 위치하는 교량의 경우, 여유고 확보에 대한 기준을 적용함에 있어서 교량이 위치한 하천 단면에서의 통수능의 영향이 고려되어야 유수의 월류에 대한 위험성을 줄일 수 있다. 더욱이 하천설계기준(2005)에서는 고정 홍수량에 의한 여유고 산정치를 제안하고 있을 뿐이기 때문에, 하천설계기준에서 교량과 관련된 여유고도 하상변동과 만곡부에 의한 수위 상승, 유송잡물에 의한 통수능 영향, 계산오차 등을 고려하여 충분한 여유고를 확보하도록 보완할 필요가 있다. 본 연구에서는 부유잡목에 의한 수위상승 원인을 분석을 하고, 이에 따른 수리모형실험을 통하여 부유잡목의 높이/폭(H/B)변화에 의한 수위상승, 부유잡목의 형태별 수위상승, 교각사이 개도비에 따른 수위 상승량을 산정하여 기존의 여유고에 대한 추가적인 여유고를 확보하여 홍수시 통수능을 확보하고자 하였다. 부유잡목의 형태에 따른 수위상승량을 산정하기 위하여 개도비를 70%로 고정한 후, Fr수를 변화시켜 부유잡목의 높이/폭(H/B) 형태에 따라 산정한 결과, 부유잡목이 존재하지 않는 상태에 비하여 부유잡목에 의한 영향으로 인한 수위증가율이 Fr값이 클수록 더욱 크게 나타났으며, 부유잡목이 동일면적인 경우 폭(B)에 비하여 높이(H)가 커질수록 수위 상승이 크게 나타났다. 또한, Fr수 변화에 따른 최고수위 상승율을 구하였을 때, 상류조건에서 Fr < 0.5 인 경우는 기존 여유고에 대하여 최대 10%의 여유고를 추가 확보하며, 0.5 < Fr < 1 인 경우는 기존 여유고에 대하여 최대 20%의 여유고를 추가 확보하도록 설계하는 것이 바람직하다.

  • PDF

An Analysis of the Effect of PBD Discharge Capacity to Leave Period (방치기간에 따른 PBD의 통수능 효과 분석)

  • Lee, Keeyong;Park, Minchul;Jeong, Sangguk;Lee, Song
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.10
    • /
    • pp.39-49
    • /
    • 2011
  • Recently PBD method, one of acceleration of consolidation methods is used in the soft ground to shorten consolidation time for fast settlement during construction. It is economical and easy to work. Discharge capacity of PBD is sensitive in proportion to thickness of soft ground layer, and drainage of PBD declines due to disturbance effect in surrounding ground by mandrel used for vertical drainage setting and setting machines and type. Also, deviation of discharge capacity is large according to ground condition, construction condition and soil properties. In addition, when embankment loading is not conducted instantly after PBD setting due to rain or lack of embankment material supply, it causes leaving period problems. But cause and analysis of those problems for discharge capacity is lack. So, in this test, ground improvement and discharge capacity is investigated by implementing composite discharge capacity test for analysis of an effect factor of PBD discharge capacity with leaving period. After fixing the vertical drain on a cylindrical cylinder, put churned sample into the cylinder. Then leave 0day, 30day, 60day and 90day. And then, load following the loading step of 30, 70 and 120kPa using a pressure device. As a result, the longer leaving period, discharge capacity is reduced. It is caused by a decrease of discharge area caused by creep transformation moisture absorption of PBD filter after long leaving period.