• Title/Summary/Keyword: 콘크리트 기둥 발파

Search Result 15, Processing Time 0.021 seconds

Effect of Vertical Load on Fragmentation by Demolition of Model Concrete Pillar (콘크리트 기둥의 발파해체시 파쇄도에 미치는 수직하중의 영향)

  • Kim, Seung-Kon;Park, Hoon;Yang, Hyung-Sik
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.97-109
    • /
    • 2002
  • 본 연구에서는 콘크리트 기둥 발파시 단부 조건을 고려하여 수직 하중에 따른 발파에 의한 파쇄형태를 비교하였다. 또한 파쇄도에 대한 정량적인 해석을 위해 상·하단부의 무게비와 각 방향별 단면의 면적비를 비교하였으며, 장전층을 달리한 모형 구조물 발파해 체시 각 층별 기둥의 파쇄형태와 방향별 면적비를 비교하여, 전체적인 구조물의 파쇄도를 비교하였다.

Analysis of Correlativity with the Number of Blasting Holes Due to Exposed Length of Steel Bars and Vertical Load on Scaled Reinforced Concrete Columns (축소모형 철근콘크리트 기둥에서 철근의 노출길이와 수직하중에 따른 발파공수와의 상관성 분석)

  • Park, Hoon;Yoo, Ji-Wan;Lee, Hee-Gwang;Song, Jung-Un;Kim, Sung-Kon
    • Explosives and Blasting
    • /
    • v.25 no.2
    • /
    • pp.1-10
    • /
    • 2007
  • In this paper, the 1/5 scale models of the reinforced concrete colunms were designed and fabricated. The influence of the number of blasting holes on the exposed length of steel bars and vertical load was investigated. The relation between the length of steel bar and the number of blasting holes was examined by performing the blast tests considering the vertical load on the scaled reinforced concrete columns. Weight of scaled column models by blasting and that of exposed was compared with the number of blasting holes. Finally, based on the exposed length of steel bars and vertical load, the number of blasting holes were calculated. Results shows that the number of blasting holes calculated in this study are suitable for scaled structure models test by blasting demolition.

Fracture formation and fracture Volume on Vertical Load by Blasting Demolition of Model Reinforced Concrete Pillars (철근 콘크리트 기둥 발파시 수직하중에 따른 파쇄형태 및 파쇄체적)

  • Park Hoon;Song Jung-Un;Kim Seung-Kon
    • Explosives and Blasting
    • /
    • v.23 no.2
    • /
    • pp.45-56
    • /
    • 2005
  • In this study, fracture formation and fracture volume by blasting demolition of model reinforced concrete pillars were compared with various vertical load and influence of reinforced steel bar. The more vertical load increased, the more tensile cracks and vertical direction cracks produced. In vertical load of 2.0ton, tensile cracks on vertical direction were predominantly produced. Generally, the more vertical load increased, the more bending deformation of concrete steel bar decreased. As a result, vertical load was influenced fracture formation of concrete and bending deformation of reinforced steel bar. Reinforced steel bar was influenced fracture volume of concrete. According to vertical load and influence of reinforce steel bar by blasting demolition of reinforced concrete pillars, drilling and blasting pattern may be modified.

Blast Modeling of Concrete Column Using PFC (PFC를 이용한 콘크리트기둥의 발파모델링)

  • Choi Byung-Hee;Yang Hyung-Sik;Ryu Chang-Ha
    • Explosives and Blasting
    • /
    • v.23 no.1
    • /
    • pp.47-54
    • /
    • 2005
  • An explosion modeling technique was developed by using the spherical discrete element code, $PFC^{3D}$, which can be used to model the dynamic stress wave propagation phenomenon. The modeling technique is simply based on an idea that the explosion pressure should be applied to a $PFC^{3D}$ particle assembly not in the form of an external force (body force), but in the form of a contact force (surface force). A test blast was conducted for a RC column, whose dimension was $600\times300\times1800$ in millimeters. The initial velocities of the surface movements were measured to be in the range of $14\~18\;m/s$ with the initiation times of $1.5\~2.0m$. Then the blasting procedure was simulated by using the modeling technique. The particle assembly representing the concrete was made of cement mortar and coarse aggregates, whose mirco-properties were obtained from the calibration processes. As a result, the modeling technique developed in this study made it possible for the burden to move with the velocity of $17\~24\;m/s$, which are slightly higher values compared to those of the test blast.

Propagation Characteristics of Blast Vibration Caused by Different Loading Conditions in the Concrete Column (장약공 상태에 따른 콘크리트 기둥의 진동 전파 특성)

  • Noh, You-Song;Kim, Jung-Kyu;Ko, Young-Hun;Shin, Myeong-Jin;Yang, Hyung-Sik
    • Explosives and Blasting
    • /
    • v.32 no.2
    • /
    • pp.9-15
    • /
    • 2014
  • A number of concrete columns were blasted using TNT to study the propagation characteristics of ground vibration caused by different loading conditions in the blast hole of the columns. For each loading condition, peak particle velocity measured on the ground was analyzed. The regression analysis revealed that the use of square blast hole results in smaller vibration magnitude and faster decaying time than the case with circular blast hole. The analysis also showed that the blasting in the closed hole leads to larger vibration magnitude than the blasting in the hole penetrating the column, whereas the difference in vibration decaying time is negligible.

Development of Protection Techniques for Explosive Demolition of RC Pillar (철근콘크리트 기둥 발파해체를 위한 방호기술 연구)

  • Chang Ha Ryu;Byung Hee Choi;Yang Kyun Kim
    • Explosives and Blasting
    • /
    • v.20 no.4
    • /
    • pp.17-28
    • /
    • 2002
  • Safety concern is one of the most important parameters in the design of building demolition by explosive blasting, Accidents were sometimes reported due to the flying chips of fragmented materials In building demolition work in urban area. Laboratory experiments were performed to investigate the failure behavior of reinforced concrete pillars under blast loading and to develop an effective protection technique. Sixteen reinforced concrete pillars were constructed. The failure behavior and the flying chip velocities were observed by means of a high-speed camera. Protection scheme was designed and the effects of several protection materials were investigated. Two kinds of non-woven fabrics and wire net were tested as protection materials. The results showed that reinforcing bar was one of the important factors to determine specific charges, and that mesh size of wire net and tied-up method affected the protection of flying chips. Control of gas effects is also a key to the control of flying chips. It was recommended to use both wire net and non-woven fabrics as primary and secondary protection materials. Such protection scheme was successfully applied to the explosive demolition of apartment buildings.

A Case Study on Partial Explosive Demolition of a Large-Section Turbine Foundation Structure (대단면 터빈 기초 구조물의 부분발파해체 시공사례)

  • Park, Hoon;Suk, Chul-Gi;Nam, Sung-Woo;Noh, You-Song
    • Explosives and Blasting
    • /
    • v.34 no.1
    • /
    • pp.19-28
    • /
    • 2016
  • The number of industrial structures that must be demolished due to functional and structural deterioration has been increased. There is an increasing application of explosive demolition or explosive demolition combined with mechanical demolition to minimize temporal and spatial environmental hazardous factors created during the process of demolition. In this case study, to demolish the turbine foundation structure, which is a large-section reinforced concrete structure, the parital explosive demolition thchnique was conducted. As a result of the partial explosive demolition, the overall crushing of the blasting sections of beam-column joints structure with haunched beams and second-floor columns about the turbine foundation was satifactory, and the explosive demolition was completed without causing any damage to surrounding facilities.

철근콘크리트 기둥폭파 및 방호재료 특성에 대한 실험적 연구

  • 류창하;최수일;박용원;김양균
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1996.03a
    • /
    • pp.95-106
    • /
    • 1996
  • 건물발파해체 설계 및 시공에 있어서 중요한 공정의 하나는 불안정성을 유도하도록 실시하는 건물의 주요 지지부 기둥에 대한 발파이다. 이와 관련된 요소기술로는 기둥단면에 따라 천공패턴을 결정하고 적정장약량을 산정하는 것과 폭파시 파괴된 파편의 비산에 대한 방호기술을 들 수 있다. 비산은 인접건물에 대한 피해와 인명사고들을 유발할 수 있으므로 사전에 철저한 대책이 강구되어야 할 대상이다. (중략)

  • PDF

Execution Case Study on the Explosive Demolition of a Large-Section RC Special Structure (대단면 철근콘크리트 특수구조물 발파해체 시공 사례)

  • Park, Hoon;Suk, Chul-Gi
    • Tunnel and Underground Space
    • /
    • v.19 no.5
    • /
    • pp.397-406
    • /
    • 2009
  • Recently, the number of industrial structures that must be demolished due to structural deterioration and unsatisfactory functional conditions has been increased. To minimize environmental hazardous factors created during the process of demolition, the explosive demolition method has been applied increasingly. This execution case was intended to describe an application of the explosive demolition method to the demolition of a Crusher & Screen structure, which was a large-section reinforced concrete special structure. It was deemed necessary due to its structural deterioration and unsatisfactory functional condition. Various pre-weakening processes and blasting patterns were applied to the large-section reinforced concrete members, and to reduce blasting vibration and impact vibration, time intervals were established for blasting in the same column and for blasting between blasting blocks. By applying the explosive demolition method to the demolition of a large-section reinforced concrete special structure, the explosive demolition was completed safely and efficiently, without causing any damage to surrounding facilities.

Explosive Demolition of Special Structure of Soongeui Complex Stadium (숭의종합운동장 특수구조물 발파해체)

  • Suk, Chul-Gi;Park, Hoon;Kim, Nae-Hoi;Song, Young-Suk;Jung, Woo-Jin;Han, Dong-Hun
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.108-118
    • /
    • 2010
  • Soongeui complex stadium is a reinforced concrete frame structure composed of columns, slabs and beams. The stadium, however, is also a special structure because it has a tall tower of electronic display board and slabs inside its own structure which is different from the structures that had been demolished using blasting by then. Explosive demolition for the stadium was carried out from the left-hand side of the outfield stand to the right considering 2 rows of columns supporting the stand as a blasting unit. An overturning demolition method was applied to the tower of electronic display board. Water bags that played the role of multipurpose protection were applied to control the dust. As a result, the demolition project of the special structure of Soongeui complex stadium was judged to be a great success.