• 제목/요약/키워드: 시공 생산성

검색결과 464건 처리시간 0.022초

철골 공장가공의 생산성 및 공장간접비율 실태분석 (Analysis of the Productivity and Indirect Cost Rates Estimation in the Steel Plant)

  • 김경원;안방률;태용호;허영기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.333-336
    • /
    • 2012
  • In modern Construction Industry, as accumulation of capital and improvement of technology skills, buildings are becoming higher and more enormous, also the portion of steel works has been increasing. In addition, it is necessary to predict the optimum level of construction cost in a reasonable way. The composition of construction is direct construction cost, indirect construction cost and so on. However, it is not enough to study about indirect construction cost rather than direct construction cost. In this study, the state of productivity and indirect construction cost are analyzed in the steel production. As a result, the productivity and ratio of indirect cost in steel plant by inserted per 1ton are suggested.

  • PDF

거푸집 공사의 생산성 측정에 관한 연구 (A Study on the Measure of Productivity of Form Work)

  • 정희경;윤여완;양극영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 추계 학술논문 발표대회
    • /
    • pp.149-155
    • /
    • 2005
  • Lately Construction industry depressed by hard construction market condition. So Construction company, especial at this time, make more rationalize the management of inside Company and Construction field. So in this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

  • PDF

건설 프로젝트 생산성 정보 플랫폼 구축방안 기초연구 (A preliminary study of the construction project productivity data platform development)

  • 강고운;이규;이교선
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.296-297
    • /
    • 2018
  • Due to the decrease in infrastructure investment and stagnation of overseas construction, it is concerned the instability of the construction market. Enhancing the Korean construction competitiveness, productivity improvement could be the breakthrough. In addition, defining construction contents utilizing virtual reality technology is drawing attention along with the trend of the fourth industrial revolution technology development toward the labor productivity improvement. This study conducted a survey to figure out the present state of the productivity management in field and comprehend the factors influence on construction productivity for further Korean construction productivity data platform.

  • PDF

건설현장 디지털 펜 활용 생산성 측정 시스템 구축 (Digital Pen System for Measuring the Productivity at Construction Site)

  • 조예림;김태용;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.74-75
    • /
    • 2016
  • The success of the domestic construction project is mostly judged by process and costs. It can raise the accuracy of the process and costs through productivity measurement and management. System which can increase the productivity and efficiency is required at this moment. The purpose of this study is to introduce the case of measuring productivity system using the Digital Pen System. To utilize Digital Pen System can raise construction productivity. This system is expected to more efficient to accumulation and utilization of construction site information.

  • PDF

모듈러주택 조립용공구의 생산성 및 품질향상 효과분석 (Effectiveness Analysis for Productivity and Quality of Assembly Tools for Modular Housing)

  • 김태영;김석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.243-244
    • /
    • 2016
  • The assembly of the modular housing is an important phase in the construction of pre-fabricated houses. However, the assembly tools that are commonly used in a work site have a disadvantage of decreasing the productivity and the quality. We have developed a exclusive tool for assembling modular parts. The structural stability of the developed tool has been verified in the previous studies. However, the experimental analysis was not conducted. This study analyzed the effect of improving the productivity and quality of the developed assembly tool. The result of the experimental analysis shows improvements in productivity and quality compared to the conventional assembly tool.

  • PDF

외국인 근로자의 심리적 생산성 요인 분석 (The Analysis of the Psychological Productivity Factors of Construction Foreign Laborers)

  • 양기남;신대웅;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.200-201
    • /
    • 2015
  • As manpower shortage of national construction site is continuing, a manpower of foreign laborers are steadily increasing. The construction industry impacts the purpose for productivity of laborers as labor-intensive industry against different industry. Therefore, there is a need of analysis of foreign laborer's productivity. This study analyzes to use foreign labor's psychological productivity factors as a basic standard by comparing to Korean's. Construction foreign laborers seem to put bigger priority on "accomplishment of task," and "job satisfaction," than Korean workers, according to the response results in Likert 5-point Scale Measurement with 11 kinds of psychological causes in theories regarding productivity factors. Thus, this study expects to use as baseline data for productivity management of construction foreign laborers.

  • PDF

공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발 (Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects)

  • 강동완;문현석;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

특수 플랜트 형틀공종의 생산성 및 영향요인 분석 (Analysis of the Productivity and Influence Factor for Special-Plant Formwork)

  • 허영기;임진호;오재훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.90-91
    • /
    • 2013
  • In the field of nuclear power construction, management and the systematic construction is very necessary. For more efficiently managing, analysis of influence factors and productivity is indispensable now. On this research, we collected the data from the nuclear power plant which is located in Korea. We analyzed the productivity and influence factors. As a result, productivity was 0.75(㎡/man·hour).On one hand, the productivity should be personnel, weather and whether there is a night duty or not. On the other hand, work crew depends upon operators, formwork amount, the presence or absence of night duty.

  • PDF

PC공사의 생산성 분석 및 향상방안에 관한 연구 (A Study of Analysis and Improvement Measures for Productivity in PC Project)

  • 신원상;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.96-97
    • /
    • 2013
  • PC(Precast Concrete) technology has been widely used for reduction of construction period and manpower in domestic construction industry since it was introduced from advanced countries in the 1960s. But most of existing researches are shortage of research which proves the efficiency of PC methods quantitatively. Therefore, this study analyzed productivity targeting construction site workers who are working on projects using the PCF(Precast Concrete Frame) system out of PC methods that is used most typically in construction sites, and in order to provide basic data to prove the efficiency of PC project quantitatively.

  • PDF

공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측 (Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction)

  • 김현미;김태형;신영근;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF