• Title/Summary/Keyword: 시공시스템

Search Result 1,771, Processing Time 0.035 seconds

Evaluation of Rock Damage Zone Using Seismic Logging Method (탄성파 점층법을 이용한 암반손상대 평가)

  • Kang Seong-Seung;Hirata Atsuo;Obara Yuzo;Haraguchi Naoyuki
    • Tunnel and Underground Space
    • /
    • v.16 no.1 s.60
    • /
    • pp.50-57
    • /
    • 2006
  • Development of structures such as slope and tunnel, waste disposal, oil and LPG storages, and underground power house and so on, is increasing with the year. The method for appropriate estimation of rock state such as fresh or damaged rocks is also requested with increasing structural development. On these purposes, seismic logging system, which is a simple and easy way for handling as well as small and light, has been developed. Seismic logging method is one of logging tests, which is able to evaluate the state of rock mass with various shapes and is possible to obtain the relatively accuracy data at situ state. In addition, seismic logging method is at to apply to estimate structural behavior, before and after support installed. According to the results obtained from this study, firstly, it is clear that the extent of damage in rock slope due to blasting is able to be evaluated with quantity using seismic logging method, moreover to decide the damage zone in rock slope reasonably. Secondly, it is expected that installing depth of support is able to be decided more effectively and economically, using the results of seismic logging data. Finally, seismic logging method is also able to be applied safety supervision of structures, before and after support installed.

A Study on Signal Control Algorithms using Internal Metering for an Oversaturated Network (내부 미터링을 이용한 과포화 네트워크 신호제어 알고리즘 연구)

  • Song, Myeong-Gyun;Lee, Yeong-In
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.6
    • /
    • pp.185-196
    • /
    • 2007
  • The aim of this research is to develop a signal control algorithm using internal metering to minimize total delay that vehicles go through, in case a network is oversaturated. To calculate total delay on the network, the authors first detect vehicles' arrivals and departures in the network through the detecting system, and chase the vehicles' flow in the links with a platoon dispersion model. Following these, the authors calculate the queue length in all the inks of the network through the chase of vehicles, deduce the stopped time delay, and finally convert the stopped time delay to the approach delay with a time-space diagram. Based on this calculated delay, an algorithm that calculates the level of the internal metering necessary to minimize the deduced approach delay is suggested. To verify effectiveness of this suggested algorithm, the authors also conduct simulation with the micro-simulator VISSIM. The result of the simulation shows that the average delay per vehicle is 82.3 sec/veh and this delay is lower than COSMOS (89.9sec/veh) and TOD (99.1sec/veh). It is concluded that this new signal control algorithm suggested in this paper is more effective in controlling an oversaturated network.

Automatic Fire Extinguisher Having Flammable Pipes Inserted in a Cultural Assets Roof (가연성 파이프 시공에 의한 전통가옥지붕에 매설된 자동소화장치)

  • Cho, Taejun;Kim, Jae-Jun
    • The magazine of the Korean Society for Advanced Composite Structures
    • /
    • v.5 no.2
    • /
    • pp.26-31
    • /
    • 2014
  • This invention is purposed to provide an innovative solution for the inside of roof structures, which is cultural assets. The Asian old houses generally have several layered roofs on top of the structures. If a fire has started inside of the roof, it is hard to be extinguished before eliminating all the upper layers of the roof. This invention provides pre constructed embedded pipes, which is flammable and easy to be dissolved by the fire. The material of pipe is composed of rubbers, of which the combustion point is so low that the extinguishing of initial fire is possible without additional fire service. The inside of pipe is filled with halon gas. If the filled gas is consumed after ignited by fire, additional fire extinguishing water is supplied. If the flexible pipes are totally combusted by a big fire, the sprinkler at the end of inflexible pipe will work continuously, which is located between flexible and inflexible pipes. The extinguishing pipe network is suggested as dividing whole roof as multiple sections for a swift fire extinguishing in case of intentional or natural fire attack to our invaluable cultural assets.

  • PDF

The Development of Design Knowledge Management System Using Data Mining (Data Mining 기법을 활용한 디자인 지식경영 시스템 구축)

  • 양종열;오민권;최경은
    • Archives of design research
    • /
    • v.16 no.2
    • /
    • pp.281-290
    • /
    • 2003
  • In the knowledge and information-based age of today, it would be fair to say that the compatibility of each person, enterprise, and nation can be evaluated by how each of them manages and maintains the knowledge created from data and information. Since the importance and necessity of knowledge management has been acknowledged, there have been studies to create, apply, and evaluate the knowledge concerning design. Previous studies done on this subject can be divided into three main categories - CRM, online statistical research, and eCRM - according to the materials used to create knowledge. These studies are meaningful in that they can create knowledge in their respective fields, although they are somewhat inadequate because the designers can't create as much knowledge as can be applied in business; design-related consumers demand composite knowledge integrating the characteristics of all three fields. In other words, they want to know the ordinary customers'preferences in the previous off-line market in the CRM field, the research results of statistical questionnaires to the various elements of design in statistical research fields, and even the pattern of preference and consumption of many and unspecified persons transcending the time and place in eCRU field. This study proposes to solve the problem related with web-based design knowledge maintenance through the synthetic application of CRM, Statistical Research, and eCRM The information proposed in the solution can De expected to help designers working at design-related enterprises, as well as research institutes, to develop the knowledge necessary to design more consumer-oriented products.

  • PDF

A Study for BIM based Evaluation and Process for Architectural Design Competition -Case Study of Domestic and International BIM-based Competition (BIM기반의 건축설계경기 평가 및 절차에 관한 연구 -국내외 BIM기반 건축설계경기 사례를 기반으로-)

  • Park, Seung-Hwa;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.2
    • /
    • pp.23-30
    • /
    • 2017
  • In the AEC(Architecture, Engineering and Construction) industry, BIM(Building Information Modeling) technology not only helps design intent efficiently, but also realizes an object-oriented design including building's life cycle information. Thus it can manage all data created in each building stage and the roles of BIM are greatly expanded. Contractors and designers have been trying to adopt BIM to design competitions and validate it for the best result in various aspects. Via the computational simulation which differs from the existing process, effective evaluation can be done. For this process, a modeling guideline for each kind of BIM tool and a validation system for the confidential assessment are required. This paper explains a new process about design evaluation methods and process using BIM technologies which follow the new paradigm in construction industry through complement points by an example of a competition activity of the Korea Power Exchange(KPX) headquarter office. In conclusion, this paper provides a basic data input guideline based on open BIM for automatic assessment and interoperability between different BIM systems and suggests a practical usage of the rule-based Model Checker.

Application Method of Remote Site Monitoring in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6550-6557
    • /
    • 2013
  • The public road construction projects awarded by the regional construction and management office, which is an affiliate of the Ministry of Land, Infrastructure and Transport, are managed by construction supervision officers. These officials frequently visit a large number of construction sites to conduct inspections and supervision tasks. Therefore, the site management efficiency is essential in terms of the time and money spent in travelling to the sites. The introduction of a site monitoring management system is considered necessary to minimize the number of site visits and enable remote monitoring of the construction progress to enhance the business efficiency of the construction supervision officers. In this study, a remote site monitoring system was constructed using web cameras for public road construction works. The trial applications were implemented by selecting ten constructions sites. The effectiveness of the system was analyzed to assess its applicability. In an assessment of the applicability of the verification results, remote site monitoring showed cost savings of approximately 35% compared to the existing site management. The guidelines for applying the site monitoring management system were provided, the introduction plan was investigated, and the improvement method was presented. The results showed that the system is likely to minimize the unnecessary site visits, remove the risk factors at vulnerable areas in the sites beforehand, and prevent a range of disasters and accidents. In addition, the quality of the infrastructures is likely to improve through the prevention of accidents and the elimination of substandard and faulty construction work.

Evaluation of Buckling Load and Specified Compression Strength of Welded Built-up H-section Compression Members with Residual Stresses (잔류응력의 영향을 고려한 조립 H-형강 부재의 좌굴하중 및 설계압축강도 평가)

  • Lee, Soo-Keuon;Yang, Jae-Guen;Kang, Ji-Seok
    • Journal of Korean Society of Steel Construction
    • /
    • v.29 no.1
    • /
    • pp.81-88
    • /
    • 2017
  • Residual stress is defined as stress that already exists on a structural member from the effects of welding and plastic deformation before the application of loading. Due to such residual stress, welded H-section compression members under centroidal compression load can undergo buckling and failure for strength values smaller than the predicted buckling load and specified compressive strength. Therefore, this study was carried out to evaluate the effect of residual stress from welding on the determination of the buckling load and specified compressive strength of the H-section compression member according to the column length variation. A three-dimensional nonlinear finite element analysis was performed for the H-section compression member where the welded joint was fillet welded by applying heat inputs of 3.1kJ/mm and 3.6kJ/mm using the SAW welding method.

Analytical and Experimental Study of an Unstiffened Extended End-Plate Connection (반복하중을 받는 비보강 확장 단부판 접합부의 해석 및 실험적 연구)

  • Kim, Hee Dong;Yang, Jae Guen;Pae, Da Sol
    • Journal of Korean Society of Steel Construction
    • /
    • v.28 no.6
    • /
    • pp.439-448
    • /
    • 2016
  • Extended end-plate connections(EEPC) are a type of connection applied in Pre-Engineered Building structures comprising beam-column connections of steel structures or tapered members. Extended end-plate connections(EEPC) show different behavioral characteristics owing to the influence of plate thickness, gauge distance of high strength bolt, diameter of high strength bolt frame, and the number of high strength bolts. In the USA and Europe, extended end-plate connections(EEPC) are applied in beam-column connections of steel structures in various forms; however, these are not widely applied in structures in Korea.This can be attributed to the fact that the proposal of design strength types for extended end-plate connections(EEPC), proposal of connection specifications, evaluation of seismic performance, and are not being performed appropriately. Therefore, the purpose of this study is to provide basic data for the domestic application of Unstiffened extended endplate connections. To realize this, nonlinear finite element analysis was conducted on a 12-mm thick Unstiffened extended endplate connections.

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

A Study on the Visual Satisfaction of a Panel-type Facade Planting (패널형 입면녹화의 시각적 만족도에 관한 연구)

  • Han, Seung-Ho;Kim, Sun-Hae;Song, Kyu-Seong
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.2
    • /
    • pp.53-59
    • /
    • 2008
  • As cities become more industrial and modern, they become overcrowded and the construction zones increase accordingly. In particular, the demand for panel-type planting methods has gradually increased due to early planting and easy installation. However, studies on panel-type planting have strictly concentrated on the vegetation sub system or irrigation system without any interest in landscape-centered system. Factors of preference will be made through landscape evaluation on the panel-type facade planting. A questionnaire survey was conducted in a location where panel-type facade planting was available. In terms of responses to the facade planting, 'natural (3.80)' was the highest, followed by 'friendly (3.70),' 'comfortable (3.65),' 'beautiful (3.65),' and 'peaceful (3.50).' On the contrary, negative responses such as 'too quiet,' 'simple,' 'heavy,' 'gloomy,' 'dark,' and 'dirty' were also received. It is thought that these responses refer to the poor management of the area. The results of this study will be useful as basic data for the development and distribution of panel-type facade planting.