Kang Seong-Seung;Hirata Atsuo;Obara Yuzo;Haraguchi Naoyuki
Tunnel and Underground Space
/
v.16
no.1
s.60
/
pp.50-57
/
2006
Development of structures such as slope and tunnel, waste disposal, oil and LPG storages, and underground power house and so on, is increasing with the year. The method for appropriate estimation of rock state such as fresh or damaged rocks is also requested with increasing structural development. On these purposes, seismic logging system, which is a simple and easy way for handling as well as small and light, has been developed. Seismic logging method is one of logging tests, which is able to evaluate the state of rock mass with various shapes and is possible to obtain the relatively accuracy data at situ state. In addition, seismic logging method is at to apply to estimate structural behavior, before and after support installed. According to the results obtained from this study, firstly, it is clear that the extent of damage in rock slope due to blasting is able to be evaluated with quantity using seismic logging method, moreover to decide the damage zone in rock slope reasonably. Secondly, it is expected that installing depth of support is able to be decided more effectively and economically, using the results of seismic logging data. Finally, seismic logging method is also able to be applied safety supervision of structures, before and after support installed.
The aim of this research is to develop a signal control algorithm using internal metering to minimize total delay that vehicles go through, in case a network is oversaturated. To calculate total delay on the network, the authors first detect vehicles' arrivals and departures in the network through the detecting system, and chase the vehicles' flow in the links with a platoon dispersion model. Following these, the authors calculate the queue length in all the inks of the network through the chase of vehicles, deduce the stopped time delay, and finally convert the stopped time delay to the approach delay with a time-space diagram. Based on this calculated delay, an algorithm that calculates the level of the internal metering necessary to minimize the deduced approach delay is suggested. To verify effectiveness of this suggested algorithm, the authors also conduct simulation with the micro-simulator VISSIM. The result of the simulation shows that the average delay per vehicle is 82.3 sec/veh and this delay is lower than COSMOS (89.9sec/veh) and TOD (99.1sec/veh). It is concluded that this new signal control algorithm suggested in this paper is more effective in controlling an oversaturated network.
The magazine of the Korean Society for Advanced Composite Structures
/
v.5
no.2
/
pp.26-31
/
2014
This invention is purposed to provide an innovative solution for the inside of roof structures, which is cultural assets. The Asian old houses generally have several layered roofs on top of the structures. If a fire has started inside of the roof, it is hard to be extinguished before eliminating all the upper layers of the roof. This invention provides pre constructed embedded pipes, which is flammable and easy to be dissolved by the fire. The material of pipe is composed of rubbers, of which the combustion point is so low that the extinguishing of initial fire is possible without additional fire service. The inside of pipe is filled with halon gas. If the filled gas is consumed after ignited by fire, additional fire extinguishing water is supplied. If the flexible pipes are totally combusted by a big fire, the sprinkler at the end of inflexible pipe will work continuously, which is located between flexible and inflexible pipes. The extinguishing pipe network is suggested as dividing whole roof as multiple sections for a swift fire extinguishing in case of intentional or natural fire attack to our invaluable cultural assets.
In the knowledge and information-based age of today, it would be fair to say that the compatibility of each person, enterprise, and nation can be evaluated by how each of them manages and maintains the knowledge created from data and information. Since the importance and necessity of knowledge management has been acknowledged, there have been studies to create, apply, and evaluate the knowledge concerning design. Previous studies done on this subject can be divided into three main categories - CRM, online statistical research, and eCRM - according to the materials used to create knowledge. These studies are meaningful in that they can create knowledge in their respective fields, although they are somewhat inadequate because the designers can't create as much knowledge as can be applied in business; design-related consumers demand composite knowledge integrating the characteristics of all three fields. In other words, they want to know the ordinary customers'preferences in the previous off-line market in the CRM field, the research results of statistical questionnaires to the various elements of design in statistical research fields, and even the pattern of preference and consumption of many and unspecified persons transcending the time and place in eCRU field. This study proposes to solve the problem related with web-based design knowledge maintenance through the synthetic application of CRM, Statistical Research, and eCRM The information proposed in the solution can De expected to help designers working at design-related enterprises, as well as research institutes, to develop the knowledge necessary to design more consumer-oriented products.
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.2
/
pp.23-30
/
2017
In the AEC(Architecture, Engineering and Construction) industry, BIM(Building Information Modeling) technology not only helps design intent efficiently, but also realizes an object-oriented design including building's life cycle information. Thus it can manage all data created in each building stage and the roles of BIM are greatly expanded. Contractors and designers have been trying to adopt BIM to design competitions and validate it for the best result in various aspects. Via the computational simulation which differs from the existing process, effective evaluation can be done. For this process, a modeling guideline for each kind of BIM tool and a validation system for the confidential assessment are required. This paper explains a new process about design evaluation methods and process using BIM technologies which follow the new paradigm in construction industry through complement points by an example of a competition activity of the Korea Power Exchange(KPX) headquarter office. In conclusion, this paper provides a basic data input guideline based on open BIM for automatic assessment and interoperability between different BIM systems and suggests a practical usage of the rule-based Model Checker.
Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.12
/
pp.6550-6557
/
2013
The public road construction projects awarded by the regional construction and management office, which is an affiliate of the Ministry of Land, Infrastructure and Transport, are managed by construction supervision officers. These officials frequently visit a large number of construction sites to conduct inspections and supervision tasks. Therefore, the site management efficiency is essential in terms of the time and money spent in travelling to the sites. The introduction of a site monitoring management system is considered necessary to minimize the number of site visits and enable remote monitoring of the construction progress to enhance the business efficiency of the construction supervision officers. In this study, a remote site monitoring system was constructed using web cameras for public road construction works. The trial applications were implemented by selecting ten constructions sites. The effectiveness of the system was analyzed to assess its applicability. In an assessment of the applicability of the verification results, remote site monitoring showed cost savings of approximately 35% compared to the existing site management. The guidelines for applying the site monitoring management system were provided, the introduction plan was investigated, and the improvement method was presented. The results showed that the system is likely to minimize the unnecessary site visits, remove the risk factors at vulnerable areas in the sites beforehand, and prevent a range of disasters and accidents. In addition, the quality of the infrastructures is likely to improve through the prevention of accidents and the elimination of substandard and faulty construction work.
Residual stress is defined as stress that already exists on a structural member from the effects of welding and plastic deformation before the application of loading. Due to such residual stress, welded H-section compression members under centroidal compression load can undergo buckling and failure for strength values smaller than the predicted buckling load and specified compressive strength. Therefore, this study was carried out to evaluate the effect of residual stress from welding on the determination of the buckling load and specified compressive strength of the H-section compression member according to the column length variation. A three-dimensional nonlinear finite element analysis was performed for the H-section compression member where the welded joint was fillet welded by applying heat inputs of 3.1kJ/mm and 3.6kJ/mm using the SAW welding method.
Extended end-plate connections(EEPC) are a type of connection applied in Pre-Engineered Building structures comprising beam-column connections of steel structures or tapered members. Extended end-plate connections(EEPC) show different behavioral characteristics owing to the influence of plate thickness, gauge distance of high strength bolt, diameter of high strength bolt frame, and the number of high strength bolts. In the USA and Europe, extended end-plate connections(EEPC) are applied in beam-column connections of steel structures in various forms; however, these are not widely applied in structures in Korea.This can be attributed to the fact that the proposal of design strength types for extended end-plate connections(EEPC), proposal of connection specifications, evaluation of seismic performance, and are not being performed appropriately. Therefore, the purpose of this study is to provide basic data for the domestic application of Unstiffened extended endplate connections. To realize this, nonlinear finite element analysis was conducted on a 12-mm thick Unstiffened extended endplate connections.
Korean Journal of Construction Engineering and Management
/
v.6
no.4
s.26
/
pp.101-112
/
2005
Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.
Journal of the Korean Institute of Landscape Architecture
/
v.36
no.2
/
pp.53-59
/
2008
As cities become more industrial and modern, they become overcrowded and the construction zones increase accordingly. In particular, the demand for panel-type planting methods has gradually increased due to early planting and easy installation. However, studies on panel-type planting have strictly concentrated on the vegetation sub system or irrigation system without any interest in landscape-centered system. Factors of preference will be made through landscape evaluation on the panel-type facade planting. A questionnaire survey was conducted in a location where panel-type facade planting was available. In terms of responses to the facade planting, 'natural (3.80)' was the highest, followed by 'friendly (3.70),' 'comfortable (3.65),' 'beautiful (3.65),' and 'peaceful (3.50).' On the contrary, negative responses such as 'too quiet,' 'simple,' 'heavy,' 'gloomy,' 'dark,' and 'dirty' were also received. It is thought that these responses refer to the poor management of the area. The results of this study will be useful as basic data for the development and distribution of panel-type facade planting.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.