A Development of Integrated Risk Management Model of Large Construction Projects (건설분야 통합 리스크관리에 관한 구성 모델)

  • Kim Chang-Hak;Park Seo-Young;Kang In-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.101-108
    • /
    • 2004
  • The results of the study include a computerized system and a systematic Process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks In the construction project. The modules for computerizing this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The method logy for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

  • PDF

A Development of Integrated Prototype Model for Risk Management of Construction Projects (건설공사의 리스크관리를 위한 통합전산모형 구축)

  • Kim, Chang-Hak;Park, Seo-Young;Kang, In-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.469-480
    • /
    • 2006
  • The results of the study include a computerized system and a systematic process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks in the construction project. The modules for computerizing in this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The methodology for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

The Development and Application of Schedule Management Tools in Building Construction (건설 공정리스크 관리도구 개발 및 활용방안)

  • Jung Woo-Joon;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.384-387
    • /
    • 2004
  • It is very important to manage the risk in building construction because construction process has too many internal risk compared with others. So construction managers need more developed risk management system than the Present. While the study for the solution and management of generated risk is comparatively enough, the effort to confirm the risk of construction phase on pre-construction phase haying an major effect on total duration, is insufficient. For supporting the schedule risk management of pre-construction, this study suggests the reclassified risk breakdown structure and the investigation form for advance preparations on pre-construction Phase, which help the Poorly experienced construction manager to make more correct decisions and efficiently to execute risk management.

  • PDF

A Study on the Risk Assessment Occurred Possibly in a Civil Project (토목공사에서 발생 가능한 리스크평가에 관한 연구)

  • Yoon, Yong-Kyun
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.59-66
    • /
    • 2011
  • A variety of risks caused by natural, technological and biological hazards threaten a business continuity of an organization. Business continuity is very important issue for all organizations and its proper management may control success and failure of an organization. Business continuity plan (BCP) may be defined as a management process which provides a business continuity. BCP includes risk management, operational continuity plan, response/ recovery, exercise/study and crisis communication, etc. Risk management is a systematic method to identify, analyze, evaluate and treat emergency risks and risk assessment is composed of identifying, analyzing and evaluating emergency risks. Risk assesment is the first step for making BCP. In this study, risk assessment has been conducted for sewer laying project. Through assessing risks, 18 risks that may threaten the construction operation are identified and it is founded to be that high levels of risks which require treatment are 'collapse of excavation surface', 'breakage of ground infra-facilities', 'noise & dust dispersion' and 'rise of material costs'.

A Study on the Risk Analysis Method on the Transport System (운송시스템의 리스크 분석방법에 관한 연구)

  • Kim, Eun-Ji;Kim, Hwan-seong
    • Journal of Navigation and Port Research
    • /
    • v.40 no.3
    • /
    • pp.147-157
    • /
    • 2016
  • The trend of globalization and the development of the communication-Information technology have led the organization of a complex supply chains which are more vulnerable to risks. The impact of risk on the supply chain can be adverse so importance of risk management on a supply chain has increased. In order to analyze the risk factors of transport system, this study described about the definition of transport risk and investigated the relationship between likelihood index and effect index of each risk factor. We identified risk factors on transport system and measured likelihood index and effect index of each risk factor. Finally, a numerical risk index, which is a value of total transport system, has been resulted by aggregating all indices. In addition, a case study using the proposed method has done on a heavy vehicle transport context with a transport company.

Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

Development of Measurement and Evaluation Process for Risk-based Configuration Factors in Mixed Used Development in Urban Regeneration Projects (복합용도 도시재생사업에서의 리스크 기반 변화요인 측정 및 평가 프로세스 개발)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.94-106
    • /
    • 2012
  • In recent years, the risks and uncertainties associated with mixed used development in urban regeneration projects which have actively been implemented at home and abroad have been on the rise due to the uncertainties of the initial business plan, difficulty of financing, increase in total cost and schedule delay. To cope with rapid social and economic changes and optimize benefits, a risk-based configuration management process that considers life cycle is required, along with accurate planning in the early stage of the business. In addition, it is necessary to prepare measures that can respond to the evaluation and measurement of the configuration factors in relation to the business process. However, the focus of previous studies on configuration management in the field of construction was mainly on humanities and the sociological aspects such as organization, leadership, ideology and similar concepts. There has been limited research on the process and measurement and evaluation methods for configuration factors required in decision-making on the risks and changes that can occur in the actual project implementation phase. Accordingly, in this study, we defined risk-based configuration factors and developed a process and MECA/3DAM/CII methodology to measure and evaluate these factors so as to carry out systematic configuration management of mixed used development in urban regeneration projects.

Applying Enterprise Architecture to Enterprise-wide IT Risk Framework (전사적 정보기술 리스크 체계를 위한 엔터프라이즈아키텍처 활용)

  • Park, Jooseok;Koo, Jamyon;Kim, Seung-Hyun;Kim, Eehwan
    • Journal of Information Technology and Architecture
    • /
    • v.10 no.4
    • /
    • pp.451-466
    • /
    • 2013
  • 기업들은 정보기술 리스크(IT Risk)에 대하여 어떻게 대처하고 있을까? 금융기관이나 공공기관은 태생적으로 이미 위험관리를 적극적으로 수행하고 있다. 정보기술에 대한 위험관리도 지난 10년동안 전산망 마비, 해킹 사고, 디도스 공격, 고객정보 유출 등을 겪으면서 적극적으로 대응해 왔다. 특히 2011년 농협사태는 IT 성과보다는 IT 보안을 훨씬 중요하게 보는 계기가 되었다. IT 보안 인력과 예산이 대폭 강화되고 망분리 사업이 추진되는 것이 대표적인 사례이다. 하지만 그동안 IT 위험관리는 특정 기술에 대한 사전 대응 및 사후 대응 강화에 집중되었다. 현재 IT 위험관리는 단편적 관리에서 종합적 관리로 전환되고 있다. 최근에 많은 기업들이 전사 차원의 정보기술 리스크 거버넌스(IT Risk Governance) 체계를 구축하고 있거나 구축하는 계획을 갖고 있다. 하지만 아직도 IT보안은 전사적으로 통합되지 못하였으며, IT 위험관리 프로세스는 조직에 내재화 되지 못 하였고, IT 성과관리와 연계성은 고려하지 못하고 있다. 본 논문에서는 IT 관리와 기술을 효과적으로 연계하기 위하여, 그리고 IT 성과와 IT 위험을 균형되게 관리하기 위하여 엔터프라이즈아키텍처(EA: Enterprise Architecture) 활용을 제안하고자 한다.

Analysis and Quantitative Estimation of Risk Factors of Design-Build (턴키 프로젝트에서 리스크요인 분석 및 정량적 평가)

  • Oh, Guk-Yeol;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.12-24
    • /
    • 2012
  • The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.