A Development of Integrated Risk Management Model of Large Construction Projects
건설분야 통합 리스크관리에 관한 구성 모델
- Published : 2004.11.01
Abstract
The results of the study include a computerized system and a systematic Process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks In the construction project. The modules for computerizing this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The method logy for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.
본 연구에서는 건설공사 리스크관리 현황을 파악하여 현재의 리스크관리 및 분석상의 문제점 및 기초적 개선방안을 파악하였다. 이러한 기초조사에 근거하여 연구에서는 리스크관리 시스템의 총괄적 구성을 리스크관리준비, 리스크확인, 리스크분석, 리스크대응의 4단계로 구분한 바 있으며, 이러한 각 프로세스별 리스크관리를 통합하여 구현할 수 있는 실무적 분석절차를 모형화 및 전산화하였다 전산화를 위한 리스크관리의 단계별모듈은 기획, 시공, WBS 및 RBS의 연계활용, 리스크분석모듈로 구분 구성하며, 리스크분석기법으로 기존의 Fuzzy 기법을 단순화 한 분석방법론을 구성하였다. 모든 시스템구성은 시공자 위주로 구성하며 전산화 작업은 인터넷 기반으로 구성하여 본사
Keywords