• Title/Summary/Keyword: 공정 리스크 통합

Search Result 11, Processing Time 0.03 seconds

A Study on Integration of Schedule Management and Risk Management (공정관리와 리스크관리의 통합을 위한 기초연구)

  • Jang, Myung-Houn;Youn, You-Sang;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.105-110
    • /
    • 2006
  • It is more effective and more efficient to manage schedule and risk at a same time because many risks occur in construction phase in building construction projects. The objective of this paper is to propose a tool that manages risks in a project management software. The tool is implemented by VBA in Microsoft Project, and enables field managers of a construction project to make schedules and to help to predict risks.

  • PDF

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

Module Suggestion to Develop an Integration System of Schedule and Change Control (공정 및 변경관리 통합시스템 개발을 위한 모듈 제안에 관한 연구)

  • So Young-Sung;Oh Seung-Jun;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.393-396
    • /
    • 2002
  • Purpose of this study is to suggest some modules to integrate schedule and change control. The study has been performed through the process of literature review, effect comparison of being not integrated and integrated of the schedule and change control, and finally suggest new integrated modules. The results of this study are as follows: 1) Suggestion of a Predicted Change Information Control Module: This nodule can be used to assess the impact of changes in advance and to prepare counteraction. 2) Suggestion of a Change Information Control Module: This module is used to update current schedule for the realized changes. 3) Suggestion of a Revision History Maintenance Module: This module is used to record schedule and cost revision history and to analyze the overall change trend.

  • PDF

The Process Development and Application of the Contingency Management by the Performance Analysis (성과분석을 통한 건설공사 예비비 관리 프로세스 및 적용)

  • Lee, Man-Hee;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.84-92
    • /
    • 2007
  • To reduce uncertainties and make rational plans, the presumption of contingency against a failure of projects and an occurrence of unpredictable risks is important with accurate estimations as the work progressing. Therefore, if the presumption of contingency reflecting uncertainties carries out at a decision making point of time, be able to prepare for risks. The purpose of this paper is to present a management process of contingency through the performance analysis of project. In the cost planning phase, this study offers a process which is predictable contingency and predicts the range of fluctuation of the cost, laking an advantage of EVM in construction phase. With reflecting the results from this procedure, this study presents a process, rationally manageable contingency.

Data-driven Interactive Planning Methodology for EPC Plant Projects (EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안)

  • Wang, Hankyeom;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.95-104
    • /
    • 2019
  • EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF

Development of a 4D Information based Integrated Management System for Geothermal Power Plant Drilling Project (지열발전 시추프로젝트의 4D 정보화기반 통합관리 시스템 개발)

  • Lee, Seung Soo;Kim, Kwang Yeom;Shin, Hyu-Soung
    • Tunnel and Underground Space
    • /
    • v.24 no.3
    • /
    • pp.234-242
    • /
    • 2014
  • Deep drilling project should be managed systematically and efficiently because it is significantly influenced by various related factors having uncertainty and high risk in terms of economy and effective management. In particular, drilling project involves participants from various sectors including necessary service company and it also needs their collaboration by sharing related information occurring at drilling process in order to secure efficient performance management. We developed 4D (3D + time) information based visualization system for progress management by combining 3D design model and predicted optimized control parameters for each section in geothermal well design. We also applied PDM (precedence diagramming method) to the system in order to setup the effective process model and hooked it up to 3D information based on precedence relation and required time for informatized process network.

Comprehensive Assessment on Risk Factors using Fuzzy Inference in Decommissioning Process (퍼지추론을 이용한 해체공정 중 리스크 요인의 통합 평가)

  • Lim, Hyeon Kyo;Kim, Hyunjung
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.4
    • /
    • pp.184-190
    • /
    • 2014
  • Decommissioning process of nuclear facilities consist of a sequence of problem solving activities, because there may exist not only working environments contaminated by radiological exposure but also industrial hazards such as fire, explosions, toxic materials, and electrical and physical hazards. Therefore, not a few countries in the world have been trying to develop appropriate counter techniques in order to guarantee safety and efficiency of the process. In spite of that, there still exists neither domestic nor international standard. Unfortunately, however, there are few workers who experienced decommissioning operations a lot in the past. As a solution, it is quite necessary to utilize experts' opinions for risk assessment in decommissioning process. As for an individual hazard factor, risk assessment techniques are getting known to industrial workers with advance of safety technology, but the way how to integrate those results is not yet. This paper aimed to find out an appropriate technique to integrate individual risk assessment results from the viewpoint of experts. Thus, on one hand the whole risk assessment activity for decommissioning operations was modeled as a sequence of individual risk assessment steps which can be classified into two activities, decontamination and dismantling, and on the other, a risk assessment structure was introduced. The whole model was inferred with Fuzzy theory and techniques, and a numerical example was appended for comprehension.

The Characteristic of Research Regulation in Recent Japanese Medical World (최근 일본의 의학계 연구규율의 특색)

  • Song, Young-mi
    • The Korean Society of Law and Medicine
    • /
    • v.20 no.2
    • /
    • pp.173-206
    • /
    • 2019
  • This research examines the characteristic of regulation on Japanese clinical research in recent years. First, Japan has had a severe punishment policy on research misconduct like Korea, but, in recent days, Japan has changed the direction of research ethics policy from restriction to research publicness securement by educational training, in addition, Act of Clinical Research, effected April 2018, has recruited excellent researchers, and then integrated clinical research and medicine clinical trial through raising transparency of funding and integrating ethics screening by mandating announcement on funding information of clinical research. Second, Japan has integrated and organized ethics guideline from dual system that consists of ethics guideline on dynamic research(here after, referred to as 「dynamic guideline」) and ethics guideline on clinical research(here after, referred to as 「clinical guideline」) to ethics guideline on medical research aimed at human(here after, referred to as 「integrated guideline」), thus, it complements repetition and deficit of ethics guideline needed in clinical research and dynamic research, and it has risk evaluation system for protecting human subjects, and also it clarifies the concept of 「invasiveness」, a preliminary consideration of evaluation. 「Evaluation issue of risk and profit」, common contents of international regulation related clinical research, is the method to check whether the research is designed appropriately or not, this is the method for Institutional Review Board to decide whether the risk on human subjects could be justified, and also this is the important standard for future human subjects to participate in clinical trial. Therefore, it is meaningful to define 「invasiveness」 concept, a preliminary consideration of risk evaluation for human subjects. This research examines Japanese clinical trial focusing on change of awareness on prevention of research misconduct, efficiency improvement of research through research screening and integration of human subjects, and clarification and extension of range of 「invasiveness」 concept, a preliminary of risk evaluation to protect human subjects.

Opportunity Tree Framework Design For Optimization of Software Development Project Performance (소프트웨어 개발 프로젝트 성능의 최적화를 위한 Opportunity Tree 모델 설계)

  • Song Ki-Won;Lee Kyung-Whan
    • The KIPS Transactions:PartD
    • /
    • v.12D no.3 s.99
    • /
    • pp.417-428
    • /
    • 2005
  • Today, IT organizations perform projects with vision related to marketing and financial profit. The objective of realizing the vision is to improve the project performing ability in terms of QCD. Organizations have made a lot of efforts to achieve this objective through process improvement. Large companies such as IBM, Ford, and GE have made over $80\%$ of success through business process re-engineering using information technology instead of business improvement effect by computers. It is important to collect, analyze and manage the data on performed projects to achieve the objective, but quantitative measurement is difficult as software is invisible and the effect and efficiency caused by process change are not visibly identified. Therefore, it is not easy to extract the strategy of improvement. This paper measures and analyzes the project performance, focusing on organizations' external effectiveness and internal efficiency (Qualify, Delivery, Cycle time, and Waste). Based on the measured project performance scores, an OT (Opportunity Tree) model was designed for optimizing the project performance. The process of design is as follows. First, meta data are derived from projects and analyzed by quantitative GQM(Goal-Question-Metric) questionnaire. Then, the project performance model is designed with the data obtained from the quantitative GQM questionnaire and organization's performance score for each area is calculated. The value is revised by integrating the measured scores by area vision weights from all stakeholders (CEO, middle-class managers, developer, investor, and custom). Through this, routes for improvement are presented and an optimized improvement method is suggested. Existing methods to improve software process have been highly effective in division of processes' but somewhat unsatisfactory in structural function to develop and systemically manage strategies by applying the processes to Projects. The proposed OT model provides a solution to this problem. The OT model is useful to provide an optimal improvement method in line with organization's goals and can reduce risks which may occur in the course of improving process if it is applied with proposed methods. In addition, satisfaction about the improvement strategy can be improved by obtaining input about vision weight from all stakeholders through the qualitative questionnaire and by reflecting it to the calculation. The OT is also useful to optimize the expansion of market and financial performance by controlling the ability of Quality, Delivery, Cycle time, and Waste.