• 제목/요약/키워드: 공공발주자

검색결과 148건 처리시간 0.021초

A Study on the Problem and Improvement of Screening System of Low Price Subcontracting by Analyzing a Standard of Judgement Criteria (원도급자 측면에서의 저가하도급 판정기준의 문제점과 개선방안)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • 제10권6호
    • /
    • pp.107-116
    • /
    • 2009
  • As the Fundamentals of Construction Business Act was revised in December 2004 and its implementing ordinances and enforcement regulations were adjusted in June 2005, the screening system of low price subcontracting has been an obligation to the public owners, having brought about arguments for and against since it enacted in 1983. The statutes for low price subcontracting have been reinforced from this year; for example, it underlines to submit to a project and builds an information network of subcontracting works. The system's original intention was that prevents shoddy and fraudulent constructions caused by low price subcontracting and precludes disturbances of fair trade by screening that whether it satisfies the conditions or not in advance. But, the criterion for the existing low price subcontracting has several issues having held up a true mirror to the real situation. It is arguable to discharge an important task with the primary purpose. This dissertation have researched the problem with a deposit of subcontract and the low price subcontracting basic rate are being used by the criteria for deciding whether it is a low price subcontracting or not, so showing the plan of reformation based on the findings, it wishes to contribute toward making the most of the system's essential intent.

Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information (가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델)

  • Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • 제10권4호
    • /
    • pp.87-100
    • /
    • 2009
  • The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various researches have been attempted to develop cost prediction models in the early stage of a construction project. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the Case-Based Reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.

Object-oriented Road Field BIM Standard Object Classification System Suggest Development Plan (객체지향의 도로분야 BIM 표준객체분류체계 개발방안)

  • Nam, Jeong-Yong;Kim, Min-Jeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제19권3호
    • /
    • pp.119-129
    • /
    • 2018
  • The Ministry of Land, Transport and Maritime Affairs has promulgated the mandatory design of BIM for road projects of more than 50 billion won by 2020 under the Basic Plan for the Sixth Construction Technology Promotion. As a result, major public clients are attempting to implement BIMs that are appropriate to the situation of each institution. On the other hand, it is difficult to design and construct a proper BIM and accumulate BIM information of the ordering organization because the technical guidelines and standard classification system that can perform BIM effectively have not been presented sufficiently. The characteristics of the road should be managed systematically, e.g., atypical objects, such as earthworks, which are constantly changing along a line; large objects, such as bridges and tunnels; and facilities, such as signs and soundproof walls. To achieve this, a multitude of standard systems should be developed and disseminated, but there have been insufficient studies on practical methods. To solve this problem, this study developed a BIM standard object classification system in the road sector to meet the international standard, accommodate a multi-dimensional information system, and provide a more effective BIM standard information environment that can be utilized easily by practitioners.

CM Prospects and Strategies Based on Contract Statistics : 1997 through 2014 (CM산업 수주실적 분석을 통한 CM기업의 발전 방안 - 1997년 ~ 2014년 실적자료 기반 -)

  • Ha, Jiwon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • 제17권5호
    • /
    • pp.97-107
    • /
    • 2016
  • CM services have been focused on the advancement of the CM industry and expansion to overseas market based on CM capabilities. However, there has been lack of quantitative and comprehensive research to investigate current CM trends and prospects for improving competitiveness. In this sense, the purpose of this study is to statistically analyze total of 3,453 CM service contracts over the past 18 years (between 1997 and 2014) in term of market type, contract size, owner's type, commodity type. Finding of this research reveal that 1) compared to 2005, CM market size in 2015 increased as much as 2.5 times, and that 2) domestic CM projects count for 87.5%, architectural project 88.4%, less than 1 billion won small contracts 75%, respectively. Also, recently as CM company are developing capability and competitiveness, 1) overseas CM market share has grown up to 20% among total CM contract amount, and 2) CM contracts by private owners has increased 3 times demanding the total management services based on high technical capability. Additionally, the result of this paper supports the growth path model proposed by Jung et al. (2014), where a path from Domestic Public (DP3) and Domestic Private (DC2) CM projects towards the expansion to International Private (IC5) contracts was quantitatively analyzed. Implications for other practical issues are also briefly discussed.

Policies and Tasks for Improving Korean CM Industry (CM 산업 발전을 위한 정책 및 과제 추진 방안)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Namjoon;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • 제15권5호
    • /
    • pp.71-81
    • /
    • 2014
  • As domestic construction investment has been gradually reduced, the issue of expanding overseas CM market has increased. Strengthening CM capability from the view point of project life-cycle is required in overseas CM market. However, current regulations institutionally force public CM services to focus on the construction phase. Therefore, Korean CM firms can hardly have the opportunities for accumulating technical competitiveness especially for pre-construction phase. Result of this study shows that the total efforts in terms of man-hours for the construction phase is found to be more than 78 percent in domestic public CM projects. In this context, this study proposes the policies and tasks for improving 'rigid man-hour placement', 'unreasonable CM fee standards', 'CM firm selection method', 'unreasonable business scope decision', and 'evaluation of owner's project management capability' in order to improve domestic CM Industry as well as to expand overseas CM market successfully.

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • 제15권5호
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • 제6권1호
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

Development of a Manual for Simulation Training in Preparation for the Fall Disasters of Urban Residential Housing Construction Works and Apply (도시형 생활주택신축공사의 추락재해 발생대비 모의훈련 실시 매뉴얼 개발 및 적용)

  • Kim, Sung Soo
    • Journal of Korean Society of Disaster and Security
    • /
    • 제14권3호
    • /
    • pp.39-49
    • /
    • 2021
  • According to the recent "Status of Industrial Accidents at the End of December 2020" released by the Ministry of Employment and Labor, each industry is subject to industrial accidents. The number of accident deaths by construction industry, accident deaths by accident type fell, and accident deaths by workplace size were 5 to 49, indicating that most accident deaths occurred due to falling accidents at small construction sites. Therefore, urban living houses are small construction sites, and the probability of falling accidents is very high. Fall simulation training for disaster occurrence is conducted mainly by large construction ordering organizations in the public sector, and it is the first case in Korea that a housing construction company has conducted at a small construction site. This study analyzed and presented the definition, construction characteristics, and safety management status of urban living houses, and developed and spread an emergency relief procedure manual in the event of a fall accident to minimize deaths.

Strategy Planning for the Development of the Facility-Based Lifecycle Integrated Project Information Portal (시설물 기반 생애주기 통합 건설정보 체계 구축 전략 연구)

  • Kim, Sung-Il;Cho, Jung-Hee;Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • 제19권9호
    • /
    • pp.26-36
    • /
    • 2019
  • Since more than 30 different information systems are collecting and providing construction related information, it is difficult for information users to figure out where and how to acquire the required information. Even if the user find the information, it is hard to meet users demand. Because the current systems accumulate the data just as administrative data and can do not connect the information from the different phases of the lifecycle for the specific facility. The information collected and managed in different information systems should be integrated in terms of lifecycle of the facility to improve money for value of public investment, the quality of life by improving quality of the facility and to provide the foundation for big data utilization in the construction industry. This paper suggested strategic planning for the development of the (assumed name) "The Lifecycle Integrated Construction Information Portal" as a foundation to use the data in construction industry, by investigating prerequisites and suggesting conceptual framework of the system.

SI Project Success and Failure in Korea thru Standish CHAOS Report (Standish CHAOS Report로 본 한국 SI Project의 성공과 실패에 관한 분석 연구)

  • Yoon, Hyeong-Seok;Lee, Seouk-Joo;Lee, Dong-Hyun;Kim, Neung-Hoe;In, Hoh Peter
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 한국정보처리학회 2009년도 추계학술발표대회
    • /
    • pp.827-828
    • /
    • 2009
  • 매년 국내 많은 기업 및 공공기관에서 정보시스템 관련 프로젝트를 수행하고 그 결과는 성공이라고 발표되고 있으나, 2009년 Standish 보고서에서 성공 32%, 도전 44%, 실패 24%이라고 발표되었다.[1] 프로젝트를 수행하는 업체나 발주 업체는 그 성패에 따라서 기업의 운명이 달라진다. 본 연구에서는 실제 공급자(개발업체)가 수행한 프로젝트 사례(A사 282건)를 Standish CHAOS 보고서에 명시된 성패 기준으로 하여 조사 및 통계 분석한 결과는 Standish 보고서에 비교해서 실패 11%( A사 실패 35%) 높게 나왔다. 그 이유는 프로젝트에 대한 관리 프로세스 미정착되어 있으며, PM의 역량에 의해서 좌우 되어진다. 따라서 실패율을 낮추기 위한 지속적인 프로젝트 관리 프로세스가 필요하다. 본 연구의 목적은 국내 IT환경에 개발업체에서 수행한 프로젝트 성공과 실패에 관한 연구로서 (1)기존 문헌을 통하여 프로젝트의 성패에 대한 기준을 정립하고, (2)이를 Standish와 비교하고, (3) 프로젝트 계획 및 관리 프로세스의 중요성을 인식하여 성공을 높이는데 기여하고자 한다.