• Title/Summary/Keyword: 건설사업관리 적용

Search Result 582, Processing Time 0.026 seconds

Interface Management Practices for Minimizing Design Change - Focusing on the Case Study - (설계간섭 최소화를 위한 인터페이스 관리방안 - 사례현장 적용 내용을 중심으로 -)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.22-29
    • /
    • 2013
  • As construction projects are getting larger, more complex and specialized, the size and scale of the structures are increasing and large-scale projects with multiple participants involved have continuously been ordered. Due to the nature of a large-scale construction project, when there are interferences and conflicts in process, schedule and area among project participants, the project requires more time and efforts to resolve the issues as it progresses further. This study suggests the interface management model that is time-saving and physically beneficial in solving interface issues based on case study. This study provides a practical management model including the organization of interface consultative group, checklist preparation, LIST management and PMIS application, which will be useful for the construction sites seeking effective know-how to manage design interferences and changes.

A Study on the status and improvement of construction management in Susung Culture & Art Center (수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Park, Byung-Hak;Yoo, Byung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.45-52
    • /
    • 2006
  • Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

  • PDF

A study on Unification Plan of Construction Information Systems in Social Overhead Capital fields -the subject for Business Process of the first stage of Project Management- (SOC분야의 건설정보시스템 통합 방안 연구 -건설사업관리 초기단계 업무 대상-)

  • Kim, SeongJin;Kim, NamGon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1689-1690
    • /
    • 2012
  • 본 연구는 국토해양부의 도로 하천 항만건설분야에 적용중인 건설정보시스템(건설사업관리시스템 항만건설통합정보시스템) 간에 차이점을 파악하고, 공사계약이 체결된 이후인 사업관리 초기단계에서 건설 정보시스템을 이용한 사용자등록, 사업 공사등록 및 공사 대장 작성 보고 업무를 대상으로 시스템간 통합 방안을 마련하고자 한다.

Risk based Value Index Evaluation Model for Modular Design Alternatives in Plant Construction Projects (플랜트 건설사업의 모듈러 설계대안별 RVI 평가 모델)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.98-107
    • /
    • 2022
  • The purpose of this study is to suggest a model for evaluation of a risk based value index for modular design alternatives in plant construction projects. Accordingly, 1) Setting the basic project cost and the scope to apply the module, 2) Evaluating the importance, easiness, and effectiveness index for Engineering, Procurement, Fabrication, transportation, and construction work, 3) Estimating the total project cost by analyzing the risk reserve Step, 4) Comparing the effectiveness index and total project cost for each modular design alternative, it was composed of the steps of deriving RVI. To verify such a model, Plan-A, which applied a module to one process, and Plan-B, which applied a module to three processes, were composed to evaluate RVI.

Research on the Application of GIS-based Measures in the Advancement of the Construction Project Information System (건설사업정보시스템의 고도화를 위한 공간정보(GIS) 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Smart Media Journal
    • /
    • v.4 no.4
    • /
    • pp.70-79
    • /
    • 2015
  • The Construction Project Information System(CPIS), an information system constructed as part of the Construction Continuous Acquisition & Life-cycle Support(CALS) of the Ministry of Land, Infrastructure, and Transport(MOLIT), is designed to digitize construction projects across all stages, and enable sharing of information so as to enhance the productivity and efficiency of construction projects and secure their transparent administration. One of MOLIT's internal work systems, CPIS focuses on work-handling and data management. However, now over 10 years old after its construction, it focuses on text and document-based construction project information, but it cannot be interfaced with the visualization-based GIS, which limits the sharing and dissemination of information and the determination of the overall construction project status. To resolve the existing CPIS limitations and problems and to upgrade the system, this study examined domestic and overseas GIS technology trends and relevant information systems, and analyzed the CPIS status and problems. It thus proposed total GIS application measures to upgrade CPIS. Also, it identified detailed CPIS utilization measures and GIS application measures by unit system, and analyzed considerations for GIS application.

A Smart River Management Plan for Eco-Delta City (에코델타시티 스마트 하천관리 방안)

  • Yeo, Hong Koo;Kang, Jungu;Shim, Kyu Cheoul;Hong, Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.3-3
    • /
    • 2022
  • 부산 에코델타시티는 세종 5-1 생활권과 더불어 스마트시티 국가시범도시이며, 사업대상지역은 평강천이 관류하여 맥도강, 서낙동강 본류로 흐르는 세물머리지역이 그 중심에 위치하고 있다. 하천을 중심으로 스마트시티가 조성되고 있으나 하천관리는 유역내 홍수관리, 수질관리 등등에 관한 정부주체 상위계획에 종속성이 강한 공공분야로서 단위사업에서 스마트시티에 걸맞는 하천관리계획을 수립하고 시행하는 것은 많은 어려움이 존재한다. 하천관리의 주 관심 대상은 이수를 제외하면 치수, 하천환경, 친수, 하천시설물로 대별할 수 있으며, 스마트 하천관리란 이들에 대한 현황 정보구축 및 지속적인 현행화, 그리고 이들 실제 정보를 토대로 한 합리적 운영과 실시간 연계운영 실현으로 공공서비스를 제공하는 것이라 할 수 있을 것이다. 본 연구는 국가연구개발사업에서 연구한 각 분야별 하천관리기법을 에코델타시티에 시범적용하여 스마트하천관리를 구현할 수 있는 방법을 제시하고자 하였다. 에코델타시티 조성사업의 진행수준으로 인해 취득하기 어려운 정보들은 수립된 계획을 참조하여 적용하였다. 유역내 주 대상 하천들은 델타지역에서 수문으로 통제되므로 일반적인 하천과 달리 정수역에 가까운 특이한 수리특성을 보이고 있지만, 우선 스마트 하천관리를 위한 일반적인 과정들을 시범적용 해보고 필요에 따라 특성 고려 방안을 찾고자 하였다. 유역내 정량적 홍수위험도 평가, 하천환경 평가 적용방안, 하천시설물 관리방안, 주요 지점의 실시간 모니터링 방안 등이 에코델타시티 조성사업 진행단계를 고려하여 수행되고 있다. 사용편의성과 지속가능성을 담보하기 위한 하천연계플랫폼을 구축하여, 개발된 기법들을 각각 내부 모듈로 장착하거나 완성도에 따라 외부모듈로 연계할 수 있도록 하였다. 현재 개발된 기법들의 시스템화 완성 및 관련 정보들의 데이터베이스 확대를 위한 노력이 진행되고 있으며, 향후 하천관리연계플랫폼의 실제 운영을 통하여 완성도를 높여갈 계획이다.

  • PDF

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.