Acknowledgement
본 연구는 2022년도 광주대학교 대학 연구비의 지원을 받아 수행되었음.
References
- Exxon Mobil (2013). Project Tender Document.
- Kang, H.W., Kim, J.W., and Kim, Y.S. (2018). "Risk Assessment and Contingency Prediction considering Work Characteristics for Modular Plant Construction Projects." Korean Journal of Construction Engineering and Management, KICEM, 19(5), pp. 81-89. https://doi.org/10.6106/KJCEM.2018.19.5.081
- Kim, J.W. (2017). "Scenario-based Risk Factor and Risk Cost Analysis Model for Modular Plant Construction." Thesis of M.S. The University of Chung-Ang.
- Lee, W.B. (2021). "Development of Risk Assessment Model for Modular Plant Construction Projects Using Value Engineering." Thesis of M.S. The University of Chung-Ang.
- Murtaza, M.B., Fisher, D.J., and Skibniewski, M.J. (1993). "Knowledge-based approach to modular construction decision support." Journal of Construction Engineering and Management, 119(1), pp. 115-130. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:1(115)
- Park, K.J. (2012). "Introduction of Module Construction Method for Overseas Plant Projects." Korean Journal of Construction Engineering and Management, KICEM, 13(1), pp. 21-24.
- Park, C.Y., Kim. H.J., Won, J.W., Jang, W.S., and Han, S.H. (2016). "A Study for Selecting Modular Construction Method." Korean Journal of Construction Engineering and Management, KICEM, 17(4), pp. 12-19. https://doi.org/10.6106/KJCEM.2016.17.4.012