A Study on the status and improvement of construction management in Susung Culture & Art Center

수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구

  • 박병학 ((주) 건원엔지니어링) ;
  • 유병기 ((주) 건원엔지니어링 CM본부, 한양대학원)
  • Published : 2006.11.11

Abstract

Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

최근 지방자치단체에서 공공공사 발주시 그동안 진행된 CM의 가시적 ${\cdot}$ 긍정적 효과로 인하여 CM용역의 발주가 점차 늘어나고 있는 추세이며, 기획업무를 제외한 사업 추진 전 단계에 걸친 형태의 CM업무가 수행되고 있어 CM이 정착되어 가고 있다고 볼 수 있다. 또한, CM의 발전을 위해서는 기획단계부터의 CM 적용, 현실적인 CM 대가산정 기준 정비, 사업참여주체들의 인식전환, CM 자격 인증화를 동한 전문화 유도 등에 대한 제도적 방안이 마련되어야 한다. 그러나, 사업 추진 단계별 CM 업무 수행 상 예상치 못한 현실적인 문제점들이 도출되고 있으며 이에 대한 대책이 요구되고 있다. 본 연구에서는 수성문화예술회관의 CM적용 사례를 요약하여 설계관리, 설계 VE 수행, 발주자의 요구에 의한 추가 업무 수행 및 공정관리를 통한 공기단축 등에 대한 실무적용상의 문제점과 이에 대한 각각의 개선방안을 제시하여, CM제도의 성공적 정착 및 발전을 위한 방향을 제시하였다.

Keywords