• Title/Summary/Keyword: 건설기성

Search Result 92, Processing Time 0.027 seconds

Evaluation for Applying Low-Cost Mobile Laser System to Earth Volume Calculation at Construction Site (건설현장에서의 토공량산출을 위한 저가형 모바일 레이저시스템의 적용성 평가)

  • Kim, In Seop
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.6_1
    • /
    • pp.539-547
    • /
    • 2012
  • Volume survey for earthwork is conducted periodically at every month at large scaled construction sites for request payment for the construction. Currently, the earthwork volume is calculated on the overlapped drawing for two cross sections which were created by new and previous surveying data observed by GPS and TS. However the survey is required lots of time and expenses as it is a pin-point surveying method thus surveyors intend to get data only for the heavy undulated topographic features chosen by himself to save time and expenses. Consequently, it causes poor results due to low dense measurement as well as it's not matched with the results by another surveyors. As a result, the conflicts related in earthwork volume calculation often arises among the owner, contractors and sub contractors. In this study, we developed a method to get surveying data for fast and accurate volume calculation using 3D Mobile Laser System and conducted an application test. Also we carried out experiments for topographic survey using MLS to judge for the application additionally. The results showed that we could reduce a time for cross section survey from 48 hours to 2 hours and collected high dense data which have 0.2m interval instead of 3m interval compare with existing method. Also we could make a map which has high accuracy within 10cm in horizontal through topographic survey using MLS.

Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management (BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안)

  • Hando Kim;Jeongyong Nam;Yongju Kim;Inhye Ryu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.6
    • /
    • pp.381-389
    • /
    • 2023
  • One of the crucial components in building information modeling (BIM) is data. To systematically manage these data, various research studies have focused on the creation of object breakdown structures and property sets. Specifically, crucial data for managing programs and payments involves work breakdown structures (WBSs) and cost breakdown structures (CBSs), which are indispensable for mapping BIM objects. Achieving this requires disassembling CBS quantities based on 3D objects and WBS. However, this task is highly tedious owing to the large volume of CBS and divergent coding practices employed by different organizations. Manual processes, such as those based on Excel, become nearly impossible for such extensive tasks. In response to the challenge of computing quantities that are difficult to derive from BIM objects, this study presents methods for disassembling length-based quantities, incorporating significant portions of the bill of quantities (BOQs). The proposed approach recommends suitable CBS by leveraging the accumulated history of WBS-CBS mapping databases. Additionally, it establishes a unified CBS code, facilitating the effective operation of CBS databases.

Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.

  • PDF

A Case of Change in Pile Foundation By Construction Condition in Site (현장상황을 반영한 말뚝기초의 변경 사례)

  • Park, See-Boum;Oh, Geon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.775-778
    • /
    • 2008
  • 기초의 지지방식 중 깊은 기초로 분류되는 말뚝기초는 일반적으로 고강도의 기성강관(Spiral Steel Pipe)을 재료로 한 말뚝을 사용하는 것이 설계 및 시공측면에서 유리하나, 현재 국내 외의 치솟는 건설원자재 비용 및 고유가에 따른 장거리 운반비용의 증가와 더불어 건설현장에서의 경제적 부담이 상당부분 증가되고 있는 실정이다. 특히, 개발후진국을 비롯한 건설 산업의 국제적 진출에 대한 활기와 더불어 해외현장 변동상황(원자재의 수급 문제에 따른 공기지연 및 경제성) 등을 고려하면 이에 대한 능동적인 대처가 절실할 수 있다. 본 사례는 중동지역 $\bigcirc\bigcirc$조선소의 이러한 현장여건을 고려하여 중 소하중 규모의 크레인 기초에 적용된 말뚝의 구조 해석적 검토와 지역 지반조건을 반영하여 안정하고 현지조달이 가능한 말뚝 재료의 변경을 제안한 경우이다. 본 검토에서는 기초 말뚝의 정역학적 허용지지력과 기초지반 조건을 고려한 항타관입 분석 및 크레인 이동하중을 고려한 응력해석을 실시하여 최대연직력, 모멘트, 전단력, 응력비 등을 비교하였으며, 동일한 검토조건하에서 결과를 바탕으로 변경 가능한 말뚝을 선정하였다. 기초지반에 대한 적정안전율을 갖는 허용지지력 및 구조적 안정성의 확보가 가능한 콘크리트 말뚝으로의 변경이 가능하며 상부하중 규모에 따라 설치간격에 따른 파일본수의 증 감이 발생되었다.

  • PDF

A Study on the Improvement of Construction Progress Measurement Based on Earned Value Concept (EV기반 RC 공사 진도율산정 개선방안)

  • Choi Tae-Young;Jung Hye-Won;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.307-310
    • /
    • 2003
  • Construction projects include risks due to uncertain factors, so it's important to repeatedly evaluate the performance of on-going work in all aspects of the projects. But construction projects are usually managed focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. Recently many researches about cost and schedule integration methods are in progress according to the increasing of interest and EVMS (Earned Value Management System). Though researchers comment and propose many methods, it's hard to find example to apply it to the real project. So, the purpose of this study is to improve a method of construction Progress measurement Based on Earned value Concept by integration of cost and schedule management. It investigates the previous studies, interviews and performs a case study.

  • PDF

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

Study on Soil Moisture Predictability using Machine Learning Technique (머신러닝 기법을 활용한 토양수분 예측 가능성 연구)

  • Jo, Bongjun;Choi, Wanmin;Kim, Youngdae;kim, Kisung;Kim, Jonggun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.248-248
    • /
    • 2020
  • 토양수분은 증발산, 유출, 침투 등 물수지 요소들과 밀접한 연관이 있는 주요한 변수 중에 하나이다. 토양수분의 정도는 토양의 특성, 토지이용 형태, 기상 상태 등에 따라 공간적으로 상이하며, 특히 기상 상태에 따라 시간적 변동성을 보이고 있다. 기존 토양수분 측정은 토양시료 채취를 통한 실내 실험 측정과 측정 장비를 통한 현장 조사 방법이 있으나 시간적, 경제적 한계점이 있으며, 원격탐사 기법은 공간적으로 넓은 범위를 포함하지만 시간 해상도가 낮은 단점이 있다. 또한, 모델링을 통한 토양수분 예측 기술은 전문적인 지식이 요구되며, 복잡한 입력자료의 구축이 요구된다. 최근 머신러닝 기법은 수많은 자료 학습을 통해 사용자가 원하는 출력값을 도출하는데 널리 활용되고 있다. 이에 본 연구에서는 토양수분과 연관된 다양한 기상 인자들(강수량, 풍속, 습도 등)을 활용하여 머신러닝기법의 반복학습을 통한 토양수분의 예측 가능성을 분석하고자 한다. 이를 위해 시공간적으로 토양수분 실측 자료가 잘 구축되어 있는 청미천과 설마천 유역을 대상으로 머신러닝 기법을 적용하였다. 두 대상지에서 2008년~2012년 수문자료를 확보하였으며, 기상자료는 기상자료개방포털과 WAMIS를 통해 자료를 확보하였다. 토양수분 자료와 기상자료를 머신러닝 알고리즘을 통해 학습하고 2012년 기상 자료를 바탕으로 토양수분을 예측하였다. 사용되는 머신러닝 기법은 의사결정 나무(Decision Tree), 신경망(Multi Layer Perceptron, MLP), K-최근접 이웃(K-Nearest Neighbors, KNN), 서포트 벡터 머신(Support Vector Machine, SVM), 랜덤 포레스트(Random Forest), 그래디언트 부스팅 (Gradient Boosting)이다. 토양수분과 기상인자 간의 상관관계를 분석하기 위해 히트맵(Heat Map)을 이용하였다. 히트맵 분석 결과 토양수분의 시간적 변동은 다양한 기상 자료 중 강수량과 상대습도가 가장 큰 영향력을 보여주었다. 또한 다양한 기상 인자 기반 머신러닝 기법 적용 결과에서는 두 지역 모두 신경망(MLP) 기법을 제외한 모든 기법이 전반적으로 실측값과 유사한 형태를 보였으며 비교 그래프에서도 실측값과 예측 값이 유사한 추세를 나타냈다. 따라서 상관관계있는 과거 기상자료를 통해 머신러닝 기법 기반 토양수분의 시간적 변동 예측이 가능할 것으로 판단된다.

  • PDF

A Study on the Development of Domestic-Oriented Prototype for EVMS Operation System by Using Work Task (작업관리 개념을 응용한 EVMS 운영 시스템 프로토타입 개발)

  • Park, Hong-Tae;Yang, Keum-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.6
    • /
    • pp.1281-1286
    • /
    • 2009
  • Our government operates earned value management system (EVMS)of construction schedule and cost for improving earned management system of the construction projects. but There is two unification Method construction schedule and cost to estimate construction progress currently. This weight a staff work. therefore this study present unification method which operate integrate schedule and cost by using work task. In order to inflect verification and model of schedule and cost, this study develop prototype of EVMS.

Development of Labor Productivity Index for Steel Construction (철골공사의 노동생산지수 개발)

  • Kang Byoung-Ryoul;Kim Ki-Sung;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.353-357
    • /
    • 2004
  • The construction competition is more deepened with the enterprise possibility increase which it follows in the regulation relaxation back against the construction market penetration which carries and the instability of market is added an extra weight and it solves the aspect where also the profitability which is caused by with low price bidding decreases. Against a productivity with the overcome plan it is researched plentifully and the far for a productivity improvement, there is so far to construction, the productivity being used with only include meaning, is to a practical affairs and the application ver)r as the level which is feeble is a possibility of doing. It is like that and the research develops the producing district possibility of new steel-frame work and in the actuality which sees the production volume of steel-frame work and a construction accomplishment process effectively and to be right numerical figures it does it plans it controls and manages the place ultimate objective which it puts.

  • PDF

Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF