A Study on the Development of Domestic-Oriented Prototype for EVMS Operation System by Using Work Task

작업관리 개념을 응용한 EVMS 운영 시스템 프로토타입 개발

  • Park, Hong-Tae (Kongju National University Department of Civil & Environment Engineering) ;
  • Yang, Keum-Chul (Kongju National University Department of Civil & Environment Engineering)
  • 박홍태 (공주대학교 건설환경공학부) ;
  • 양금철 (공주대학교 건설환경공학부)
  • Published : 2009.06.30

Abstract

Our government operates earned value management system (EVMS)of construction schedule and cost for improving earned management system of the construction projects. but There is two unification Method construction schedule and cost to estimate construction progress currently. This weight a staff work. therefore this study present unification method which operate integrate schedule and cost by using work task. In order to inflect verification and model of schedule and cost, this study develop prototype of EVMS.

건설공사의 기성관리체계의 효율적인 운영을 위해, 정부는 공정과 내역의 통합관리를 위한 EVMS를 운영하고 있다. 그러나 현재 공사진도의 평가기준인 공정과 내역이 이원화로 운영되고 있어 건설공사 실무자들에게 부가적인 업무를 가중시켜 왔다. 본 연구는 공정과 내역이 통합 운영될 수 있는 일원화 방안으로 작업과업의 개념을 도입하여 공정과 내역을 공유하기 위한 정보채널로 사용하였다. 또한, 이 작업과업을 활용한 공정 내역 통합관리시스템의 모형제시 및 활용성 검증을 통하여 EVMS 운영 시스템 프로토타입을 개발하여 그 효율성을 제시하였다.

Keywords

References

  1. ARTEMIS S/W 개요, 한국전력공사, 1990.
  2. 이유섭, 강태경, 공공 건설공사 공정, 한국건설기술연구원, 2003.
  3. 박찬정, "일정과 원가를 통합한 건설공사관리 시스템 구축에 관한 연구", 명지대학교, 대학원, 박사학위논문, 1998.
  4. 정철원외, "EV개념에 의한 통합건설공사관리시스템" 한국건설관리학회, 정기학술발표 논문집, 11월, 2001.
  5. 방종대, 강현규, 공동주택 공정-비용 통합관리 실용화, 한국건설관리학회, 2003.
  6. 건설기술관리법 시행령 제38조 15, 2000. 7. 1.
  7. Primavera Project Planner(P3) Dem Guide. 1993.
  8. Nex-pert /Pro. Dem Guide. 1993.
  9. MS-PROJECT, LG S/W 1007. 3.
  10. Aubdayyeh"Prototype Integrated Cost and Schedule Control System." Joural of Computing in Civil Engineering ASCE, 1997(2).