Residental photovoltaic power system achieved remarkable results in distribution and activation through 'One Million Green Homes Program' led by the government. However, system maintenance and management after installation are relative unsatisfactory. Thus, problems, such as malfunctioning, decrease in efficiency, breakage, etc, are occurring in succession which means that expensive facilities are not used effectively. This study attempted to propose a more preferred alternative to the photovoltaic power system currently applied and installed to the housing by investigating and analyzing the said system, identifying management practices, and deriving problems. For this study, 48 houses equipped with photovoltaic systems in J City were chosen and they were analyzed after preliminary research and field investigation. The results revealed that most of the surveyed systems in J City are still in fairly good conditions. But the instruction and information regarding the appropriate operational management of those surveyed systems have not been delivered to the owner. Therefore, promotion education and related manual deployment should be done by the contractor. In terms of installation, inadequate system location and some warranty services are required to be improved, which are usually caused by a lack of careful planning and construction. In addition, the follow-up management needs to be provided about five years later after installation considering system deterioration.