• 제목/요약/키워드: weight of schedule

검색결과 108건 처리시간 0.023초

미숙아와 저출생체중아의 예방접종 (Immunization of preterm and low birth weight infant)

  • 박수은
    • Clinical and Experimental Pediatrics
    • /
    • 제49권1호
    • /
    • pp.14-17
    • /
    • 2006
  • Infants who are born prematurely or with low birth weight should be immunized at the same postnatal chronologic age. They should receive BCG, DTaP, IPV vaccines according to the same recommended schedule as full term infants. Hepatitis B vaccine schedule is modified when hepatitis B vaccine is administered a infant with birth weight less than 2,000 g. The recommended standard dose of each vaccine should be administered. Proportion of children experiencing vaccine-related adverse events dose not differ between full-term and preterm infants. Immunization with routinely recommended childhood vaccines is safe for preterm and low birth weight infants.

Near-Optimal Algorithm for Group Scheduling in OBS Networks

  • Nhat, Vo Viet Minh;Quoc, Nguyen Hong;Son, Nguyen Hoang
    • ETRI Journal
    • /
    • 제37권5호
    • /
    • pp.888-897
    • /
    • 2015
  • Group scheduling is an operation whereby control packets arriving in a time slot schedule their bursts simultaneously. Normally, those bursts that are of the same wavelength are scheduled on the same channel. In cases where the support of full wavelength converters is available, such scheduling can be performed on multiple channels for those bursts that are of an arbitrary wavelength. This paper presents a new algorithm for group scheduling on multiple channels. In our approach, to reach a near-optimal schedule, a maximum-weight clique needs to be determined; thus, we propose an additional algorithm for this purpose. Analysis and simulation results indicate that an optimal schedule is almost attainable, while the complexity of computation and that of implementation are reduced.

작업관리 개념을 응용한 EVMS 운영 시스템 프로토타입 개발 (A Study on the Development of Domestic-Oriented Prototype for EVMS Operation System by Using Work Task)

  • 박홍태;양금철
    • 한국산학기술학회논문지
    • /
    • 제10권6호
    • /
    • pp.1281-1286
    • /
    • 2009
  • 건설공사의 기성관리체계의 효율적인 운영을 위해, 정부는 공정과 내역의 통합관리를 위한 EVMS를 운영하고 있다. 그러나 현재 공사진도의 평가기준인 공정과 내역이 이원화로 운영되고 있어 건설공사 실무자들에게 부가적인 업무를 가중시켜 왔다. 본 연구는 공정과 내역이 통합 운영될 수 있는 일원화 방안으로 작업과업의 개념을 도입하여 공정과 내역을 공유하기 위한 정보채널로 사용하였다. 또한, 이 작업과업을 활용한 공정 내역 통합관리시스템의 모형제시 및 활용성 검증을 통하여 EVMS 운영 시스템 프로토타입을 개발하여 그 효율성을 제시하였다.

공정 그룹별 Start lag을 고려한 스케쥴링 (Scheduling with regard to start lag in process group)

  • 전태준;박성호
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1996년도 추계학술대회발표논문집; 고려대학교, 서울; 26 Oct. 1996
    • /
    • pp.299-302
    • /
    • 1996
  • The purpose of this study is developing scheduling logic and program for machining scheduling of automobile part production line with unbalanced processing time. Three rules are developed to minimize slack and effect on other job. Fourth rule is suggested which considered weighted sum of three factors. schedule is generated totally 1, 000 times and then optimal weight parameter is selected. The program is developed to schedule situation to compare with the performance measure, total finish time of machine and total tardiness of part. As a result, the rule which considered weighted sum of three factors is effective for both measure.

  • PDF

Effect of Extended Egg Preservation Schedule in Conservation of Mutant Silkworm (Bombyx mori L.) Genetic Stocks in Gene Bank

  • Muthulakshmi M.;Mohan B.;Balachandran N.;Sinha R. K.;Thangavelu K.
    • International Journal of Industrial Entomology and Biomaterials
    • /
    • 제11권2호
    • /
    • pp.93-98
    • /
    • 2005
  • Studies on extended egg preservation schedule from 120 days to 180 days was taken up with 20 germplasm accessions of mutant silkworm genetic stocks of Bombyx mori L. Statistical analyses of the data collected over three trials revealed no significant changes both in the qualitative and quantitative traits of the genetic stocks between treatment (6 months egg preservation) and control (4 months egg preservation), except for fifth instar larval duration in TMS-61, TMS-62, TMS64, TMS-31 and TMS-34 shell weight in TMS-62, TMS-64 and TMS-66. Thus, the results indicate that extended schedule of 6 months egg preservation can safely be adopted, which will reduce the cost of conservation and minimize the genetic erosion owing to reduced crop cycle.

The Expressional Changes of Nitric Oxide Synthase in the Rat Brain Following Food Restriction

  • Kang Kyounglan;Huh Youngbuhm;Park Chan;Choue Ryo Won
    • Nutritional Sciences
    • /
    • 제8권4호
    • /
    • pp.231-236
    • /
    • 2005
  • This study investigated the changes in the neuronal nitric oxide synthase (nNOS) and nicotinamide adenine dinucleotide phosphate-diaphorase (NADPH-d) activities during food restriction in the rat brain such as cerebral cortex, cerebellum, caudate pautamen and hypothalamus. The rats were placed on a restricted feeding schedule consisting of half the ad libitum quantity for 3 days and 1, 2, 4, 6 and 9 weeks, and a free feeding schedule for 4 weeks. The loss of body weight peaked after 1 week of food restriction and persisted during the entire 9-week period of food restriction. The dramatic weight change in the first week ($12\%$) and the reduction in weight changes thereafter suggest that major adaptation changes occur early and body maintenance occurs subsequently. In the hypothalamus, the optical densities of the NADPH-d and nNOS immunoreactivities were found to be significantly higher in the 1-week and lower in the 9-week food restricted group than in the ad libitum fed control rats. In contrast, in the cerebral cortex, the optical densities of the NADPH-d- and nNOS-positive neurons were not changed significantly during the period of food restriction. This study provides the morphological evidence showing that food restriction has a significant effect on the nitric oxide synthesizing system of the hypothalamus.

Olanzapine이 백서의 Schedule-Induced Polydipsia에 미치는 영향 (Effects of Olanzapine on the Schedule-Induced Polydipsic Rats)

  • 이기철;이경규;장환일;이정호;김현우;하준명;정재현;정홍경
    • 생물정신의학
    • /
    • 제6권2호
    • /
    • pp.240-245
    • /
    • 1999
  • Object : This study was designed to evaluate the effects of olanzapine on the schedule-induced polydipsia(SIP) which is one of animal model of obsessive-compulsive disorder in rats. We administered olanzapine as a serotonin and dopamine blocking agent, fluoxetine as a selective serotonin reuptake inhibitor, and haloperidol for the dopamine antagonist to rats which showed schedule-induced polydipsic behavior. Methods : Spraque-Dawley rats weighing 200-250gm were individually housed and maintained and allowed free access to water. The rats were placed on a restricted diet. To induce polydipsia, rats were placed in the cage where a pellet dispenser automatically dispensed 90mg pellets on a fixed-time 60 seconds(FT-60s) feeding schedule over 150 minute test session per day. Water was available at all times in the cage. After 4 weeks of daily exposure to the FT 60s feeding schedule, experimental rats met a predetermined criterion for polydipsic behavior(greater than 3 times of water per session on average). 5 groups of rats were administered olanzapine(3mg/kg, i.p), olanzapine(10mg/kg, i.p), fluoxetine(5mg/kg, i.p.), haloperidol(0.1mg/kg, i.p.), and vehicle(1cc/kg, i.p.) for 3 weeks. The rats were tested once a week to access schedule induced polydipsic behavior. Water bottles were weighed before and after the 150-minute test session. The chronic effects of administration of experimental drugs on schedule induced polydipsic behavior were analyzed with ANOVA and Scheffe test as a posthoc comparison. In order to measure water consumption in non-polydipsic food-deprived rats, a separate group of rats(N=8) were individually housed and given a single bolus(14.5gm) of food per day which maintained them at their average body weight. Results and Conclusion : The results were as follows ; 1) After 4 weeks of scheduled feeding procedure, the experimental group showed significant differences than the bolus control in the amount of water consumption as compared with their average water intakes for 4 weeks. At the same periods, there were no differences between the experimental group and the bolus control in the body weight. 2) The fluoxetine group showed significant decrease in the amount of water intake over the 3 weeks of drug treatment as compared with their average amount of polydipsic water intakes. The olanzapine 3mg group showed significant decrease in the amount of water intake at 3rd weeks of drug treatment as compared with their average amount of polydipsic water intakes. The olanzapine 10mg group showed significant decrease in the amount of water intake at 2nd and 3rd weeks of drug treatment as compared with their average amount of polydipsic water intakes. However, the haloperidol group and the vehicle control group showed no changes of amounts of water intake for 3 weeks of treatment as compared with their average amount of polydipsic water intakes. 3) The fluoxetine group showed significantly lower amounts of water intake than the haloperidol group at 2nd weeks of drug treatment. And also the fluoxetine group showed significantly lower amounts of water intake than the haloperidol group and the vehicle control at 3rd weeks of drug treatment. The olanzapine 3mg group and the olanzapine 10mg group showed significantly lower amounts of water intake than the haloperidol group and the vehicle control at 3rd weeks of drug treatment. Above findings suggest that the fixed time feeding procedure for schedule-induced polydipsia as an animal model of obsessive compulsive disorder was effective to the evaluation of pharmacological challenge study. The authors assume that the serotonin hypothesis and the serotonin-dopamine interaction hypothesis are preferred to the dopamine hypothesis in the biological etiology of obsessive-compulsive disorder.

  • PDF

건설공사의 진도율 산정 방법에 관한 연구 (A study on progress measurement method of a construction project)

  • 박세정;김수용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.450-453
    • /
    • 2003
  • 건선 사업에 일어서 초기 계획과 기성의 주기적이고 반복적인 비교 검토는 매우 중요하다. 이를 위해서는 정확한 현장 실적자료가 제공되어야하고, 작업량을 객관적으로 계량화하는 기준 및 진행상황을 정확히 반영한 진도율 산정이 필요하다. 이러한 진도율 산정을 위해서는 전체 사업이 명확한 작업범위를 갖는 단위작업으로 분할되어, 각 단위 작업에 필요한 정보가 할당되어야 한다. 국내 건설 사업에서와 같이 내역중심의 사업관리가 이루어지고 있는 상황하에서는 각 단위작업의 물량, 공사비 둥을 포함한 비용 정보 뿐만 아니라 일정 정보를 반영한 진도율 산정 방법이 필수적이며, 본 연구에서는 두 가지 정보에 의한 가중 진도율 산정방법을 제시하고자 한다.

  • PDF

OVERALL BENEFIT-DURATION OPTIMIZATION (OBDO) FOR OWNERS IN LARGE-SCALE CONSTRUCTION PROJECTS

  • Seng-Kiong Ting;Heng Pan
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.780-785
    • /
    • 2005
  • This paper aims to consider an overall benefit-duration optimization (OBDO) problem for the sake of maximizing owner's economic benefits, whilst considering influences of schedule compression incurred opportunity income on the profitability of a large-scale construction project. Unlike previous schedule optimization models and techniques that have focused on project duration or cost minimization, with greater weight on contractors' interests, OBDO facilitates owner's economic benefits through overall benefit-duration optimization. In this paper, the objective function of OBDO model is formulated. An example is illustrated to prove the feasibility and practicability of the overall benefit-duration optimization problem. The significance of employing OBDO model and future research work are also described.

  • PDF

패밀리 셋업이 존재하는 병렬기계 일정계획 수립 (Scheduling for Parallel Machines with Family Setup Times)

  • 권익현;신현준;엄동환;김성식
    • 한국경영과학회지
    • /
    • 제30권1호
    • /
    • pp.27-41
    • /
    • 2005
  • This paper considers identical parallel machine scheduling problem. Each job has a processing time. due date. weight and family type. If a different type of job is followed by prior job. a family setup is incurred. A two phased heuristic is presented for minimizing the sum of weighted tardiness. In the first phase. using roiling horizon technique. group each job into same family and schedule each family. In the second phase. assign each job to machines using schedule obtained in the first phase. Extensive computational experiments and comparisons among other algorithms are carried out to show the efficiency of the proposed algorithm.