• Title/Summary/Keyword: weight of schedule

Search Result 108, Processing Time 0.025 seconds

Immunization of preterm and low birth weight infant (미숙아와 저출생체중아의 예방접종)

  • Park, Su-Eun
    • Clinical and Experimental Pediatrics
    • /
    • v.49 no.1
    • /
    • pp.14-17
    • /
    • 2006
  • Infants who are born prematurely or with low birth weight should be immunized at the same postnatal chronologic age. They should receive BCG, DTaP, IPV vaccines according to the same recommended schedule as full term infants. Hepatitis B vaccine schedule is modified when hepatitis B vaccine is administered a infant with birth weight less than 2,000 g. The recommended standard dose of each vaccine should be administered. Proportion of children experiencing vaccine-related adverse events dose not differ between full-term and preterm infants. Immunization with routinely recommended childhood vaccines is safe for preterm and low birth weight infants.

Near-Optimal Algorithm for Group Scheduling in OBS Networks

  • Nhat, Vo Viet Minh;Quoc, Nguyen Hong;Son, Nguyen Hoang
    • ETRI Journal
    • /
    • v.37 no.5
    • /
    • pp.888-897
    • /
    • 2015
  • Group scheduling is an operation whereby control packets arriving in a time slot schedule their bursts simultaneously. Normally, those bursts that are of the same wavelength are scheduled on the same channel. In cases where the support of full wavelength converters is available, such scheduling can be performed on multiple channels for those bursts that are of an arbitrary wavelength. This paper presents a new algorithm for group scheduling on multiple channels. In our approach, to reach a near-optimal schedule, a maximum-weight clique needs to be determined; thus, we propose an additional algorithm for this purpose. Analysis and simulation results indicate that an optimal schedule is almost attainable, while the complexity of computation and that of implementation are reduced.

A Study on the Development of Domestic-Oriented Prototype for EVMS Operation System by Using Work Task (작업관리 개념을 응용한 EVMS 운영 시스템 프로토타입 개발)

  • Park, Hong-Tae;Yang, Keum-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.6
    • /
    • pp.1281-1286
    • /
    • 2009
  • Our government operates earned value management system (EVMS)of construction schedule and cost for improving earned management system of the construction projects. but There is two unification Method construction schedule and cost to estimate construction progress currently. This weight a staff work. therefore this study present unification method which operate integrate schedule and cost by using work task. In order to inflect verification and model of schedule and cost, this study develop prototype of EVMS.

Scheduling with regard to start lag in process group (공정 그룹별 Start lag을 고려한 스케쥴링)

  • 전태준;박성호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.10a
    • /
    • pp.299-302
    • /
    • 1996
  • The purpose of this study is developing scheduling logic and program for machining scheduling of automobile part production line with unbalanced processing time. Three rules are developed to minimize slack and effect on other job. Fourth rule is suggested which considered weighted sum of three factors. schedule is generated totally 1, 000 times and then optimal weight parameter is selected. The program is developed to schedule situation to compare with the performance measure, total finish time of machine and total tardiness of part. As a result, the rule which considered weighted sum of three factors is effective for both measure.

  • PDF

Effect of Extended Egg Preservation Schedule in Conservation of Mutant Silkworm (Bombyx mori L.) Genetic Stocks in Gene Bank

  • Muthulakshmi M.;Mohan B.;Balachandran N.;Sinha R. K.;Thangavelu K.
    • International Journal of Industrial Entomology and Biomaterials
    • /
    • v.11 no.2
    • /
    • pp.93-98
    • /
    • 2005
  • Studies on extended egg preservation schedule from 120 days to 180 days was taken up with 20 germplasm accessions of mutant silkworm genetic stocks of Bombyx mori L. Statistical analyses of the data collected over three trials revealed no significant changes both in the qualitative and quantitative traits of the genetic stocks between treatment (6 months egg preservation) and control (4 months egg preservation), except for fifth instar larval duration in TMS-61, TMS-62, TMS64, TMS-31 and TMS-34 shell weight in TMS-62, TMS-64 and TMS-66. Thus, the results indicate that extended schedule of 6 months egg preservation can safely be adopted, which will reduce the cost of conservation and minimize the genetic erosion owing to reduced crop cycle.

The Expressional Changes of Nitric Oxide Synthase in the Rat Brain Following Food Restriction

  • Kang Kyounglan;Huh Youngbuhm;Park Chan;Choue Ryo Won
    • Nutritional Sciences
    • /
    • v.8 no.4
    • /
    • pp.231-236
    • /
    • 2005
  • This study investigated the changes in the neuronal nitric oxide synthase (nNOS) and nicotinamide adenine dinucleotide phosphate-diaphorase (NADPH-d) activities during food restriction in the rat brain such as cerebral cortex, cerebellum, caudate pautamen and hypothalamus. The rats were placed on a restricted feeding schedule consisting of half the ad libitum quantity for 3 days and 1, 2, 4, 6 and 9 weeks, and a free feeding schedule for 4 weeks. The loss of body weight peaked after 1 week of food restriction and persisted during the entire 9-week period of food restriction. The dramatic weight change in the first week ($12\%$) and the reduction in weight changes thereafter suggest that major adaptation changes occur early and body maintenance occurs subsequently. In the hypothalamus, the optical densities of the NADPH-d and nNOS immunoreactivities were found to be significantly higher in the 1-week and lower in the 9-week food restricted group than in the ad libitum fed control rats. In contrast, in the cerebral cortex, the optical densities of the NADPH-d- and nNOS-positive neurons were not changed significantly during the period of food restriction. This study provides the morphological evidence showing that food restriction has a significant effect on the nitric oxide synthesizing system of the hypothalamus.

Effects of Olanzapine on the Schedule-Induced Polydipsic Rats (Olanzapine이 백서의 Schedule-Induced Polydipsia에 미치는 영향)

  • Lee, Gi-Chul;Lee, Kyung-Kyu;Chang, Hwan-Il;Lee, Jung-Ho;Kim, Hyun-Woo;Ha, Jun-Myung;Jeong, Jae-Hyun;Jeong, Hong-Kyung
    • Korean Journal of Biological Psychiatry
    • /
    • v.6 no.2
    • /
    • pp.240-245
    • /
    • 1999
  • Object : This study was designed to evaluate the effects of olanzapine on the schedule-induced polydipsia(SIP) which is one of animal model of obsessive-compulsive disorder in rats. We administered olanzapine as a serotonin and dopamine blocking agent, fluoxetine as a selective serotonin reuptake inhibitor, and haloperidol for the dopamine antagonist to rats which showed schedule-induced polydipsic behavior. Methods : Spraque-Dawley rats weighing 200-250gm were individually housed and maintained and allowed free access to water. The rats were placed on a restricted diet. To induce polydipsia, rats were placed in the cage where a pellet dispenser automatically dispensed 90mg pellets on a fixed-time 60 seconds(FT-60s) feeding schedule over 150 minute test session per day. Water was available at all times in the cage. After 4 weeks of daily exposure to the FT 60s feeding schedule, experimental rats met a predetermined criterion for polydipsic behavior(greater than 3 times of water per session on average). 5 groups of rats were administered olanzapine(3mg/kg, i.p), olanzapine(10mg/kg, i.p), fluoxetine(5mg/kg, i.p.), haloperidol(0.1mg/kg, i.p.), and vehicle(1cc/kg, i.p.) for 3 weeks. The rats were tested once a week to access schedule induced polydipsic behavior. Water bottles were weighed before and after the 150-minute test session. The chronic effects of administration of experimental drugs on schedule induced polydipsic behavior were analyzed with ANOVA and Scheffe test as a posthoc comparison. In order to measure water consumption in non-polydipsic food-deprived rats, a separate group of rats(N=8) were individually housed and given a single bolus(14.5gm) of food per day which maintained them at their average body weight. Results and Conclusion : The results were as follows ; 1) After 4 weeks of scheduled feeding procedure, the experimental group showed significant differences than the bolus control in the amount of water consumption as compared with their average water intakes for 4 weeks. At the same periods, there were no differences between the experimental group and the bolus control in the body weight. 2) The fluoxetine group showed significant decrease in the amount of water intake over the 3 weeks of drug treatment as compared with their average amount of polydipsic water intakes. The olanzapine 3mg group showed significant decrease in the amount of water intake at 3rd weeks of drug treatment as compared with their average amount of polydipsic water intakes. The olanzapine 10mg group showed significant decrease in the amount of water intake at 2nd and 3rd weeks of drug treatment as compared with their average amount of polydipsic water intakes. However, the haloperidol group and the vehicle control group showed no changes of amounts of water intake for 3 weeks of treatment as compared with their average amount of polydipsic water intakes. 3) The fluoxetine group showed significantly lower amounts of water intake than the haloperidol group at 2nd weeks of drug treatment. And also the fluoxetine group showed significantly lower amounts of water intake than the haloperidol group and the vehicle control at 3rd weeks of drug treatment. The olanzapine 3mg group and the olanzapine 10mg group showed significantly lower amounts of water intake than the haloperidol group and the vehicle control at 3rd weeks of drug treatment. Above findings suggest that the fixed time feeding procedure for schedule-induced polydipsia as an animal model of obsessive compulsive disorder was effective to the evaluation of pharmacological challenge study. The authors assume that the serotonin hypothesis and the serotonin-dopamine interaction hypothesis are preferred to the dopamine hypothesis in the biological etiology of obsessive-compulsive disorder.

  • PDF

A study on progress measurement method of a construction project (건설공사의 진도율 산정 방법에 관한 연구)

  • Park se-Jung;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2003
  • It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.

  • PDF

OVERALL BENEFIT-DURATION OPTIMIZATION (OBDO) FOR OWNERS IN LARGE-SCALE CONSTRUCTION PROJECTS

  • Seng-Kiong Ting;Heng Pan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.780-785
    • /
    • 2005
  • This paper aims to consider an overall benefit-duration optimization (OBDO) problem for the sake of maximizing owner's economic benefits, whilst considering influences of schedule compression incurred opportunity income on the profitability of a large-scale construction project. Unlike previous schedule optimization models and techniques that have focused on project duration or cost minimization, with greater weight on contractors' interests, OBDO facilitates owner's economic benefits through overall benefit-duration optimization. In this paper, the objective function of OBDO model is formulated. An example is illustrated to prove the feasibility and practicability of the overall benefit-duration optimization problem. The significance of employing OBDO model and future research work are also described.

  • PDF

Scheduling for Parallel Machines with Family Setup Times (패밀리 셋업이 존재하는 병렬기계 일정계획 수립)

  • Kwon Ick-Hyun;Shin Hyun-Joon;Eom Dong-Hwan;Kim Sung-Shick
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.1
    • /
    • pp.27-41
    • /
    • 2005
  • This paper considers identical parallel machine scheduling problem. Each job has a processing time. due date. weight and family type. If a different type of job is followed by prior job. a family setup is incurred. A two phased heuristic is presented for minimizing the sum of weighted tardiness. In the first phase. using roiling horizon technique. group each job into same family and schedule each family. In the second phase. assign each job to machines using schedule obtained in the first phase. Extensive computational experiments and comparisons among other algorithms are carried out to show the efficiency of the proposed algorithm.