Deriving of Critical Factors for Construction Planning in Large Span Roof Construction (대공간 지붕 철골공사의 시공계획 중점관리항목 도출)

  • Lee, Myungdo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.1
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

Development of a waste recognition model at construction sites (건설현장에서 발생하는 폐기물 인식 모델 개발)

  • Na, Seunguk;Heo, Seokjae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.219-220
    • /
    • 2021
  • It is considered that the construction industry is one of the pivotal players in the national economy in terms of Gross Domestic Production (GDP) and employment. Behind the positive role of this industrial sector to the national economy, the construction industry generates approximately 50 % of the total waste generation from all the industrial sectors. There are several measures to mitigate the adverse impacts of the construction waste such as reduce, reuse and recycle. Recycling would be one of the effective strategies for waste minimisation, which would be able to reduce the demand upon new resources as well as enhance reusing the construction materials on sites. The automated construction waste classification system would make it possible not only to reduce the amount of labour input but also mitigate the possibility of errors during the manual classification process. In this study, we proposed an automated waste segmentation and classification system for recycling the construction and demolition waste in the real construction site context. Since the practical application to the real-world construction sites was one of the significant factors to develop the system, a YOLACT (You Only Look At CoefficienTs) algorithm was chosen to conduct the study. In this study, it is expected that the proposed system would make it possible to enhance the productivity as well as the cost efficiency by reducing the manpower for the construction and demolition waste management at the construction site.

  • PDF

A Study on the Selection Method of Foundation Type in the Underground Parking Lot of Apartments (공동주택 지하 주차장 기초형식 선정방법에 관한 연구)

  • Im, Nam-Gi;Lee, Yeong-Do;Bae, Yong-Hwan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.3
    • /
    • pp.109-116
    • /
    • 2004
  • Normally easy task of plat in urban architecture is that using underground full of activities for increase building site efficiency. Especially for using underground space for the parking lot. Also utilize underground is more increase for fulfill requirement in modern society considered with environmental friendly architecture. The primary objective of this study is to apply analyzed formal foundation type for selecting the optimum type of parking lots considered with structural stability, economical efficiency, construction efficiency, construction duration. This study aim to on criteria decided through the questionaries for the selection considered with in the scale of second stories parking lots underground, parking volume is 80 and reinforced concrete structure. The bearing capacity is 6~8m and downward from surface, healthy ground bearing capacity is 40 t/m2. This study comparative analysis and discuss economical efficiency, construction efficiency, construction duration based constructivist stability which applied Single foundation, Mat foundation, Drop Mat foundation. The result of this study is as follows: First, the result of economical efficiency is that on the basis of single foundation, Drop Mat foundation is 1.88, Mat foundation 2.04 as a comparative analysis on the basis of total construction cost included material cost, labor coast and machinery cost. Second, the result of construction efficiency order is single foundation, Drop Mat foundation, Mat foundation as a comparative analysis on the based connected characteristics. Third, the result of construction duration is that on the basis of Mat Foundation, Drop Mat foundation is 1.33, single foundation is 1.87 as a comparative analysis Critical Path. Forth, Each foundational type characteristics order through the matrix method is that overall each formal type of foundation contraries at economical efficiency and construction efficiency, construction duration. Also expect contradiction between engineers and owners due to engineer pursuit construction duration and ewer to begin with economical efficiency. Fifth, The selection of suitable foundation formal type needs that based consider project characteristic and field condition as according to above result of a comparative analysis. As a result, a comparative analysis economical efficiency, construction efficiency, construction duration of Mat foundation, Drop Mat foundation, single foundation with 3Bay reinforced structure underground parking lots on the healthy ground.

The problem of using BIM data for facility management (시설물 유지관리를 위한 BIM데이터 전달의 문제점)

  • An, Hyo-Kyung;Lee, Seul-Ki;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF

GENERAL QUALITY ASSURANCE STRATEGY IN MASS CONSTRUCTION OF RESIDENTIAL BUILDINGS IN DEVELOPING COUNTRIES

  • A.Rashidi;M.H.Sebt
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.769-776
    • /
    • 2007
  • The comprehensive Topic of Total Quality Management (TQM) has been put forward since the 6th decade in industrial countries. The serious attention to it in developing countries goes back to recent years. Unfortunately serious attention is not paid to quality issues in building industry. Therefore, the construction of buildings is highly vulnerable against natural events while having low effective lifetime. Wide-range destruction of the residential buildings in the earthquake of Bam ( in IRAN ) is a clear proof for this claim. In this paper we tried to present the corresponding effects between quality issues and other aspects of a building project (such as costs) and proposed general solutions to improve quality indices in construction industry.

  • PDF

Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects (공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안)

  • Baek, Seung-Ho;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.108-114
    • /
    • 2012
  • Escalation method examining the changes in price index has been widely utilized in public construction projects. The previous escalation method determined estimated changes in price based on the average unit price of contract items over a period of time. In relation to this method, the issue has been raised that the fluctuation rates of previous method show different trends compared with other related price indices, as the influence of the small group of contract items with large unit prices overwhelms the others. This research suggested an improved escalation method which estimates the fluctuation rate by examining the changes in CCI (construction cost index) and applies it to the total amount or the partial amount deducted for labor cost in price escalation for previous bid price method. To verify the improvement, a case study is conducted on an educational facility, and the fluctuation rate was estimated in two different base periods (short term, long term). The results over the long term showed similar tendencies to those of related price indices, as well as significant differences in fluctuation rates compared to those of the previous method.

Initial Investment Cost Analysis of Facilities of B2S Track System (B2S궤도시스템의 초기 시설 투입비용 분석)

  • Kim, Hyo-San;Min, Jun-Ho;Ryu, Jae-Kwang;Lee, Dal-Jae
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.733-739
    • /
    • 2011
  • B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

  • PDF

A Study on the Space Size Analysis in the Multifamily Housing in aspect of management cost. -Focused on the Central Heating System using the diesel, kerosene- (공동주택 관리비용에 따른 적정공간규모 산정에 관한 연구 -경유, 등유를 사용하는 중앙집중난방방식을 중심으로 -)

  • 이강희;양재혁
    • Journal of the Korean housing association
    • /
    • v.13 no.5
    • /
    • pp.89-99
    • /
    • 2002
  • The multifamily housing has various advantages in construction cost, land-use intensity. KRIHS(1997) recommended the proper scale of th multifamily housing as 800 households in constructability, 1,000 households in facility compactability, 500 households in social aspect. At the early planning stage of project, the size of the multiftmily housing has, until now, been maximizingly considered under the regulation on which has been emphasized at the building volume ratio, land area, etc., except for the expenditure during the maintenance stage. This paper aimed at providing the proper size of multifamily housing in aspect of area and household number with maintenance cost at the early stage of project. For these, it took 곧 average cost function which is made from the 3-rd quardratic form and analyzes the unit increasing rate of the average cost. It surveyed in nationwide focused on the central heating system using diesel and kerosene. The number of samples is 88 and items of management cost is 11. The results are as follows ; first, 3rd-order quadratic function is proper at explaining the cost variation, considering the multicollinearity and statistics. Second, the proper size of multifamily housing is recommended with 83,000 $m^2$ on management area, 820 or over the 2,630 household number in aspect of total management cost.

A Study on the Basic Procedure of LCC Analysis for the Urban Transit Vehicle (도시철도 차량에서 LCC 분석의 기본 절차에 관한 연구)

  • Chung, Kwang-Woo;Jeon, Young-Seok;An, Joon-Yong;Kim, Chul-Su;Chung, Jong-Duk
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.643-652
    • /
    • 2009
  • This paper presents brief history and a state-of-the-art survey of Life Cycle Cost (LCC) analysis, in particular LCC analysis in the Urban Transit Vehicle, based on a internationl codes and standards related to LCC analysis. A main objective of the LCC analysis is to quantify the total cost of ownership of a product throughout its full life cycle, which includes research and development, construction, operation and maintenance, and disposal. The predicted LCC is useful information for decision making in purchasing a product, in optimizing design, in scheduling maintenance, or in planning overhaul. This paper presents a LCC procedure consisting of seven steps, which are "Problems definition", "Cost elements definition", "System modeling", "Data collection", "Cost profile development", "Evaluation", and "Verification". Sub-activities to be encompassed in the seven steps procedure are described.

  • PDF

Analysis of Economical efficiency for renewable energy in Steam Power Plant (신재생에너지 적용에 따른 화력발전 경제성분석)

  • Choi, Kyoung-Sik
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.1
    • /
    • pp.11-17
    • /
    • 2014
  • Since the Renewable Portfolio Standard (RPS) would be started in 2012, the use of renewable energy should be 11% of total energy use including bio-fuel in 2030. The economic efficiency for renewable energy in B power plant was considered with the bio-diesel, wind power and solar power. The Net Present Value (NPV) and Benefit/Cost Ratio(BC) were used for the economic efficiency with the cost and benefit analysis. In case of bio-diesel, the cost resulted from the fuel conversion and the benefit would be created with trade and environmental improvement. With regard to wind power and solar power, the construction cost would be required and benefit factors would be same as the bio-diesel. The wind power was the best of economic efficiency of renewable energy as the results of NPV and BC ratio. Whereas, the market of wind power was very popular and the techniques of wind power has been developing rapidly.