• 제목/요약/키워드: total construction cost

검색결과 581건 처리시간 0.033초

건축공사 환경관리비 운영체계 비교 분석 (Comparative Analysis of the Environmental Management Cost in Building Construction Sites)

  • 구자건
    • KIEAE Journal
    • /
    • 제10권4호
    • /
    • pp.111-116
    • /
    • 2010
  • The environmental management is essential for construction projects. The environmental management cost for construction projects is used for various purposes to control the environmental pollution and treat the wastes generated from the construction sites. Six construction cases were analyzed to compare the environmental management cost. The proportion of environmental management cost for total construction budget should be higher than 0.70% in redevelopment projects and 0.30% in newly constructed buildings, respectively, but every six construction cases did not meet the legal requirement. Redevelopment projects expanded more environmental management cost than the newly constructed projects especially in noise control and wastes treatment. In case of apartment construction projects, the proportion of environmental management cost of redevelopment buildings is 2.4 times higher than the newly constructed buildings, but in all cases, paid more attention to the noise and waste controlling measures than the wastewater treatment. It is needed to ensure the cost-effectiveness of environmental management for achieving the eco-friendly construction sites.

학교건축의 공사비 분석 및 예측에 관한 연구 (Construction cost Prediction Model for Educational Building)

  • 전용일;황찬수;박태근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.290-295
    • /
    • 2004
  • 사회변화와 더불어 학교건물에도 과거와는 달리 복합화 및 다양화 되어지고 있지만 이에 따른 현실적으로 평가할 수 있는 객관적인 공사비 자료의 분석이 미흡한 실정이다. 특히 발주기관에서는 예산절감과 품질확보 차원에서 객관적이고 합리적인 공사비 관리가 절실히 요구되고 있다. 본 연구에서는 대전광역시교육청에서 발주한 신설학교 설계내역서를 기본자료로 분석하고, 이를 다른 용도의 건물과 비교한 결과 1개교의 평균 건축공사비는 8,017,596천원이고 공사별 분석에서는 건축, 기계설비, 전기 $\cdot$ 통신, 토목 순으로 나타났으며 공종별공사비는 RC공사가 전체공사비의 $30.3\%$를 차지하고 있다. 학교건물 M2당 공사비는 838,000원으로 11개 용도별 중 6번째로 높고 비교대상의 평균값 953,000원 보다는 조금 낮다. 공사비 구성 비율은 비교대상 보다 건축공사 비율은 높게, 기계설비, 전기 $\cdot$ 통신공사 비율은 조금 낮게 나타났다. 연면적에 대한 단순회귀분석을 통하여 총공사비, 공종별공사비, 주요자재량을 예측할 수 있는 모델식을 제시한다.

  • PDF

금속원자재가격의 변동이 건설공사비에 미치는 영향 분석 (A Causal Relationship between Metal Material Prices and Construction Cost)

  • 상준;변정윤;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.137-138
    • /
    • 2012
  • Domestic construction materials market was about 65 trillion won and it occupied 45% level of total construction cost by 2007. In addition, due to the recent rapid rise of crude oil and iron ore price, fluctuation of raw material cost has a great influence to the cost of construction industry. This means that smooth performance is closely related to construction materials. And among them, because of high putting rate of metal materials, it can be seen that the fluctuation of metal material prices is an important variables. So in this study, for the pre-study to analyze the impact of metallic material prices to construction cost, the researcher analyzed a causal relationship between metal material prices and construction cost.

  • PDF

실적 공사비에 의한 예정공사비 산정 전산화 방안 (A Computerized Construction Cost Estimating Method based on the Actual Cost Data)

  • 전재열;조재호;박상준
    • 한국건설관리학회논문집
    • /
    • 제2권2호
    • /
    • pp.90-97
    • /
    • 2001
  • 공공기관에서 발주하는 건설공사의 계약에 있어서 가장 중요한 것은 합리적인 방법으로 결정된 적정한 예정가격을 기준으로 계약을 체결하는 것이다. 적정예정가격을 산정하기 위해서는 먼저 기수행한 실적공사비를 근간으로 하여 건설공사의 다양성과 불확실성을 반영할 수 있는 비용자료의 축적이 선결과제라 할 수 있다. 따라서 본 연구는 실적공사비적산방식에 따라 과거의 가장 유사한 실적자료에 기초한 확률적 비용개념을 도입하여 실적공사비 데이터 베이스 구축 모형과 이를 통한 예정공사비 산정방법 및 전산화 방안을 제시하고자 한다.

  • PDF

설계도서 변경에 의한 실 공사비의 책정에 관한 연구 (The Research About Suitability of The Cost of Work According to The Alteration of Design Literature)

  • 임칠순;이규철
    • 한국건축시공학회지
    • /
    • 제3권3호
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

우리나라의 주택시장구조(住宅市長構造)와 목조주택개발(木造住宅開發) (Housing Market and Opportunities for Wood Frame Housing in Korea)

  • 박문재;김외정;한갑준
    • Journal of the Korean Wood Science and Technology
    • /
    • 제19권3호
    • /
    • pp.45-52
    • /
    • 1991
  • To investigate opportunities for wood frame housing and to activate wood frame house construction, trends of construction activities. preference about housing, and building codes related to wood frame housing were discussed. And two models of wood frame house were developed and construction cost was analyzed to compare with comparative masonry houses. The results obtained were as follows: 1. While 77.8% of people prefer single-family houses, majority of people(74.9%), ironically, possess multi-family houses such as apartments Wood work cost was ratio of 4% of total building cost. while wood material cost accounted merely for 11 % out of total building material cost. 2. Building code was not major barrier to residential house at height under 13m. The building code regulated major structural member and family boder wall of multi-family house to be built with fire retardant material. 3. The proper wood frame house was analyzed of town house or villa type locating in suburban of big city with hot ondol system for the upper middle class. 4 There was no difference in construction cost between western style wood frame house and comparable masonry house, but construction cost for Korean style wood frame house is 27% higher than that of comparable masonry house. It was necessary to reduce materials and cost down by prefabrication technique for both style of wood frame house.

  • PDF

TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발 (Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM)

  • 한승희;박홍태
    • 한국산학기술학회논문지
    • /
    • 제14권3호
    • /
    • pp.1474-1480
    • /
    • 2013
  • 본 연구는 TBM 공법의 구경별 자원기반 적산(원가 계산) 방식에 의한 공사비 적산을 수행하여 직접공사비와 총공사비를 분석하고, 이를 근거로 회귀분석을 수행하여 TBM 공법 구경별 직접공사비 및 총공사비를 추정할 수 있는 개산 공사비(개략 공사비) 예측 식 모델을 제시하였다. 본 연구에서 제시한 TBM 공법의 구경별 개산 공사비 예측 식 모델은 향후 TBM 공법 적용 현장의 사업기획, 예비조사, 타당성조사, 기본설계 단계에서 개산 공사비를 추정하는데 효과적으로 적용할 수 있을 것이다.

관개용수로의 비용분석에 관한 연구 (Cost Comparisou of Conveyance Systems for Irrigation Districts)

  • 최창훈;고재군;박승우;이신호
    • 한국농공학회지
    • /
    • 제27권4호
    • /
    • pp.31-41
    • /
    • 1985
  • This paper compares the estimated total construction and maintenance costs for irrigation canals in six irrigation districts near Pyongtaek. Three conventional canal types were considered: concrete bench flumes, concrete-lined canals, and earth canals. The total expenses for each type were grouped to four catagories: the net construction, land acquisition, maintenance, and other expenses. The construction costs included the assumed costs for conveyance losses from each type of canals. The results from this study support earlier studies that the bench flumes are economically feasible. Initially cheaper conveyance systems like concrete-lined and earth canals demand 'higher maintenance costs and thus, their total expenses are summed to exceed those for the bench flumes within a few years following the construction. Banch flumes are economically justifiable for the main canals of the studying districts. Sensitivity analyses were executed to evaluate the relative importance of each expense to the total cost. The analyses show that total expenses very significantly with the change of the following costs: cost for conveyance losses, net construction, maintenance, and land acquisition, in that order However, other expenses contribute little if not at all to the total. The results indicate that bench flumes should be adopted as main canal structures for most irrigation districts in the Republic.

  • PDF

초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 - (Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok)

  • 강승희;정영수
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.48-56
    • /
    • 2020
  • 기획단계에서의 공사비 예측은 타당성 분석, 예산 책정, 계획수립 등을 위한 기초정보를 제공한다는 점에서 성공적인 프로젝트 수행을 위한 중요한 요소이다. 본 연구에서는 초기 기획단계의 신한옥 공사비 예측 정확도 향상을 목적으로 전체 공사비 중 가장 많은 비중을 차지하는 목공사는 다양한 조건(구조형식, 지붕형태, 평면형태 등)에 의해 개략 물량을 자동 산출하여 공사비를 예측하고, 이외의 공종은 단위단가식을 적용해 공사비를 예측하는 모델을 제시하였다. 2개의 사례를 대상으로 개략 견적 모델로써의 활용성 및 타당성을 검증하였으며, 총공사비의 오차율은 각각 -4%(사례 1), -6%(사례2)로 나타났다. 이러한 결과값은 초기 기획단계에서 실무활용 가능한 범위에서의 오차를 보였다.