• Title/Summary/Keyword: time period

검색결과 15,615건 처리시간 0.041초

보증기기간을 고려한 최적 소프트웨어의 보전정책 연구 (A Study on Optimal Software Maintenance Policies with Warranty Period)

  • 남경현;김도훈
    • 품질경영학회지
    • /
    • 제39권2호
    • /
    • pp.170-178
    • /
    • 2011
  • In general, a software fault detection phenonenon is described by a software reliability model based on a nonhomogeneous Poisson process(NHPP). In this paper, we propose a software reliability growth model considering the differences of the software environments in both the testing phase and the operational phase. Also, we consider the problem of determining the optimal release time and the optimal warranty period that minimize the total expected software cost which takes account of periodic software maintenance(e.g. patch, update, etc). Finally, we analyze the sensitivity of the optimal release time and warranty period based on the fault data observed in the actual testing process.

청주지역 공동주택의 시기별 특성에 관한 연구 (A Study on the Time-periodic Characteristics of Multi-Family Housing in Cheongju)

  • 한조동;이강훈
    • 한국농촌건축학회논문집
    • /
    • 제3권3호
    • /
    • pp.57-67
    • /
    • 2001
  • The evolution of multi-family housing in Cheongju can be divided by four stages which are a introduction period from 1972 to 1980, a popularization period from 1981 to 1989, a expansion period from 1990 to 1997, and a stagnation period after 1998. In the introduction period, the multi-family housings were mainly low-rise buildings because a government policy which focused on extension of the apartments for the low-income influenced multi-family housing constructions. During the popularization period, the multi-family housings were still low-rise but houses in various sizes were introduced. That was because the Housing Site Developments were started and private companies' participations followed them increasingly. As a result of vigorous participations of private companies and massive developments of housing sites, the multi-family housings in the expansion period started to show constructions of complex and trends of high density and high rising. Finally, in the stagnation period, a rate of the supply of the small houses, whose size was below $60m^2$ of exclusive, area was increased and extreme high-rise apartments emerged. High rising and density were the mainstream of the construction concepts. During this period, the growth of multi-family housing marked low. The reason was that a downturn in economy led private companies to shrink their constructions.

  • PDF

복식에 표현된 시대적 이상미 - 르네상스.바로크 시대를 중심으로 - (Ideal Beauty Represented in Dress - Focused on the Renaissance and Baroque Periods -)

  • 신주영
    • 복식
    • /
    • 제58권3호
    • /
    • pp.131-148
    • /
    • 2008
  • Each stylistic period through history has its own unique look. The characteristic look of each period is completed and visualized with its prevailing ideologies, aesthetic consciousness and morality by means of 'form'. A period expresses its characteristics in accordance with form according to the widespread preferences of the time. Among the various cultural factors that form the look of the time, those that the period holds as ideal aesthetic values create the concept of 'ideal beauty' for that period. This study begins by establishing the conceptual definition of 'ideal beauty' and develops the premise that dress reflected ideal beauty. To attain the goal of the study, the selected objects are dresses represented in paintings, the actual garments from the Renaissance to Baroque periods and written references about art, art history, and history of costume. The results, based upon a theoretical study of the zeitgeist and aesthetic values of the 16th and 17th centuries, are as follows: first, ideal beauty influences the substance and form that constitute dress style. It is a byproduct of the spirit of time, the zeitgeist. The concept of ideal beauty is born within the lifestyle pursued by the ruling class and focuses on the body as an epitome of beauty, moral values, custom, lifestyle and taste as it becomes visualized via form. Second, the aspect of dress representing the ideal beauty of particular time varied according to the times. In both periods, power and dignity were used to achieve the ideal aesthetic values. In the Renaissance, power was expressed by the horizontal extension of dress (i.e. wide farthingales and sleeves) and in the Baroque period, by vertical extension (i.e. long and tall wigs, fontanges and trains). It can be said that fashion in both periods achieved an ideal, such as power and dignity, via the same means, by extending dress sizes, but the ways in which those ideals were portrayed in each period's dress yielded very contrary styles. It is understood through this study that ideal beauty influenced the dress style of the Renaissance and Baroque periods and played a decisive role in determining its forms and symbolic meanings.

강우자료의 비정상성을 고려한 재현기간 변화에 관한 연구 (A Study on the Changes of Return Period Considering Nonstationarity of Rainfall Data)

  • 신홍준;안현준;허준행
    • 한국수자원학회논문집
    • /
    • 제47권5호
    • /
    • pp.447-457
    • /
    • 2014
  • 본 연구에서는 초과확률 또는 비초과확률이 시간에 따라 변화한다는 비정상성을 가정하여 재현기간 산정에 대한 연구를 수행하였다. 비정상성을 고려한 2가지 재현기간 산정 방법에 대해 검토하고 비정상성 Gumbel 모형을 이용한 빈도해석을 수행하여 초과확률및 비초과확률을 구한 뒤비정상성을 고려한 재현기간 정의에따른 우리나라 재현기간의 변화에 대해서 살펴보았다. 적용 대상으로는 자료기간 30년 이상을 보유하면서 일 강우 자료의 경향성이 나타나는 서귀포, 인제, 제천, 구미, 문경, 거창 등 6개 지점을 선정하였다. 적용결과 비정상성을 고려한 재현기간 산정 시 기존의 재현기간 산정방법과는 재현기간이 다르게 산정됨을 알 수 있었고, 재현기간이 커질수록 정상성 가정하의 재현기간과 비정상성 가정하의 재현기간 값의 차이가 더 커지는 것으로 나타났다. 또한 비정상성을 고려한 재현기간의 2가지 정의 중 기대 대기시간(expected waiting time) 정의에 의한 방법이 기대 초과사상 수(expected number of exceedance event) 정의에 의한 방법보다 작은 재현기간이 산정 되었다.

정기용선계약의 최종항해에 대한 사례연구 (A Case Study on Final Voyage of the Time Charter)

  • 여성구
    • 한국항만경제학회지
    • /
    • 제21권4호
    • /
    • pp.75-101
    • /
    • 2005
  • Every time charter must have a final terminal date, that is a date by which the charterer is contractually obliged to redeliver the vessel. Where the law implies a margin or tolerance beyond an expiry date stipulated in the charter party, the final terminal date comes at the end of such implied extension. When the parties have agreed in the charter party on the margin or tolerance to be allowed, the final terminal date comes at the end of such agreed period. But the nature of a time charter is that the charter is for a finite period of time and when the final terminal date arrives the charterer is contractually bound to redeliver the vessel to the owner References to delivery and redelivery are strictly inaccurate since the vessel never leaves the possession of the shipowner, but the expression are conventionally used to describe the time when the period of the charter begins and ends. The legitimacy or otherwise of what is to be regarded as a vessel's final voyage must be judged at the time when the charterers give an order for the vessel to carry out the voyage in question, and then by reference to what they order her to do. The purpose of this paper aims to analyse cases on the final voyage of time charter, and specially to explore implications of the final voyage in time charter through the Gregos case.

  • PDF

조선시대 화성성역의 공정관리 사례분석 (A Case Analysis on the Time Management of the HwaSung Construction Project in Choseon Dynasty)

  • 김균태
    • 한국건축시공학회지
    • /
    • 제8권6호
    • /
    • pp.139-145
    • /
    • 2008
  • The objective of this paper is to analyze the construction management capacity of Choseon Dynasty and suggest a new interpretation on the construction capacity of the time management by reviewing the time management case during a representative construction project, HwaSungk construction project implemented in the latter period of Choseon Dynasty around 200 years ago. which was described in HwaSungSungYoukEuGye. The analysis results of the time management capacity during the latter period of Choseon Dynasty depicted in the HwaSungSungYoukEuGye is summarized as follows: (1) It took 2 years and 6 months to complete the Hwasung construction project. However, all of the single buildings were constructed within 6 months, a relatively short period of time. Judging from the fact, it can be assumed that the construction techniques using wood of the time were very sophisticated. (2) When the HwaSung was constructed, it took a relatively short period of time to complete works from placing the foundation to erecting columns and to placing a crossbeam on the columns. Based on the fact, it can be also inferred that assembly processing techniques of the time were also sophisticated and the level of member processing and assembling techniques of the time was considerably good as well. (3) The HwaSung construction was continued throughout the year without any influence by weather conditions, which tells us that division of labor by work was performed, and it was possible to mobilize labor force for the construction project even during the busy farming seasons.

CISG상 매도인의 부가기간지정권과 계약해제권에 관한 외국중재판정사례 연구 (A Study on Foreign Arbitral Awards related to Seller's Notice Fixing Additional Final Period for Performance and Right to Avoid the Contract under the CISG)

  • 이기섭;안건형
    • 무역상무연구
    • /
    • 제42권
    • /
    • pp.163-186
    • /
    • 2009
  • On April 11, 1980, the "United Nations on Contracts for the International Sale of Goods" ("CISG") was prepared by the United Nations Commission on International Trade Law (UNCITRAL) and approved by a diplomatic conference in Vienna providing uniform law for international sales of goods. It took effect as of March 1, 2005, in Korea. It is set forth on the seller's remedies for breach by the buyer Section III (Art. 61 - 65) under the CISG. In this study, the focus is only on the seller's notice fixing additional final period for performance (Art. 63) and the right to avoid the contract (Art. 64), with examination on some relevant foreign arbitral awards rendered by the ICC and the CIETAC together. Article 63 provides that the seller may fix an additional period of time for reasonable length for performance by the buyer of his obligation. It was found from the above arbitral awards that the concept of 'reasonable length' should be decided on a case-by-case basis, given the specific circumstances in the case [Art. 63(1)]. It is provided that unless the seller has received a notice that he will not perform within the period so fixed, the seller may not, during that period, resort to any remedy for breach of contract in accordance with Article 63(2). Article 64(1) provides the means and grounds for avoidance of the contract, which can be avoided 1) when the breach of the buyer amounts to a fundamental breach of contract, or 2) when the additional period of time is fixed by the seller, unless the buyer declares that he will not perform so within the period of fixed time. As we examined in the above arbitral awards, it was held that the contract is avoided when the seller sends the final notice stating that he will avoid the contract, after the expiration of the additional period of time fixed by the seller in the ICC award. On the contrary, it was held that the contract should be deemed to be avoided exactly when the expiration of additional period noted in the avoidance notice is elapsed in the CIETAC award. Article 64(2) sets time limits for avoidance.

  • PDF

간접구(間接灸)의 제품별(製品別) 입열기(入熱期) 연소특성(燃燒特性)에 관한 연구(硏究) (The experimental study on the Characteristics of the Moxa-Combustion in the input period of indirect moxibustion)

  • 하치홍;조명래;채우석;박영배
    • Journal of Acupuncture Research
    • /
    • 제17권1호
    • /
    • pp.89-105
    • /
    • 2000
  • In order to obtain the clinical data on the different effects of the three different methods of indirect moxibustion, moxa-combustion time, peak temperature, average temperature, maximum gradient temperature, average gradient temperature, and moxa-combustion calorie rate of the input period in ARIRANG, JANG, PUNG were measured through this experiment. The results of the experiment were as follows : 1. In the combustion time, during the input period ARIRANG had the longest combustion time followed by PUNG, JANG in a descending order but these were not acknowledged to have significant difference each other. 2. In the peak temperature of the input period, PUNG had the highest temperature followed by ARIRANG, JANG in a descending order. ARIRANG and JANG were acknowledged to have significant difference with PUNG. ARIRANG and JANG however were not acknowledged to have difference each other. 3. In the average temperature, during the input period, PUNG had the highest temperature followed by JANG, ARIRANG in a descending order. ARIRANG and JANG were acknowledged to have significant difference with PUNG. ARIRANG and JANG however were not acknowledged to have difference each other. 4. In the maximum gradient temperature, during the input period, PUNG had the highest temperature followed by ARIRANG, JANG in a descending order. ARIRANG and JANG were acknowledged to have significant difference with PUNG. ARIRANG and JANG however were not acknowledged to have difference each other. 5. In the average gradient temperature, during the input period, PUNG had the highest temperature followed by ARIRANG, JANG in a descending order. ARIRANG and JANG were acknowledged to have significant difference with PUNG. ARIRANG and JANG however were not acknowledged to have difference each other. 6. In the moxa-combustion calorie rate, during the input period, JANG had the highest temperature followed by ARIRANG, PUNG in a descending order. ARIRANG and PUNG were acknowledged to have significant difference with JANG. ARIRANG and PUNG however were not acknowledged to have difference each other.

  • PDF

CMMS(Computerized Maintenance Management System)의 실 시간적인 CBMS(Condition Based Maintenance System) 연구 (Development of CMMS for the real-time CBMS)

  • 박주식;박재현;강경식;이광배
    • 대한안전경영과학회지
    • /
    • 제2권4호
    • /
    • pp.1-8
    • /
    • 2000
  • Equipment and machine of industrial plant are give effect to mechanical-stress of many working-stop or long time operating. Therefore, to be old and decrepit of every king of equipment. As long time operating equipment period into increase conservation and of repair equipment time is efficacious necessity of utility factor gradually that of productivity of diminution and complete equipment expense of increase. Conservation at special skill working and necessity is that will effectually and complete a period prevention management diagnosis can conservation point at issues at in advance.

  • PDF

New Driving Method for Fast Addressing of AC-Plasma Display Panel

  • Kim, Gun-Su;Choi, Hoon-Young;Lee, Seok-Hyun;Seo, Jeong-Hyun
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 한국정보디스플레이학회 2003년도 International Meeting on Information Display
    • /
    • pp.726-729
    • /
    • 2003
  • A new driving method is proposed to reduce the address period. The scan time of new driving method overlaps with the next scan time during the discharge lag time. Thus, without reducing the address pulse width and the scan pulse width, the new addressing method can reduce the address period. The results show that the scan time of about 100ns ${\sim}$ 300ns can be overlapped without the misfiring,.

  • PDF