• Title/Summary/Keyword: test

Search Result 128,955, Processing Time 0.098 seconds

The design of C-GIS and the analysis of its Performance test results (C-GIS의 설계 및 성능평가 결과분석)

  • Shin, Y.J.;Kim, M.H.;Ryu, H.K.;Lee, Y.H.;Kim, C.H.;Kim, J.K.;Kim, K.S.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.551-553
    • /
    • 2002
  • The cubicle type GIS rated at 25.8kV has been designed and manufactured by Jinkwang E&C eacently with their own technologies and KERI's assistances. The C-GIS has been tested to check the design capability for reference before conducting the type test. The operating characteristics test, short time withstand current and peak withstand current test, basic short circuit test duty T60 for preconditioning test, cable charging current switching test, capacitor bank current switching test, basic short circuit test duty T100s and T100a, single phase earth fault test, double earth fault test has been conducted. The test results show that the design and the manufacturing of the C-GIS has an enough capability to pass through the type test except the occurrence of 2 NSDDs in the cable charging current switching test and the instability of opening time at the minimum operating voltage. The problems shown in the tests will be improved soon and the successful pass will be expected in the following type test.

  • PDF

The Action of the Reliability Enhancement in Test and Evaluation of the Weapon Systems (무기체계 시험평가의 신뢰성 향상방안)

  • Park, Jong Wan
    • Journal of Applied Reliability
    • /
    • v.15 no.2
    • /
    • pp.108-123
    • /
    • 2015
  • Test and Evaluation (T&E) have been verifying the level of it's technological skill and the needed operational status of the development weapons. If the overall spectrum of test and evaluation is fulfilled substantially in the production & deployment, the needed level of the weapon system will be enhanced and also the reliability status will become higher considerably. We can know currently these issues through the mass media and all kinds of the news regarding the defense industry and programs. And so this article have studied the method of enhancing reliability of the test and evaluation, the 6 variables were selected through the discussion of the professional group. The the test and evaluation group needs consistently the professional training systems. After DT&E, we have to the event to verify the technical level of the development systems. We have to take the high level of the kinds of the environmental test. Scientific methods like system engineering will be adapted in process of the test and evaluation. The number of suitable test prototype in the test and evaluation is analysed more systematically. And we need to establish the standardization of the test and evaluation. If 6 variables are well analysed and adapted in the working field, the reliability of the test and evaluation will be considerably, the defense industry will take the chance to develope the future-oriented.

Test Process Execution Tool: Test PET (테스트 프로세스 수행 도구)

  • 천은정;최병주
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.10 no.2
    • /
    • pp.125-133
    • /
    • 2004
  • In order to test reflecting the features of a development methodology and domain, it is required to tailor process standards and perform testing according to the tailored process. However, since commercial testing tools support only a part of the tailored process, it is essential to either acquire or develop testing tools appropriate for a development environment. This paper proposes a method to develop a test process execution tool which has common features of standards, and variousness in methodologies and domains. ‘Test Process Execution Tool: Test PET’ which is a test process execution tool developed adapting the concept of product line. Our Test PET generates the test process suitable for the development methodology and domain and then executes the produced test process.

Data Processing Method of Radar Processor Unit Test Equipment (레이다처리장치 시험장비의 데이터 처리방안)

  • Lee, Mincheol;Kim, Yong-min
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.6
    • /
    • pp.767-775
    • /
    • 2018
  • To develop and check a Radar Processor Unit, checking the function and performance of the requirement is very important factor in developing Radar. General methods for verifying the Radar is simulation test, environment linkage test and field operation test, firstly, in case of requirement analysis phase, verify Radar algorithm and design by using mathematical method based simulation test method, and secondly, in case of unit test and integrated test phase, Test Equipment is set to simulate radar environment in the lab to verify radar function and performance. Lastly, field operation test phase is carried out to confirm the function and performance after it is mounted on the actual equipment. To successfully develop Radar Processor Unit, using the method of field operation test method after sufficient test cases are tested in radar environmental interlocking method in order to save cost and testing period and because of this reason, development of the Radar Processor Unit Test Equipment is becoming very important factor. In this paper, we introduce the concept of test equipment development and important factors in test equipment, which are target simulation, data processing and device interlocking.

Effective Sample Sizes for the Test of Mean Differences Based on Homogeneity Test

  • Heo, Sunyeong
    • Journal of Integrative Natural Science
    • /
    • v.12 no.3
    • /
    • pp.91-99
    • /
    • 2019
  • Many researchers in various study fields use the two sample t-test to confirm their treatment effects. The two sample t-test is generally used for small samples, and assumes that two independent random samples are selected from normal populations, and the population variances are unknown. Researchers often conduct F-test, the test of equality of variances, before testing the treatment effects, and the test statistic or confidence interval for the two sample t-test has two formats according to whether the variances are equal or not. Researchers using the two sample t-test often want to know how large sample sizes they need to get reliable test results. This research gives some guidelines for sample sizes to them through simulation works. The simulation had run for normal populations with the different ratios of two variances for different sample sizes (${\leq}30$). The simulation results are as follows. First, if one has no idea equality of variances but he/she can assume the difference is moderate, it is safe to use sample size at least 20 in terms of the nominal level of significance. Second, the power of F-test for the equality of variances is very low when the sample sizes are small (<30) even though the ratio of two variances is equal to 2. Third, the sample sizes at least 10 for the two sample t-test are recommendable in terms of the nominal level of significance and the error limit.

Introduction to Daegwallyeong Wind Turbine Test Site and Field Test Study (대관령 풍력실증단지 및 실증연구 소개)

  • Yoo Neung-Soo;Nam Yun-Soo;Lee Jung-Wan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.5-8
    • /
    • 2005
  • This paper aims to introduce the Daegwallyeong wind turbine test site which is the first official wind turbine test site in Korea. The current status of test site, the characteristics, the projects performed and future plan of this test site are described. The results of wind condition measurements and monitoring system established by the Kangwon National University are presented. The importance of field test is also commented.

  • PDF

A generalized Hollander-Proschan test for NBUE alternative based on U-statistics approach

  • Hassan, M.KH.
    • International Journal of Reliability and Applications
    • /
    • v.16 no.2
    • /
    • pp.113-122
    • /
    • 2015
  • In this paper, we introduce U-statistics approach to generalized Hollander-Proschan test for new better than used (NBUE) alternative. We prove, the proposed test is equivalent to test was introduced by Anis and Mitra (2011) and includes test was introduced by Hollander Proschan (1975). Also, the asymptotic properties are studied. The powers of our test are estimated. The Pitman asymptotic efficiencies of proposed test are also calculated. Finally, the test is applied to some real data.

Influence of Compressive Strength of Concrete Affected by fixed test Specimens and moved test Specimens (운반된 공시체가 콘크리트의 압축강도에 미치는 영향)

  • 조일호;양재성;김성욱
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.957-960
    • /
    • 2000
  • The purpose of this study was performed to estimate the influence of compressive strength of the concrete according to change test specimens of concrete were investigated by measurements of slump, air content and compressive strength. As a result, according to moved test specimens, the compressive strength, fiexed test specimens effected on Concrete compressive strength, test specimens than moved test specimens, increased 4∼10% fixed test specimens, 2∼9% moved test specimens.

Construction and Start-up Test of Hot-firing Test Facility for KSLV-II Combustion Chamber (한국형발사체 연소기 연소시험설비의 구축 및 시운전)

  • Lee, Kwang-Jin;Yi, Seung Jae;Seo, Daeban;Hwang, Chang Hwan;Woo, Seongphil;Im, Ji-Hyuk;Jeon, Junsu;So, Younseok;Kim, Chae-Hyoung;Kim, Sunghyuk;Kim, Seung-Han;Cho, Namkyung;Han, Yeoung Min
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.20 no.1
    • /
    • pp.69-75
    • /
    • 2016
  • This paper covers the result of construction and start-up tests of the KSLV(Korea Space Launch Vehicle)-II combustion chamber hot-firing test facility. This facility was constructed from 2012 to 2014. Start-up test of this facility began in the second half of 2014. Oxidizer cold flow test, fuel cold flow test and cooling water cold flow test were carried out as start-up test. Afterward, ignition test of combustion chamber was accomplished. The result of ignition test is applied to set up start-up sequence of KSLV-II combustion chamber and utilized as base line data for hot-firing test of low and normal design point.