• Title/Summary/Keyword: system upgrade

Search Result 520, Processing Time 0.05 seconds

A Case Study on the Successful Post-implementation of Enterprise Resource Planning System (ERP 시스템의 구축 후 운영 성공에 관한 사례 연구)

  • 황재훈
    • Journal of Information Technology Applications and Management
    • /
    • v.10 no.1
    • /
    • pp.61-70
    • /
    • 2003
  • Many enterprises have implemented packaged enterprise resource planning (ERP) solutions rather than system development on the promises of feasible strategic benefits. Typical feasible benefits include adoption of global standards and processes through a proven integrated system, continuous version upgrading by vendors, and thus the easiness of system maintenance. The objectives of this research are to identify what makes a post-implementation success of ERP system and to figure out the critical issues and factors for the successful upgrade of packaged ERP systems. This case study was conducted based on five different organizations that have experienced system upgrade implementation. Success factors of ERP system upgrade include (1) clear statement of upgrade goals, (2) good coordination and communication among the implementation partners, (3) thorough management of customization and maintenance history including documentation, (4) Planning of system requirements of higher version, and (5) redefinition of role between business departments and IT department.

  • PDF

Structural health monitoring of the Jiangyin Bridge: system upgrade and data analysis

  • Zhou, H.F.;Ni, Y.Q.;Ko, J.M.
    • Smart Structures and Systems
    • /
    • v.11 no.6
    • /
    • pp.637-662
    • /
    • 2013
  • The Jiangyin Bridge is a suspension bridge with a main span of 1385 m over the Yangtze River in Jiangsu Province, China. Being the first bridge with a main span exceeding 1 km in Chinese mainland, it had been instrumented with a structural health monitoring (SHM) system when completed in 1999. After operation for several years, it was found with malfunction in sensors and data acquisition units, and insufficient sensors to provide necessary information for structural health evaluation. This study reports the SHM system upgrade project on the Jiangyin Bridge. Although implementations of SHM system have been reported worldwide, few studies are available on the upgrade of SHM system so far. Recognizing this, the upgrade of original SHM system for the bridge is first discussed in detail. Especially, lessons learned from the original SHM system are applied to the design of upgraded SHM system right away. Then, performance assessment of the bridge, including: (i) characterization of temperature profiles and effects; (ii) recognition of wind characteristics and effects; and (iii) identification of modal properties, is carried out by making use of the long-term monitoring data obtained from the upgraded SHM system. Emphasis is placed on the verification of design assumptions and prediction of bridge behavior or extreme responses. The results may provide the baseline for structural health evaluation.

A Study on the Requirements Analysis and Design for System Development of Remote Firmware Upgrade Management System Based-on AMI (AMI 기반 원격 펌웨어업그레이드 시스템 개발을 위한 요구분석 및 설계에 관한 연구)

  • Jung, Nam-Joon;Yang, Il-Kwon;Choi, Seong-Hwan;Jin, Young-Taek
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.1
    • /
    • pp.155-161
    • /
    • 2012
  • The firmware upgrade, which is remotely performed, is an essential function in smart metering or AMI (Advanced Metering Infrastructure). In other words, the AMI software and firmware can be switched for maintaining and improvement without replacement of H/W devices in AMI environment. Also, if number and type of devices are increase, the demand of remote update service will be increased. Through the firmware upgrade service remotely, the electric power corporation may be able to benefit various fields. For example, there are to adapt more easily in many environments, real-time service and to cut maintenance costs. In this paper, we proposed to design an international level FUMS(Firmware Upgrade Management System) which includes requirement function, architecture and protocol related with DCU, Smart Meter.

Study on the upgrade reliability of inkjet droplet measurement using machine vision (머신비젼을 이용한 잉크젯 드랍 측정 시스템의 신뢰성 향상에 대한 연구)

  • Kim, Dong-Eok;Lee, Jun-Ho;Jeong, Seong-Uk
    • Proceedings of the Optical Society of Korea Conference
    • /
    • 2007.07a
    • /
    • pp.365-366
    • /
    • 2007
  • Micro jetting drop inspection system is essential to measuring micro drop volume. Measuring pico-liter drop volume is useful for new LCD color filter product process that is based on inkjet printing technology. To upgrade the reliability in drop measurement system, we use the auto focusing & multi drop reiteration & blurring average algorism. First of all we used standard mark for gage R&R in the vision system. Finding the most suitable threshold for multi blurring drop, is the main key of this research. Sensitivity of vision system is a standard in measuring the upgrade system level. So, suitable threshold can upgrade the performance of jetting drop inspection system.

  • PDF

The Potential to Upgrade the Thai Innovation System by University- industry Linkages

  • Schiller Daniel
    • Journal of Technology Innovation
    • /
    • v.14 no.2
    • /
    • pp.67-91
    • /
    • 2006
  • This paper discusses the potential to upgrade the Thai innovation system by university-industry linkages. Our results are structured into three parts. First, the identification of potentials for university-industry linkages (UIL) within the Thai innovation system shows that the re is a wide gap between absorptive capacities of private companies and knowledge production of universities. Second, we present survey results for individual departments at Thai universities showing that UIL are mostly limited to consulting and technical services, hampered by mutual distrust, and maintained to receive an extra personal income. Third, case studies on four typical modes of UIL allow us to discuss various ways to upgrade the Thai IS by UIL in future.

  • PDF

Implementation of Gigabit Ethernet Line Interface Controller using Network Processor (네트워크 프로세서를 이용한 기가비트 이더넷 라인 정합 제어기 구현)

  • 김용태;이강복;이형섭
    • Proceedings of the IEEK Conference
    • /
    • 2002.06a
    • /
    • pp.359-362
    • /
    • 2002
  • In this paper, we propose a structure of 800bps high speed router and a gigabit Ethernet line interface board. Having Programmability, network processor is applied to gjgabit Ethernet line interface board. Also, we propose a new method to upgrade image files that consist of operating system and drivers. It is possible to upgrade image files for several boards at once and to reduce the elapsed time for image upgrade using tile proposed method.

  • PDF

A Design of the Improved Data Conversion Process for System Upgrade Project

  • Kim, Hee Wan
    • International journal of advanced smart convergence
    • /
    • v.10 no.2
    • /
    • pp.187-193
    • /
    • 2021
  • Data conversion refers to the process of extracting the data existing in the existing system, that is, the past data accumulated by the old information system or other methods and transferring it to the improved table of the new system. The person in charge of data conversion refers to the entire process of converting to the final destination table according to the rules designed/planned in advance. In most cases, data conversion design should be consider when the old system replace or the data of another existing system is converted and applied to a newly constructed information system. The goal of data conversion is to understand the current database system of operating environment, understand the characteristics of the DBMS in use, maintain the optimal database structure, and make the new system perform at its best. Data conversion methods are largely divide into a method using a tool and a conversion method using a program preparation. In this paper, we examine the advantages and disadvantages of the data conversion method, and try to derive the problems of the existing data conversion method. Based on this, an improved data conversion method for the system upgrade project was proposed, and verified through a questionnaire of an IT expert to prove its effectiveness

KF-16 Software Upgrade Cost Analysis (KF-16 항공기 SW성능향상사업 비용분석)

  • Min, Sung Ki;Lee, Cheol Woo;Dalton, Carl
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.2 no.1
    • /
    • pp.18-23
    • /
    • 2006
  • The purpose of this study and report is to provide, to the MND, an independent cost analysis of modernizing software of F-16 fighter fleets to support the use of several weapon system options, including JDAM, AIM-9X and HARM Targeting System etc. The study analyzed each options with software sizing, software cost, enabling hardware cost, flight test cost, system engineering cost, and 3 strategies. And the study proposed and analyzed some alternative strategies: strategy1 is to modernize software only within existing electronic processing capability; strategy2 is a full upgrade of weapons avionics with plug compatible electronics; strategy3 is an approach defined to mirror the USAF Common Configuration Implementation Approach (CCIP). The recommended alternative is strategy2.

  • PDF

A Study of the linear accelerator electron gun upgrade for system design (선형가속기 Upgrade 전자총 시스템설계에 관한 연구)

  • Son, Yoon-Gyu;Park, Sung-Ju;Kim, Kyung-Ryul;Nam, Sang-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1373_1374
    • /
    • 2009
  • The PLS-II, the major upgrade program of the PLS (Pohang Light Source, a 2.5-GeV 3rd generation light source), is planned at the Pohang Accelerator Laboratory. Given the glaring lack of normative data regarding the PLS-II the major upgrade, this study can be seen as the first in a needed stream of research investigating selection by dual gun and dc electron gun. Usable electron gun can think method to use dual electron gun and method to prove energy by existing electron gun in energy increase. This article is concerned with the formal classification of used of pre-injector electron gun type of the DC and pulse. Design concept wishes to show contents that design for pulse type of power supply and DC type of electron gun.

  • PDF