Kang, Ki-Ho;Jang, Chnag-Lae;Lee, Gi Ha;Jung, Kwansue
Journal of Korea Water Resources Association
/
v.49
no.8
/
pp.693-705
/
2016
In this study, the effects of sediment supply on the downstream of a large dam are investigated using a numerical model. The model simulation shows a good agreement with laboratory experiment results of sediment transport and diffusion from sediment pulses. The water surface changes from the various sediment bed elevations are also simulated using the model. The site which has a relatively stiff bed slope and meandering of a channel is selected as an appropriate location for sediment supply because of its shear stress enough to supply the sediment downstream. The model simulation shows the decrease of channel bed elevation through the simulation period with time. The well-deposition of sediment supplied from the downstream of dam is found in the location where the flow rate is relatively low. A bed relief index is increased with time and it is relatively greater in downstream compared to upstream. The channel bed variability increases as flow rate increases with a greater bed relief index. The results of this study demonstrate the importance of increasing water discharge of a large dam to increase the dynamic of channel bed and thus to enhance the efficiency of channel bed restoration by sediment supply.
The seasonal patterns of sediment supply were investigated during the period of June 1999 to June 2000 on a coastal foredune of Seungbong Island, Korea. Sediment supply was determined from measurements of geomorphic changes in the foredune and beach along six lines. Most sands were deposited on the dunefoot and foredune area during the winter and spring, from November to April. The largest amount of sands was deposited along the lines 5 and 6 near the sea-dike in the southern tip of the dune area. In general, the sand on the beach was gradually eroded in spring, summer and fall but deposited in winter. Total sediment accumulation over the study period was $484m^3$ for the foredune and $345m^3$ for the beach. The volume of the foredune increased in the winter and spring, whereas the volume of beach increased in the winter. Variation in sediment deposition appears to be controlled primarily by variations in the seasonal wind regime.
Proceedings of the Korea Water Resources Association Conference
/
2011.05a
/
pp.17-17
/
2011
As a method of countermeasure to bed degradation and armoring phenomena of bed material in the downstream area of dam reservoirs, sediment augmentation (replenished sediment) has been carried out in many Japanese rivers. In general, bed of the replenished sediment site is composed of rocks, because the site is located in the downstream area of the dams and sediment supply is very small. Bed deformation process has been researched by many researchers. As a method of countermeasure to bed degradation and armoring phenomena of bed material in the downstream area of dam reservoirs, sediment augmentation (replenished sediment) has been carried out in many Japanese rivers. In general, bed of the replenished sediment site is composed of rocks, because the site is located in the downstream area of the dams and sediment supply is very small. Bed deformation process has been researched by many researchers. However, most of them can treat movable bed only and cannot be applied to the bed deformation process of sediment on rocks. If the friction angle between the sediment and the bed surface is assumed to be the same as the friction angle between the sediment and the sediment, sediment transport rate must be smaller without sediment deposition layer on the rocks. As a result, the reproduced bed geometry is affected very well. In this study, non-equilibrium transport process of non-cohesive sediment on rigid bed is introduced into the horizontal two dimensional bed deformation model and the model is applied to the erosion process of replenished sediment on rock in the Nakagawa, Japan. Here, the Japanese largest scale sediment augmentation has been performed in the Nakagawa. The results show that the amounts of the eroded sediment and the remained sediment reproduced by the developed numerical model are $56300m^3$ and $26800m^3$, respectively. On the other hand, the amounts of the eroded sediment and the remained sediment measured in the field after the floods are $56600m^3$ and $26500m^3$, respectively. The difference between the model and field data is very small. Furthermore, the bed geometry of the replenished sediment after the floods reproduced by the developed model has a good agreement with the measured bed geometry after the floods. These results indicate that the developed model is able to simulate the erosion process of replenished sediment on rocks very well. Furthermore, the erosion speed of the replenished sediment during the decreasing process of the water discharge is faster than that during the increasing process of the water discharge. The replenished sediment is eroded well, when the top of the replenished sediment is covered by the water. In general, water surface level is kept to be high during the decreasing process of the discharge during floods, because water surface level at the downstream end is high. Hence, it is considered that the high water surface level during the decreasing process of the water discharge affects on the fast erosion of the replenished sediment.
The purpose of this study is to estimate the sediment volume concentration of the liquified-solid mixture which is included fine sediment fractions, according to the variance of the channel slope and the water supply. The numerical model was performed by using the Finite Differential Element Method (FDM) based on the equation for the mass conservation, momentum conservation and the equation of coarse sediment an fine sediment. In comparison of varying the channel slope, the deeper the channel slope, the inflection point of the sediment concentration was occurred rapidly. In comparison of variance of the water supply, as the water supply increases fluctuation with high sediment concentration. In this situation, debris flow changes to the turbulent flow and the sediment becomes to be floated. In comparison varying the length paved saturated sediment, the longer the length, the high concentration of sediment occurred, for the safety of the slope it is needed to check the possibility of the erosion in the slope by debris flow. The results of this study will provide useful information in predicting of the disaster by the liquified-solid mixture and in prevention of the debris flow with various the slope in the mountain side.
This paper focuses on the depositional processes and environmental changes during initial marine flooding recorded in the lower Cambrian succession of the North China Platform in Shandong Province, China. In order to understand imbalance of accommodation and sediment supply in the initial stage of basin-fill, a detailed analysis of sedimentary facies was made for the lowermost siliciclastic deposits of the Liguan Formation. It reveals ten siliciclastic lithofacies in three large-scale outcrops (Jinhe, Anqianzhuang, and Zhangjiapo sections). These facies are grouped into four facies associations, representing siliciclastic foreshoreshoreface (S1), siliciclastic offshore (S2), distributary mouth bars (S3), and coastal plain (S4). The siliciclastic components occur in a linear belt, emanating from a major drainage system in the northeastern part of the platform. Deposition of siliciclastic sediments was largely controlled by regional topography of the unconformable surface and shoreline configuration as well as strong effect of waves and currents. With ensued rise in sea level and decrease in siliciclastic sediment supply, carbonate sediments prevailed, filling the accommodation created by epeirogenic subsidence and sediment loading.
The objective of this study Is to supply basic data for large reservoir sedimentation research In future and make suggestions to maintain and opera능 the reservoir more of efficiently. At first, previous studios about the estimation of sediment yield rate were reviewed in Korea. And the discharge rating curves of upstream stage gauging stations and the correlation between dam Inflow and stage discharge were analyzed. With the analysis results, the spec유c sediment rate of Soyanggang dam was estimated as 608 m3/km2/yr. It was similar to that of Soyanggang dam feasibility study and 1994's field surveys of the reservoir than that of 1983's field surveys. Because the sediment rating curves were derived under the low discharge conditions, It needs to be checked under the flood conditions. However, the suggested methods such as flowrate analysis and sediment estimation will be useful to the sediment studios In future. Key words . reservoir sediment, sediment yield rate, rating curve, flowrate analysis.
Journal of The Geomorphological Association of Korea
/
v.28
no.1
/
pp.13-33
/
2021
Successful sediment management at the watershed scale requires an understanding of the erosion, transport and sedimentation processes at the specific site scale. However, studies on the sediment runoff characteristics in a small uppermost watershed, which serves as a sediment supply function, are very rare. Therefore, this study attempted to investigate the fluctuations in major sediment supply areas and sediment runoff in the uppermost mountain small watershed, and for this purpose, ArcSWAT (Soil and Water Assessment Tools with GIS interface) was applied to the Woldong reservoir catchment located in Gosam-myeon, Anseong-si, Gyeonggi-do. The model results were manually calibrated using the monitoring data of the Woldong reservoir sedimentation rate from 2005 to 2007. It was estimated that annual average of 34.4 tons/year of sediment was discharged from the Woldong reservoir basin. This estimate almost coincided with the monitoring data of the Woldong reservoir during the low flow period but tended to be somewhat underestimated during the high flow period. Although the SWAT model does not fully reflect the erosion process of gully and in-channel, this underestimation is probably due to the spatial connectivity of sediment transport and the storage and reactivation of the sediment being transported. Most of the forested hillslopes with a well-developed organic horizon were evaluated as having a low risk of erosion, while the places with the highest risk of erosion were predicted to be distributed in the logged area with some weeds or shrubs (classified as pasture) with relatively steeper slopes, and in the bare land. The results of this study are expected to be useful in developing strategies for sediment control and reservoir management.
This study dealt with a systematic approach for sediment replenishment works which defines the artificial supply of coarse sediment to downstream river channels of dams. That is an increasing practice in Japanese, American and European rivers for the purpose of compensating sediment deficits downstream and rehabilitating geomorphological habitats below dams. We introduced five main objectives of the sediment replenishment, simply from construction of artificial spawning redds for anadromous fish to restoration of fluvial geomorphological process of river system. Then we suggested determination of sediment size distribution and quantity of coarse sediment as well as selecting an effective implementation method in corresponding to specific objectives and local restrictions in the basin, reservoir and river.
With 9 existng reservoirs selected in the Sab-Gyo River Basin, the sedimentation of the reservoirs has been calculated by comparing the present capacity with the original value, which revealed its reduced reservoirs capacity. The reservoirs has a total drainage area of 6,792 ha, with a total capacity of 1,204.09 ha-m, and are short of water supply due to reduction of reservoirs capacity. Annual sedimention in the reservcire is relation to the drainage area, the mean of annual rain fall, and the slop of drainage area. The results of obtained from the investigation are summarized as follow; (1) A sediment deposition rate is very high, being about $9.19{m}^3/ha$ of drainage area, and resulting in the average decrease of reservoir capacity by 19.1%. This high rate of deposition could be mainly attributed to the serve denvdation of forests due to disor derly cuttings of tree. (2) An average unit storage of 415.8mm as the time of initial construation is decreesed to 315.59mm at present, as resultting, we could'nt supply water at 566.24ha. (3) A sediment deposition rate as a relation to the capacity of unit drainage area is as follow; $Qs=1.43 (c/a)^{0.531}$ (4) A sediment deposition rate as a relation to the mean of annval rainfall is as follow; $Qs=672.61 p^{0.024}$ (5) A sediment deposition rate as a relation to the mean slop of drainage area is follow; $Qs=267.21 S^{0.597}$
The problem of supply and transport of sediment from a mountainous catchment is very important in explaining dynamic geomorphology and the hydrological cycle. The discharge of suspended sediment is determined by a morphological system. Human interference to environment Is also an important, not negligible factor in sediment production. Moreover, growing concern in recent years for the problems of nonpoint pollution and for the transport of contaminants through terrestrial and aquatic ecosystems has highlighted the role of sediment-associated transport in fluvial systems. This study was conducted in forested and quarried catchments in order to clarify the different discharge process and the mechanism of suspended sediment dynamics for each catchment. As a forested catchment, the Yamaguchi River catchment which drains a $3.12km^2$ area was chosen. On the other hand, the Futagami River basin which is formed by three subbasins (1.07, 1.59 and $1.78km^2$), as a quarried catchment was selected. These catchments are situated to the north and east of Mt. Tsukuba, Ibaraki, Japan. The discharge pattern of suspended sediment from the Futagami River basin is more unstable and irregular than that from forested catchment, the Yamaguchi River catchment. Under the similar rainstorm conditions, suspended sediment concentration from quarried catchment during a rainstorm event increases from 43 to 27,340 mg/l. However, in the case of the forested catchment it changes only from nearly zero to 274 mg/l. Generally, the supply source of suspended sediment is classified into two areas, the in-channel and non-channel source areas. As a result of field measurements, in the case of the forested catchment the in-channel (channel bed, channel bank and channel margin) is the main source area of suspended sediment. On the other hand, remarkable sediment source area on the Quarried catchment is the non-channel that is unvegetated ground.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.