• Title/Summary/Keyword: scheduling management

Search Result 1,293, Processing Time 0.033 seconds

A Real-Time MAC Protocol with Extended Backoff Scheme for Wireless Sensor Networks

  • Teng, Zhang;Kim, Ki-Il
    • Journal of information and communication convergence engineering
    • /
    • v.9 no.3
    • /
    • pp.341-346
    • /
    • 2011
  • Wireless sensor networks (WSNs) are formed by a great quantity of sensor nodes, which are consisted of battery-powered and some tiny devices. In WSN, both efficient energy management and Quality of Service (QoS) are important issues for some applications. Real-time services are usually employed to satisfy QoS requirements in critical environment. This paper proposes a real-time MAC (Medium Access Control) protocol with extended backoff scheme for wireless sensor networks. The basic idea of the proposed protocol employs (m,k)-firm constraint scheduling which is to adjust the contention window (CW) around the optimal value for decreasing the dynamic failure and reducing collisions DBP (Distant Based Priority). In the proposed protocol, the scheduling algorithm dynamically assigns uniform transmitting opportunities to each node. Numerical results reveal the effect of the proposed backoff mechanism.

Heuristic Algorithms for Minimizing Flowtime in the 2-Stage Assembly Flowshop Scheduling (부품 생산과 조립으로 구성된 2단계 조립 일정계획의 Flowtime 최소화 연구)

  • Lee, Ik-Sun;Yoon, Sang-Hum;Ha, Gui-Ryong;Juhn, Jae-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.45-57
    • /
    • 2010
  • This paper considers a 2-stage assembly flowshop scheduling problem where each job is completed by assembling multiple components. The problem has the objective measure of minimizing total completion time. The problem is shown to be NP-complete in the strong sense. Thus, we derive some solution properties and propose three heuristic algorithms. Also, a mixed-integer programming model is developed and used to generate a lower bound for evaluating the performance of proposed heuristics. Numerical experiments demonstrate that the proposed heuristics are superior over those of previous research.

A Study on the Control of Multi-class Traffics in ATM Networks (ATM 망에서 멀티클래스 트래픽 제어에 관한 연구)

  • 이기학;김점구
    • The Journal of Information Technology
    • /
    • v.1 no.2
    • /
    • pp.65-79
    • /
    • 1998
  • In this thesis, a buffer alloction and management algorithm is proposed in order to satisfy the QoS of CBR/VBR traffics incomming to ATM networks. Proposed traffic menagement algorithm is based on the route seperation mechanism that allocates buffers acoording to traffic characterics, and sets threshold to allocated buffers. We developed a cell scheduling algorithm and evaluated cell delay and loss probability characteristics according to incomming traffic classes. The cell scheduling algorithm uses buffer size thresholds to control overload traffic flow.

  • PDF

A Study on the Offloading Framework Resource Scheduling in Mobile Cloud Environments (모바일 클라우드 환경에서 오프로딩 프레임워크 리소스 스케줄링에 관한 연구)

  • Liaqat, Misbah;Son, Younsik;Oh, Seman;Kim, Soongohn;Kim, Seongjin;Ko, Kwangman
    • Annual Conference of KIPS
    • /
    • 2017.04a
    • /
    • pp.178-180
    • /
    • 2017
  • Virtualization was devised as a resource management and optimization technique for mainframes having scaleless computing capabilities. The resource scaling can be done with a variety of virtualization methods such as VM creation, deletion, and migration. In this paper, we designed to achieve the load balancing, several load balancing schemes such as Minimum Execution Time (MET), Min-Min scheduling, Cloud Analyst have been reported in literature in addition to a comprehensive study on First Come First Serve (FCFS) and Round-robin schedulers.

A Genetic Algorithm with a New Repair Process for Solving Multi-stage, Multi-machine, Multi-product Scheduling Problems

  • Pongcharoen, Pupong;Khadwilard, Aphirak;Hicks, Christian
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.3
    • /
    • pp.204-213
    • /
    • 2008
  • Companies that produce capital goods need to schedule the production of products that have complex product structures with components that require many operations on different machines. A feasible schedule must satisfy operation and assembly precedence constraints. It is also important to avoid deadlock situations. In this paper a Genetic Algorithm (GA) has been developed that includes a new repair process that rectifies infeasible schedules that are produced during the evolution process. The algorithm was designed to minimise the combination of earliness and tardiness penalties and took into account finite capacity constraints. Three different sized problems were obtained from a collaborating capital goods company. A design of experimental approach was used to systematically identify that the best genetic operators and GA parameters for each size of problem.

MECHANISATION SYSTEM FOR LARGE SCALE GRAIN MAIZE PRODUCTION IN MALASIA

  • Abu-Hassan, D.;Nor, J.M.;Daham, M.D.M.
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 1993.10a
    • /
    • pp.158-173
    • /
    • 1993
  • The formulated mechanization packages for grain maize production have performed to the expected limit generating encouraging information. Besides physical feasibility , management factors viz ; production operation sequence, operations scheduling and machinery matching with respect to environment can still limit system suitability. A new production operation sequence was introduced to overcome weed problems and limitations of available working days. Proper operations scheduling will improve the initial soil-crop environment for better seedling establishment, and reduce the (). been identified as key factors to reduce capital investment and cost of proudction .

  • PDF

A Heuristic Algorithm for Berth Planning with a Limited Number of Cranes (크레인 대수의 제약을 고려한 선석계획 문제에 대한 발견적 해법)

  • Park, Young-Man;Kim, Kap-Hwan
    • Journal of Navigation and Port Research
    • /
    • v.35 no.1
    • /
    • pp.63-70
    • /
    • 2011
  • This paper discusses the problem of scheduling berth and container cranes simultaneously in port container terminals. A mixed-integer programming model is formulated by considering various practical constraints. A heuristic algorithm is suggested for solving the mathematical model. A numerical experiment was conducted to test the performance of the suggested heuristic algorithm.

A Scheduling Problem in Fork-and-Join System (Fork-and-Join 시스템에서의 일정계획 문제)

  • Yoon, Sang-Hum;Lee, Ik-Sun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.3
    • /
    • pp.188-193
    • /
    • 2009
  • 본 논문은 조립과 분리시스템이 혼합된 Fork-and-Join 시스템에서의 일정계획문제를 고려하고 있다. 최초 단계에서는 구성품단위로 분리가 발생하고 두 번째 단계에서는 부품생산단계에서 각 부품 또는 구성품이 서로 다른 설비와 경로를 통해 독립적으로 생산된 후 최종 조립단계로 이동하게 되고, 그곳에서 조립공정을 통해 제품으로 완성된다. 본 논문에서는 이러한 Fork-and-Join 시스템에서 최종완료시간(makespan)을 최소화 할 수 있는 발견적 해법을 제안하고 이 해법의 최악오차한계(worst-case error bound)가 2라는 것을 증명한다. 또한, 제안된 문제의 효과적인 3가지 하한값(lower bound)을 제시하고 다양한 수치실험을 통해 제안된 발견적 해법의 결과와 하한값과의 비교를 통해 제안된 해법이 성능이 우수함을 증명한다.

Subchannel State Estimation and Scheduling for Wireless Multimedia Services (무선 멀티미디어 서비스를 위한 서브채널 상태 추정과 스케줄링)

  • Jang Bong-Seog;Koh Hyung-Dae
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2005.11a
    • /
    • pp.340-344
    • /
    • 2005
  • For the next generation wireless systems, multimedia services will be highly demanded and needed to transmit the cost-efficient packet data. With this regard, the adaptive resource management methods are preferable to optimally control the various traffic classes in OFDMA (WiBro) systems. We have developed a sub-channel state prediction method based on the past sub-channel state dependency. Using the method, we are developed a scheduling algorithm that can efficiently control multimedia traffic downlink transmissions.

  • PDF

Development of the Pre-erection Block Arrangement System for Deckhouse (선실 PE장 정반배치 계획수립 시스템 개발)

  • Ha, Seung-Jin;Kim, Ji-On;Choi, Tae-Hoon
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.79-88
    • /
    • 2007
  • In this study, we improved the layout of deckhouse pre-erection area where erects the blocks and developed the pre-erection block arrangement system for the improvement of productivity and effectiveness. The major operating point of the pre-erection area is to fabricate as many as possible that has restrict area and working plate. The developed system has information management module, scheduling module, schedule control module, statistics module, and information integrate module. The heuristic algorithm is issued and evaluated with real data. And genetic algorithm is used for the evaluation of issued it.

  • PDF