• 제목/요약/키워드: scheduling management

검색결과 1,293건 처리시간 0.028초

고객 요구 집단에 의한 일정계획 수립에 관한 연구 (A Study on Scheduling by Customer Needs Group)

  • 양광모;박재현;강경식
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2002년도 추계학술대회
    • /
    • pp.233-238
    • /
    • 2002
  • The product process is sequence of all the required activities that a company must perform to develop, and manufacture a product. These activities include marketing, research, engineering design, quality assurance, manufacturing, and a whole chain of suppliers and vendors. The process also comprises all strategic planning, capital investments, management decisions, and tasks necessary to create a new product. manufacturing processes must be created so that the product can be produced in the product facility Purchasing new equipment and training workers may be required if new technology is to be used. Tools, fixtures, and the sequence of steps in the manufacturing processes must all be developed to allow rapid, high-quality, cost effective production. Also, it may be needed to be rearrange the production facility to adapt to the new manufacturing processes. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.

  • PDF

전자산업의 생산 계획 및 스케줄링을 위한 Factory Planner적용 (Factory Planner Application for Planning and Scheduling of Electronic Industry)

  • 박경종;오형술;이충수
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.98-102
    • /
    • 2002
  • High-Tech 산업은 국제적인 경쟁력과 갈수록 짧아지는 제품의 Life-cycle로 인해 그 경쟁이 매우 치열해 지고 있다. 따라서. 변동되는 시장 상황에 맞추어 자재의 구매/조달, 연구 개발, 생산, 물류/배송, 판매, 및 고객에 대한 납기 약속 등을 신속하고 정확하게 처리하기 위해 전 세계적으로 SCM(Supply Chain Management)관점에서 APS(Advanced Planning and Scheduling)시스템을 사영하고 있다. 특히, 고객으로부터 주문량이 할당되면 주어진 자재와 공장의 생산능력 (capacity)을 계산하여 생산가능 유무 및 생산가능일을 알려주는 공장내의 생산 계획 및 스케줄링 방법은 현재는 물론 앞으로도 지속적으로 발전시켜야 될 부분으로서 그 중요성이 점점 확대되고 있다. 따라서, 본 연구에서는 High-Tech 산업 중에서 전자 산업의 요구 사항을 분석하고, 이러한 요구 사항들을 해결하기 위래 세계적으로SCM 시장에서 가장 많은 경쟁력을 가지고 있는 i2 Technologies사의 생산 계획 및 스케줄링 툴인 Factory Planner를 사용한 사례를 제시한다.

  • PDF

Min-Max Regret Version of an m-Machine Ordered Flow Shop with Uncertain Processing Times

  • Park, Myoung-Ju;Choi, Byung-Cheon
    • Management Science and Financial Engineering
    • /
    • 제21권1호
    • /
    • pp.1-9
    • /
    • 2015
  • We consider an m-machine flow shop scheduling problem to minimize the latest completion time, where processing times are uncertain. Processing time uncertainty is described through a finite set of processing time vectors. The objective is to minimize maximum deviation from optimality for all scenarios. Since this problem is known to be NP-hard, we consider it with an ordered property. We discuss optimality properties and develop a pseudo-polynomial time approach for the problem with a fixed number of machines and scenarios. Furthermore, we find two special structures for processing time uncertainty that keep the problem NP-hard, even for two machines and two scenarios. Finally, we investigate a special structure for uncertain processing times that makes the problem polynomially solvable.

Game Theory-based Bi-Level Pricing Scheme for Smart Grid Scheduling Control Algorithm

  • Park, Youngjae;Kim, Sungwook
    • Journal of Communications and Networks
    • /
    • 제18권3호
    • /
    • pp.484-492
    • /
    • 2016
  • Smart grid (SG) technology is now elevating the conventional power grid system to one that functions more cooperatively, responsively, and economically. When applied in an SG the demand side management (DSM) technique can improve its reliability by dynamically changing electricity consumption or rescheduling it. In this paper, we propose a new SG scheduling scheme that uses the DSM technique. To achieve effective SG management, we adopt a mixed pricing strategy based on the Rubinstein-Stahl bargaining game and a repeated game model. The proposed game-based pricing strategy provides energy routing for effective energy sharing and allows consumers to make informed decisions regarding their power consumption. Our approach can encourage consumers to schedule their power consumption profiles independently while minimizing their payment and the peak-to-average ratio (PAR). Through a simulation study, it is demonstrated that the proposed scheme can obtain a better performance than other existing schemes in terms of power consumption, price, average payment, etc.

Monitoring and Scheduling Methods for MIMO-FIFO Systems Utilizing Max-Plus Linear Representation

  • Goto, Hiroyuki;Masuda, Shiro
    • Industrial Engineering and Management Systems
    • /
    • 제7권1호
    • /
    • pp.23-33
    • /
    • 2008
  • This paper proposes an approach to monitoring and scheduling methods for repetitive MIMO-FIFO DESs. We use max-plus algebra for modeling and formulation, known as an effective approach for controller design for this type of system. Because a certain type of linear equations in max-plus algebra can represent the system's behavior, the principal concerns in past researches were how to solve the equations. However, the researches focused mainly on analyses of the relation between inputs and outputs of the system, which implies that the changes or the slacks of internal states were not clarified well. We first examine several properties of the corresponding state variables, which contribute to finding and tracing the float times in each process. Moreover, we provide a rescheduling method that can take into account delays or changes of the internal states. These methods would be useful in schedule control or progress management.

Research on Risk Quantification of PC Components Production Scheduling Based on DBR

  • Shuyan Ji;Yuechuan Wang;Yingmin Li
    • 국제학술발표논문집
    • /
    • The 10th International Conference on Construction Engineering and Project Management
    • /
    • pp.63-69
    • /
    • 2024
  • In order to improve the production and supply level of PC components and reduce the impact of risk accidents on production, this article hopes to solve the risk accident problems faced in industrial construction production by introducing mature constraint theories applied in the manufacturing industry. Firstly, this article introduces the widely used constraint theory and DBR method in traditional manufacturing industry; Secondly, based on the constraint theory DBR method, a pull production mechanism is established for the constraint buffering and material delivery of PC components, and risk accidents are defined and estimated; Then calculate and set buffer zones to reduce their risks and ensure the full utilization of bottleneck resources; The ultimate goal is to reduce production scheduling risks and improve production supply levels.

UNIK-OPT를 이용한 지식과 최적화 모형의 관리 - 정유산업사례

  • 김민용;이재규
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1993년도 춘계공동학술대회 발표논문 및 초록집; 계명대학교, 대구; 30 Apr.-1 May 1993
    • /
    • pp.109-118
    • /
    • 1993
  • This paper describes the management of knowledge base and optimization models using knowledge-assisted optimization model formulation system UNIK-OPT (UNIfied Knowledge-OPTimization). We will illustrate UNIK-OPT with the case of production scheduling in refinery.

  • PDF

환자분류에 의한 간호인력 산정 및 배치과정 전산화 (Computerization of Nurse Staffing and Scheduling according to Patient Classification)

  • 박정호;박현애;조현;최용선
    • 대한간호학회지
    • /
    • 제26권2호
    • /
    • pp.399-412
    • /
    • 1996
  • Even though Korean medical law stipulates that number of patients attended by a nurse is 2.5 for hospitalization and 30 for ambulatory care, the number of patients cared by a nurse per day is much greater than the standard prescribed by the medical law. Current nursing productivity of nurses is not desirable unless the quality of care considered. Moreover. nursing manpower staffing based on neither current nurses' productivity nor standard of medical law cannot respond properly to dynamic situation of the medical services. As for the nurse scheduling, the critical problem of it in the hospital is determining the day-to-day shift assignments for each nurse for the specified period in a way that satisfies the given requirements of the hospital. Nurse scheduling, however, involves many factors and requirements, manual scheduling requires much time and effort to produce an adequate schedule. Under these backgrounds, the necessity of more efficient management of nursing manpower occupying 1/3 of total hospital workers has been recognized by many nursing administrators. This study was performed to develop a system computerizing nurse staffing and scheduling based on the patient classification. As a preliminary step for the system development, nursing workload in a secondary hospital was measured from Sep. to Oct. 1994. On the grounds of this result, computerization of nurse staffing and scheduling was proceeded with three options. First one is based on the current medical law. Second one is based on the assigned number of nursing staff. And the last is based on the request by patient classification. Computer languages used in this study were MS Visual Basic 3.0 for the staffing and Access 2.0 for the scheduling, respectively. Prospective users may operate this system easily because icons and mouse are used for easier graphic user interface and reducing the need for typing efforts. This system can help nurse administrators manage nursing manpower efficiently and nurses develop quick and easy schedule generation and allow more time for the patient care.

  • PDF

납기와 작업준비비용을 고려한 병렬기계에서 딥러닝 기반의 일정계획 생성 모델 (Scheduling Generation Model on Parallel Machines with Due Date and Setup Cost Based on Deep Learning)

  • 유우식;서주혁;이동훈;김다희;김관호
    • 한국전자거래학회지
    • /
    • 제24권3호
    • /
    • pp.99-110
    • /
    • 2019
  • 4차 산업혁명이 진행되면서 제조업에서 사물인터넷(IoT), 머신러닝과 같은 지능정보기술을 적용하는 사례가 증가하고 있다. 반도체/LCD/타이어 제조공정에서는 납기일(due date)을 준수하면서 작업물 종류 변경(Job change)으로 인한 작업 준비 비용(Setup Cost)을 최소화하는 일정계획을 수립하는 것이 효과적인 제품 생산을 위해 매우 중요하다. 따라서 본 연구에서는 병렬기계에서 딥러닝 기반의 납기 지연과 작업 준비 비용 최소화를 달성하는 일정계획 생성 모델을 제안한다. 제안한 모델은 과거의 많은 데이터를 이용하여 고려되어지는 주문에 대해 작업 준비와 납기 지연을 최소화하는 패턴을 학습한다. 따라서 세 가지 주문 리스트의 난이도에 따른 실험 결과, 본 연구에서 제안한 기법이 기존의 우선순위 규칙보다 성능이 우수하다는 것을 확인하였다.

An Enhanced Response Time Mechanism in Grid Systems

  • Lee, Seong-Hoon
    • International Journal of Contents
    • /
    • 제6권2호
    • /
    • pp.10-13
    • /
    • 2010
  • For applications that are grid enabled, the grid can offer a resource balancing effect by scheduling grid jobs on machines with low utilization. When jobs communicate with each other, the internet, or with storage resources, an advanced scheduler could schedule them to minimize communications traffic or minimize the distance of the communications. We propose an intelligent load distribution algorithm to minimize communications traffic and distance of the communications using genetic algorithm. The experiments show the proposed load redistribution algorithm performs efficiently in the variance of load in grid environments.