DOI QR코드

DOI QR Code

Research on Risk Quantification of PC Components Production Scheduling Based on DBR

  • Shuyan Ji (Department of Construction Management and Real Estate, Chongqing University) ;
  • Yuechuan Wang (CHONGQING CISDI Engineering Consulting Co., Ltd) ;
  • Yingmin Li (School of Civil Engineering, Chongqing University)
  • Published : 2024.07.29

Abstract

In order to improve the production and supply level of PC components and reduce the impact of risk accidents on production, this article hopes to solve the risk accident problems faced in industrial construction production by introducing mature constraint theories applied in the manufacturing industry. Firstly, this article introduces the widely used constraint theory and DBR method in traditional manufacturing industry; Secondly, based on the constraint theory DBR method, a pull production mechanism is established for the constraint buffering and material delivery of PC components, and risk accidents are defined and estimated; Then calculate and set buffer zones to reduce their risks and ensure the full utilization of bottleneck resources; The ultimate goal is to reduce production scheduling risks and improve production supply levels.

Keywords

References

  1. Wang Jun Development status and thinking of China's construction industrialization [J].Journal of Civil Engineering, 2016,49(5): 1-8.
  2. Xie Sicong, Chen Xiaobo.Two-stage production scheduling optimization of prefabricated building components based on multi-layer coding genetic algorithm [J].Journal of Engineering Management, 2018,32(01): 18-22.
  3. Goldratt E M.It's Not Luck [M ].Aldershot.England: Gower, 1994.
  4. Kong Xiangkui, Lu Weichao.Study on the Sustainable Marketing Ability of Construction Enterprises Based on TOC [J].Value Engineering, 2017, 36 (12): 27-30.
  5. Chen Yirong.Research on the Construction Supply Chain Performance Evaluation System Based on TOC [J].Enterprise Report, 2013 (13): 62-63.
  6. Han Xiaokang.Research on Pre-control of Engineering Cost Based on Neural Network and TOC Theory [D].Xi'an University of Architectural Science and Technology, 2011.
  7. Application Research Group of TOC Theory in Cost Management of Construction Projects.Application Research of TOC Theory in Cost Management of Construction Projects [J].Times Economy and Trade, 2017 (12): 70-73.
  8. Tian Dengdeng, Jiang Lizhao, Hu Yaqin, Zhang Jinhua.Study on Optimization of production