• Title/Summary/Keyword: scheduling management

Search Result 1,280, Processing Time 0.027 seconds

THE MULTI-MODEL COMPARISON AND COMBINED MODEL ANALYSIS OF AN AGGREGATE SCHEDULING DECISION

  • Kang, Suk-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.2 no.1
    • /
    • pp.93-100
    • /
    • 1976
  • Given a fixed production process and facility capacity, the ability to respond to market fluctuations in terms of changes in production, work force, and inventory is the major task of production management. The costs involved are primarily payroll (regular and overtime), inventory carrying, and hiring and firing. The magnitude of these costs is usually a significant portion of the operating costs of the firm and consequently a small percentage saving due to astute aggregate scheduling can mean substantial absolute saving. At least three demonstrably optimal techniques have been developed for solving this aggregate scheduling problem. These three optimal are apparently LDR, PPP, and SDR. By combining these three different approaches, another optimal solution was obtained by me. I call this CDR (Combined Decision Rule). This approach appears to be useful. This approach may be generalizable to aggregate scheduling involving a short term resources.

  • PDF

A Comparative Study of Two-phase Heuristic Approaches to General Job Shop Scheduling Problem

  • Sun, Ji Ung
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.2
    • /
    • pp.84-92
    • /
    • 2008
  • Scheduling is one of the most important issues in the planning and operation of production systems. This paper investigates a general job shop scheduling problem with reentrant work flows and sequence dependent setup times. The disjunctive graph representation is used to capture the interactions between machines in job shop. Based on this representation, four two-phase heuristic procedures are proposed to obtain near optimal solutions for this problem. The obtained solutions in the first phase are substantially improved by reversing the direction of some critical disjunctive arcs of the graph in the second phase. A comparative study is conducted to examine the performance of these proposed algorithms.

A Shaking Optimization Algorithm for Solving Job Shop Scheduling Problem

  • Abdelhafiez, Ehab A.;Alturki, Fahd A.
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.1
    • /
    • pp.7-14
    • /
    • 2011
  • In solving the Job Shop Scheduling Problem, the best solution rarely is completely random; it follows one or more rules (heuristics). The Genetic Algorithm (GA), Particle Swarm Optimization (PSO), Simulated Annealing, and Tabu search, which belong to the Evolutionary Computations Algorithms (ECs), are not efficient enough in solving this problem as they neglect all conventional heuristics and hence they need to be hybridized with different heuristics. In this paper a new algorithm titled "Shaking Optimization Algorithm" is proposed that follows the common methodology of the Evolutionary Computations while utilizing different heuristics during the evolution process of the solution. The results show that the proposed algorithm outperforms the GA, PSO, SA, and TS algorithms, while being a good competitor to some other hybridized techniques in solving a selected number of benchmark Job Shop Scheduling problems.

A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project (원자력연구개발사업의 공정관리 적용 사례 연구)

  • 한도희
    • Journal of Korea Technology Innovation Society
    • /
    • v.2 no.3
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF

Application of Work Relationships for Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Rye, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.131-133
    • /
    • 2010
  • As linear scheduling method has been used since 1929, Empire State Building linear schedule, it is being applied in various fields such as construction and manufacturing. When addressing concurrent critical path occurring on linear schedule of construction, the empirical researches stress the resource management which should be applied for optimizing work flow, flexible work productivity and continuos resource allocation. However, work relationships has been usually overlooked for making the linear schedule from existing network schedule. Therefore, this research analyze the previous researches related to linear scheduling model and then propose the method that can be applied for adopting the relationships of network schedule to the linear schedule.

  • PDF

Optimization Algorithms for a Two-Machine Permutation Flowshop with Limited Waiting Times Constraint and Ready Times of Jobs

  • Choi, Seong-Woo
    • Journal of Information Technology Applications and Management
    • /
    • v.22 no.2
    • /
    • pp.1-17
    • /
    • 2015
  • In this research, we develop and suggest branch and bound algorithms for a two-machine permutation flowshop scheduling problem with the objective of minimizing makespan. In this scheduling problem, after each job is operated on the machine 1 (first machine), the job has to start its second operation on machine 2 (second machine) within its corresponding limited waiting time. In addition, each job has its corresponding ready time at the machine 1. For this scheduling problem, we develop various dominance properties and three lower bounding schemes, which are used for the suggested branch and bound algorithm. In the results of computational tests, the branch and bound algorithms with dominance properties and lower bounding schemes, which are suggested in this paper, can give optimal solution within shorter CPU times than the branch and bound algorithms without those. Therefore, we can say that the suggested dominance properties and lower bounding schemes are efficient.

The Optimal Link Scheduling in Half-Duplex Wireless Mesh Networks Using the Constraint Programming (제약식 프로그래밍을 이용한 일방향 전송 무선 메쉬 네트워크에서의 최적 링크 스케쥴링)

  • Kim, Hak-Jin
    • Journal of Information Technology Applications and Management
    • /
    • v.23 no.2
    • /
    • pp.61-80
    • /
    • 2016
  • The wireless mesh network (WMN) is a next-generation technology for data networking that has the advantage in cost and the flexibility in its construction because of not requiring the infra-structure such as the ethernet. This paper focuses on the optimal link scheduling problem under the wireless mesh network to effectuate real-time streaming by using the constraint programming. In particular, Under the limitation of half-duplex transmission in wireless nodes, this paper proposes a solution method to minimize the makespan in scheduling packet transmission from wireless nodes to the gateway in a WMN with no packet transmission conflicts due to the half-duplex transmission. It discusses the conflicts in packet transmission and deduces the condition of feasible schedules, which defines the model for the constraint programming. Finally it comparatively shows and discusses the results using two constraint programming solvers, Gecode and the IBM ILOG CP solver.

Dynamic Decisions using Variable Neighborhood Search for Stochastic Resource-Constrained Project Scheduling Problem (확률적 자원제약 스케줄링 문제 해결을 위한 가변 이웃탐색 기반 동적 의사결정)

  • Yim, Dong Soon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.43 no.1
    • /
    • pp.1-11
    • /
    • 2017
  • Stochastic resource-constrained project scheduling problem is an extension of resource-constrained project scheduling problem such that activity duration has stochastic nature. In real situation where activity duration is not known until the activity is finished, open-loop based static policies such as activity-based policy and priority-based policy will not well cope with duration variability. Then, a dynamic policy based on closed-loop decision making will be regarded as an alternative toward achievement of minimal makespan. In this study, a dynamic policy designed to select activities to start at each decision time point is illustrated. The performance of static and dynamic policies based on variable neighborhood search is evaluated under the discrete-event simulation environment. Experiments with J120 sets in PSPLIB and several probability distributions of activity duration show that the dynamic policy is superior to static policies. Even when the variability is high, the dynamic policy provides stable and good solutions.

Scheduling for improving productivity of the automated manufacturing system

  • Choi, Jung-Sang;Jang, Gil-Sang
    • International Journal of Quality Innovation
    • /
    • v.2 no.2
    • /
    • pp.101-120
    • /
    • 2001
  • In this paper jobshop scheduling problem was considered on automated manufacturing systems with the closed loop and unidirectional material handling system. The objective of this research is to develop and evaluate heuristic scheduling procedures to improve productivity by minimizing makespan. Especially travel time of material handling system as well as processing time was considered in the proposed algorithms, A new heuristic algorithms are proposed and illustrates the proposed algorithm. The heuristic algorithms are implemented for various cases. The results show that the proposed algorithms provide better solutions in productivity, frequency, job waiting time and the number of waiting jobs than the random scheduling algorithm.

  • PDF

A Study on an application of PERT/CPM for process Management (공정관리를 위한 PERT/CPM 활용에 관한 연구)

  • 이종철;강규철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.6 no.9
    • /
    • pp.7-18
    • /
    • 1983
  • In this paper, I have approached the problem of scheduling that can be reasonably cost down and duration down in the tenement house by using PERT/CPM technics. The tenement house of 'M' construction company consistute 78 element workings in total. I made out the net-work scheduling through 78 element workings, after calculating by computer, G-COS 101, I reduced the duration and cost by MCX, and then enforced from the least cost slope to six times. Resulty, I attained PERT/CPM scheduling for construction scheduling ; a) Make Possible the effectiveness budgeting control b) How the scientific materials c) Make possible the reasonably decision making d) Strengthen the material control by relevance of element workings e) Make possible the duration down through the least cost.

  • PDF