• 제목/요약/키워드: scheduling management

검색결과 1,280건 처리시간 0.026초

Scheduling of Production Process with Setup Cost depending Job Sequence (작업순서에 따라 달라지는 준비 비용을 갖는 PCB 생산 공정의 일정계획)

  • Yu, Sungyeol
    • Management & Information Systems Review
    • /
    • 제34권2호
    • /
    • pp.67-78
    • /
    • 2015
  • In this paper, we consider a scheduling problem of printed circuit board production process with setup cost depending job sequence. Given a set of PCBs, these are produced in single surface mounting device. The problem is to define job sequence with the objective of minimizing the total seutp cost. We propose a mathematical formulation and the problem is proven to be NP-hard. So, a meta heuristic based on genetic algorithm is developed.

  • PDF

Bandwidth Allocation and Scheduling Algorithms for Ethernet Passive Optical Networks

  • Joo, Un-Gi
    • Management Science and Financial Engineering
    • /
    • 제16권1호
    • /
    • pp.59-79
    • /
    • 2010
  • This paper considers bandwidth allocation and scheduling problems on Ethernet Passive Optical Networks (EPON). EPON is one of the good candidates for the optical access network. This paper formulates the bandwidth allocation problem as a nonlinear mathematical one and characterizes the optimal bandwidth allocation which maximizes weighted sum of throughput and fairness. Based upon the characterization, two heuristic algorithms are suggested with various numerical tests. The test results show that our algorithms can be used for efficient bandwidth allocation on the EPON. This paper also shows that the WSPT (Weighted Shortest Processing Time) rule is optimal for minimization the total delay time in transmitting the traffic of the given allocated bandwidth.

An Application of the Markov Process to the Management of Hospital Admissions

  • Choo, Hwi-Suck
    • Journal of the Korean Statistical Society
    • /
    • 제4권1호
    • /
    • pp.79-87
    • /
    • 1975
  • However, the mechanism for producing revised estimate is the principal means of varying the resulting precisions of estimate. Therefore, a scheduling system including physician's revision should be checked by a computer simulation to evaluate possible gains to admissions scheduling accruing from the use of these estimates. The ability to accurately predict bed occupancy has long been an objective of hospital management. If the one were able to anticipate bed accupancy, then the one could more accurately plan for bed needs, schedule personnel, allocate service and supply. We may conclude that even though the Markov chain analysis would not lead to ready-made answers for the scheduling system of elective patients, it can provide the more detailed and systematic knowledgy for the solutions on the weekly base as well as the foundations for long run planning in relative sense.

  • PDF

Single-Machine Total Completion Time Scheduling with Position-Based Deterioration and Multiple Rate-Modifying Activities

  • Kim, Byung-Soo;Joo, Cheol-Min
    • Industrial Engineering and Management Systems
    • /
    • 제10권4호
    • /
    • pp.247-254
    • /
    • 2011
  • In this paper, we study a single-machine scheduling problem with deteriorating processing time of jobs and multiple rate-modifying activities which reset deteriorated processing time to the original processing time. In this situation, the objective function is to minimize total completion time. First, we formulate an integer programming model. Since the model is difficult to solve as the size of real problem being very large, we design an improved genetic algorithm called adaptive genetic algorithm (AGA) with spontaneously adjusting crossover and mutation rate depending upon the status of current population. Finally, we conduct some computational experiments to evaluate the performance of AGA with the conventional GAs with various combinations of crossover and mutation rates.

Scheduling Algorithm for Nonidentical Parallel Machines Problem with Rework (Rework가 존재하는 이종병렬기계에서의 일정계획 수립)

  • Kang, Yong Ha;Kim, Sung Shick;Park, Jong Hyuck;Shin, Hyun Joon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • 제33권3호
    • /
    • pp.329-338
    • /
    • 2007
  • This paper presents a dispatching algorithm for nonidentical parallel machines problem considering rework, sequence dependent setup times and release times. For each pair of a machine and a job type, rework probability of each job on a machine can be known through historical data acquisition. The heuristic scheduling scheme named by EDDR (Earliest Due Date with Rework probability) algorithm is proposed in this paper making use of the rework probability. The proposed dispatching algorithm is measured by two objective function value: 1) total tardiness and 2) the number of reworked jobs, respectively. The extensive computational results show that the proposed algorithm gives very efficient schedules superior to the existing dispatching algorithms.

Energy Aware Task Scheduling for a Distributed MANET Computing Environment

  • Kim, Jaeseop;Kim, Jong-Kook
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권4호
    • /
    • pp.987-992
    • /
    • 2016
  • This study introduces an example environment where wireless devices are mobile, devices use dynamic voltage scaling, devices and tasks are heterogeneous, tasks have deadline, and the computation and communication power is dynamically changed for energy saving. For this type of environment, the efficient system-level energy management and resource management for task completion can be an essential part of the operation and design of such systems. Therefore, the resources are assigned to tasks and the tasks may be scheduled to maximize a goal which is to minimize energy usage while trying to complete as many tasks as possible by their deadlines. This paper also introduces mobility of nodes and variable transmission power for communication which complicates the resource management/task scheduling problem further.

A Fundamental Study on the Expert System for the Operations Management in Wood Furniture Industry (목가구(木家具) 생산관리(生産管理)를 위한 전문가(專門家) 시스템의 기초(基礎) 연구(硏究))

  • Kim, Il-Sook;Lee, Hyoung-Woo
    • Journal of the Korean Wood Science and Technology
    • /
    • 제21권2호
    • /
    • pp.23-30
    • /
    • 1993
  • As the demand of wood furniture becomes diverse and large-sized, artificial intelligence technique is required to design the expert system which can promote the efficiency of the operations management in wood furniture industry. This study was carried out to develop the expert scheduler, which was applied to the scheduling in chair-manufacturing process to evaluate its validity. The expert scheduler could show the results of scheduling must faster than Gantt chart method with ease. Maximum tardiness in the current chair-manufacturing process could be reduced from 29 seconds to 5 seconds by the addition of a spindle sander, a 12 spindle universal boring machine, and a moulding sander to sanding, boring, and moulding process, respectively.

  • PDF

SCHEDULING REPETITIVE PROJECTS WITH STOCHASTIC RESOURCE CONSTRAINTS

  • I-Tung Yang
    • International conference on construction engineering and project management
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.881-885
    • /
    • 2005
  • Scheduling repetitive projects under limitations on the amounts of available resources (labor and equipment) has been an active subject because of its practical relevance. Traditionally, the limitation is specified as a deterministic (fixed) number, such as 1000 labor-hours. The limitation, however, is often exposed to uncertainty and variability, especially when the project is lengthy. This paper presents a stochastic optimization model to treat the situations where the limitations of resources are expressed as probability functions in lieu of deterministic numbers. The proposed model transfers each deterministic resource constraint into a corresponding stochastic one and then solves the problem by the use of a chance-constrained programming technique. The solution is validated by comparison with simulation results to show that it can satisfy the resource constraints with a probability beyond the desired confidence level.

  • PDF

An Optimal Scheduling Method Using Probability on the Estimation of Construction Duration (확률적 공기산정에 의한 공정계획 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Korean Journal of Construction Engineering and Management
    • /
    • 제5권6호
    • /
    • pp.72-79
    • /
    • 2004
  • Critical Path-based project management has been applied to the construction projects with a goal of delivering projects within original costs and time estimates. These current project management methods, rarely make early finishes of construction Projects. In addition, current practices on time management seems not to take advantages of early finishes concepts due to student syndrome and Parkinson's Law, This research study applied the Theory of Constraints(n) in the estimation of construction project duration. While the TOC includes variety of management techniques, in this study, it refers to critical chain that has been used to develop the specific management technique in scheduling. The concept of critical chain is applied to this study to solve the problems associated with the current scheduling method. The efforts focus to solve the p개blems associated with current construction project scheduling methods by adopting both stochastic estimation technique and the concept of schedule buffer,

Hybrid Genetic Algorithms for Solving Reentrant Flow-Shop Scheduling with Time Windows

  • Chamnanlor, Chettha;Sethanan, Kanchana;Chien, Chen-Fu;Gen, Mitsuo
    • Industrial Engineering and Management Systems
    • /
    • 제12권4호
    • /
    • pp.306-316
    • /
    • 2013
  • The semiconductor industry has grown rapidly, and subsequently production planning problems have raised many important research issues. The reentrant flow-shop (RFS) scheduling problem with time windows constraint for harddisk devices (HDD) manufacturing is one such problem of the expanded semiconductor industry. The RFS scheduling problem with the objective of minimizing the makespan of jobs is considered. Meeting this objective is directly related to maximizing the system throughput which is the most important of HDD industry requirements. Moreover, most manufacturing systems have to handle the quality of semiconductor material. The time windows constraint in the manufacturing system must then be considered. In this paper, we propose a hybrid genetic algorithm (HGA) for improving chromosomes/offspring by checking and repairing time window constraint and improving offspring by left-shift routines as a local search algorithm to solve effectively the RFS scheduling problem with time windows constraint. Numerical experiments on several problems show that the proposed HGA approach has higher search capability to improve quality of solutions.