References
- Demirkov, E. and Uzsoy, R. (2000), Decomposition methods for reentrant flow shops with sequence-dependent setup times, Journal of Scheduling, 3,155-177 https://doi.org/10.1002/(SICI)1099-1425(200005/06)3:3<155::AID-JOS39>3.0.CO;2-E
- Flapper, S. D. P., Fransoo, J. C., Broekmeulen, R. A. C. M., and Inderfurth, K. (2002), Planning and control of rework in the process industries: review, Production Planning & Control, 13(1), 26-34 https://doi.org/10.1080/09537280110061548
- Flapper, S. D. P. and Teunter, R. H. (2004), Logistic planning of rework with deteriorating work in process, International Journal of Production Economics, 88, 51-59 https://doi.org/10.1016/S0925-5273(03)00130-0
- Kang, Y. H. (2003), A scheduling scheme for parallel machines where jobs demand repetitive processing, a thesis for a master degree, Dept. of I.E., Korea Univ
- Kim, C. O. and Shin, H. J. (2003), Scheduling Jobs on Parallel Machines: A Restricted Tabu Search Approach, International Journal of Advanced Manufacturing Technology, 22(3-4), 278-287 https://doi.org/10.1007/s00170-002-1472-2
- Kim, S. C. and Bobrowski, P. M. (1994), Impact on sequence-dependent setup time on job shop scheduling performance, International Journal of Production Research, 32(7), 1503- 1520 https://doi.org/10.1080/00207549408957019
- Kuhl, M. E. and Laubisch, G. R. (2004), A simulation study of dispatching rules and rework strategies in semiconductor manufacturing, IEEE/SEMI Advanced Semiconductor Manufacturing Conference
- Lee, D. H., Ko, H. H., and Kim, S. S. (2005), A study of strategy for planning of rework in semoconductor monitoring burn in test process, IE interfaces, 18(3), 350-360
- Lee, Y. H., Bhaskran, K., and Pinedo, M.(1997), A heuristic to minimize the total weighted tardiness with sequence-dependent setups, lIE Transactions, 29, 45-52
- Lee, Y. H. and Pinedo, M. (1997), Scheduling jobs on parallel machines with sequence-dependent setup times, European Journal of Operational Research, 100(3), 464-474 https://doi.org/10.1016/S0377-2217(95)00376-2
- Liu, J. J. and Ping, Y. (1996), Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs, European Journal of Operational Research, 91(3), 517-527 https://doi.org/10.1016/0377-2217(94)00339-4
- Park, Y. S., Kim, S. Y., and Lee, Y. H. (2000), Scheduling Jobs on Parallel Machines Applying Neural Network and Heuristic Rules, Computers & Industrial Engineering, 38, 189-202 https://doi.org/10.1016/S0360-8352(00)00038-3
- Sha, D. Y., Hsu, S. Y., Che, Z. H., and Chen, C. H. (2006), 'A dispatching rule for photolithography scheduling with an online rework strategy', Computers & Industrial Engineering, 50, 233-247 https://doi.org/10.1016/j.cie.2006.04.002
- Shin, H. J., Kim, C. O., and Kim, S. S. (2002), A tabu search for a single machine scheduling with release times, due dates and sequence-dependent setup times, International Journal of Advanced Manufacturing Technology. 19,859-866 https://doi.org/10.1007/s001700200097
- So, K. C., Tang, C. S. (1995), Optimal operating policy for a bottleneck with random rework, Management Science, 41(4), 620-636 https://doi.org/10.1287/mnsc.41.4.620
- Teunter, R. H. and Flapper, S. D. P. (2003), Lot-sizing for a single-product production system with rework of perishable production defectives, OR Spectrum, 25, 85-96 https://doi.org/10.1007/s00291-002-0105-3
- Uzsoy, R., Lee, C. Y. and Martin-Vega, L. A. (1992), A review of product planning and scheduling models in the semiconductor industry Part I : Systems characteristics, performance evaluation and production planning, lIE Transaction on Scheduling and Logistics, 24(4),47-60.
- Uzsoy, R, Lee, C. Y. and Martin-Vega, L. A. (1994), A review of product planning and scheduling models in the semiconductor industry Part II : Shop-floor control, lIE Transaction on Scheduling and Logistics, 26(5), 44-55
- Zargar, A. M. (1995), Effect Of Rework Strategies On Cycle Time, Computers & Industrial Engineering, 29(1/4),239-243 https://doi.org/10.1016/0360-8352(95)00078-F