• Title/Summary/Keyword: scheduling management

Search Result 1,280, Processing Time 0.023 seconds

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

Towards Game-Theoretic Negotiation for Traffic Light Control on Connected Cars: Preliminary Study (커넥티드 자동차의 교통신호 제어를 위한 게임이론 기반 협상전략 수립: 선행연구)

  • Bui, Khac-Hoai Nam;Jung, Jason J.
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2017.05a
    • /
    • pp.722-723
    • /
    • 2017
  • In this study, we take into account in improving traffic flow in real-time problem. In order to solve the problem, we propose a new approach to manage traffic flow at the intersection in real-time via controlling by traffic light scheduling. In particular, the proposed method is based on process synchronization theory and connected vehicle technology where each vehicle is able to communicate with others. The traffic deadlock is also taken into consideration in case of high traffic volume. The simulation shows the potential results comparing with the existing traffic management system.

  • PDF

A Real-Time Dispatching Algorithm for a Semiconductor Manufacture Process with Rework (재작업이 존재하는 반도체 제조공정을 위한 실시간 작업투입 알고리즘)

  • Shin, Hyun-Joon
    • Journal of the Semiconductor & Display Technology
    • /
    • v.10 no.1
    • /
    • pp.101-105
    • /
    • 2011
  • In case of high-tech process industries such as semiconductor and TFT-LCD manufactures, fault of a virtually finished product that is value-added one, since it has gone throughout the most of processes, may give rise to quality cost nearly amount to its selling price and can be a main cause that decreases the efficiency of manufacturing process. This paper proposes a real-time dispatching algorithm for semiconductor manufacturing process with rework. In order to evaluate the proposed algorithm, this paper examines the performance of the proposed method by comparing it with that of the existing dispatching algorithms, based on various experimental data.

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

A Study on the Estimating Process for Life Cycle Cost based on BIM (BIM기반 Life Cycle Cost 산정을 위한 프로세스에 관한 연구)

  • Lee, Hyun-Joo;Moon, Joon-Ho;Park, Gyu-Tae;Kim, Tae-Hee;Kim, Kwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.149-151
    • /
    • 2011
  • Recently, Architectural Design based on Building Information Modeling(BIM) is popular, construction management based on BIM is necessary. such as Quantity take off, scheduling, and Life Cycle Cost Estimating etc. Therefore, in the study, LCC Estimating using BIM Data, which is extracted from architectural designing process is proposed.

  • PDF

Rough-cut simulation algorithm for the decision of operations policy at the block paint shop in shipbuilding (조선 도장공정 운영전략 수립을 위한 사전모의실험기법)

  • Chung, Kuy-Hoon;Park, Chang-Kyu;Min, Sang-Gyu;Park, Ju-Chull;Cho, Kyu-Kab
    • IE interfaces
    • /
    • v.14 no.1
    • /
    • pp.59-66
    • /
    • 2001
  • This paper introduces the case study that has been performed at the block paint shop, Hyundai Heavy Industries. First of all, the overall production processes of shipbuilding and research activities conducted by Korean are reviewed with a view-point of production planning. Then HYPOS(Hyundai heavy industries Painting shop Operation System) project is briefly described, which has several modules such as planning module, scheduling module, work order module, and DB(database) management module. Although the HYPOS system has several modules, this paper mainly focuses on the planning module that utilizes the rough-cut simulation algorithm to make a decision about the policy for production schedule. The HYPOS has been operated since June, 2000 and the operation data has been collected for the purpose of future evaluation about the performance of HYPOS system. The evaluation of HYPOS will be shown in a public domain as soon as the enough operation data is available.

  • PDF

Comparison of Three Evolutionary Algorithms: GA, PSO, and DE

  • Kachitvichyanukul, Voratas
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.3
    • /
    • pp.215-223
    • /
    • 2012
  • This paper focuses on three very similar evolutionary algorithms: genetic algorithm (GA), particle swarm optimization (PSO), and differential evolution (DE). While GA is more suitable for discrete optimization, PSO and DE are more natural for continuous optimization. The paper first gives a brief introduction to the three EA techniques to highlight the common computational procedures. The general observations on the similarities and differences among the three algorithms based on computational steps are discussed, contrasting the basic performances of algorithms. Summary of relevant literatures is given on job shop, flexible job shop, vehicle routing, location-allocation, and multimode resource constrained project scheduling problems.

Dynamic Scheduling Strategy for Real Time Network Monitoring (실시간 네트워크 모니터링을 위한 동적 스케줄링 방법)

  • 천진영;최상방
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2001.04a
    • /
    • pp.244-246
    • /
    • 2001
  • SNMP(Simple Network Management Protocol) 네트워크 모니터링에서 에이전트 정보가 시간에 따라 변하는 정보인 경우 메니저는 이를 시간 지연 없이 관찰할 필요가 있으며, 이 때 주로 폴링(Polling)을 사용한다. 폴링에서는 한번의 에이전트 정보 전송을 위해서는 두 번의 메시지(요구와 응답) 전송이 필요하다. 본 논문에서는 기존의 폴링 방법보다 적은 네트워크 부하로 여러 에이전트 시스템을 실시간으로 모니터링 하는 동적 스케줄링 방법을 제안한다. 제안한 방법에서는 각 에이전트가 정보의 시간적 변화량에 따라 최적의 에이전트 모니터링 주기를 결정하고 매니저는 이 주기들을 취합하여 모니터링에 의한 부하가 전체 네트워크 부하의 일정 부분이하가 되도록 메니저 모니터링 주기를 결정하게된다. 에이전트는 최종적으로 메니저 모니터링 주기에 따라 스스로 정보를 전송함으로써 기존의 폴링방법보다 상대적으로 적은 네트워크 부하로 실시간 모니터링이 가능하다. 본 논문에서는 기존의 SNMP 폴링과 제안된 방법에 대해 설명을 하고 SNMP를 이용한 제안된 방법의 구현 시 필요한 구조를 제시하고 시뮬레이션을 이용하여 기존의 방법과 제안된 방법을 평가한다.

Work-order System for Make-to-orders (수주 산업에서의 작업지시 시스템)

  • Mok, Hak-Soo;Shin, Hyun-Chang
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.177-190
    • /
    • 1998
  • The work-order performs an important role in make-to-order production. The development of work-order system in this production is more complex than work-order system in planing production. To construct work-order system, load of directors for work-order must be decreased, and production management between scheduling of master plan and current workshop conditions must be considered. In this study, we grasped troubles in present work-order system and flows of information for work order. Using these results are made database schemas and data flow diagrams for effective development of work-order system. And then, for successful establishment of work-order system and actual use of directors, we considered systematic and easy user-interface. For a case study, development procedures of work-order system are presented for plant factory.

  • PDF

Supporting Real-Time Multimedia Traffic in a wireless LANs

  • Shin, Myung-Sik;Yang, Hae-Sool
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2008.08a
    • /
    • pp.249-252
    • /
    • 2008
  • This paper presents a new dynamically adaptable polling scheme for efficient support of real-time traffic over an IEEE 802.11 wireless LAN network. The poll scheduling plays an important role in IEEE 802.11 PCF. However, the current version of the polling list management scheme proposed in the IEEE802.11 standard is inefficient when a variable number of mobile stations have variable packets to transmit. If Point Coordinator has an exact information on the station status, it is possible to efficiently perform polling. In this thesis, we suggest an adaptable polling scheme to meet requirements of the stations. In our scheme, each station transmits packets including a piggyback information to inform that it wants to receive a poll in the next polling duration. Simulation results indicate that our scheme may reduces the packet discard ratio and real-time packet transfer delay.

  • PDF